Jeffrey Fitch
Engineer · Sfa Design Group Llc · Tigard
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-64889First issued Jan 23, 2003, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 37 permits since 2012, 37 in the last 5 years. Latest filed Oct 9, 2026.
- What kind of projects?
- Seismic retrofit or foundation 31 · Home remodel 2 · Retaining wall or site work 2
- How long do their permits take?
- Seismic retrofit or foundation: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 31 permits in San Francisco
Time to get a permit
Median from filing to permit, from 25 issued permits filed since 1966; 4 still in review. City is the San Francisco median for the same kind of review, from 18,265 permits.
Where
- West of Twin Peaks8
- Portola3
- Twin Peaks2
- Oceanview/Merced/Ingleside2
Most recent
- 15 Macondray Ln #0Voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage.Jul 17, 2026Filed
- 215 Foerster StVoluntary foundation repair. stabilize the foundation where push piers are installedJun 25, 2026Filed
- 3723 Market StVoluntary foundation repair. stablize foundation where piers are installed.Feb 10, 2026Issued
- 651 Colby StVoluntary foundation repair. stabilize foundation where piers are installedJan 7, 2026Filed
- 645 Colby StVoluntary foundation repair for stabilization to adjacent neighboring property installing piers.Jan 7, 2026Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 2, 2026 | 505 Diamond St Rev to pa# 2025-1219-2237: adding voluntary foundation replacement. sectional removal and replacement of the foundation. Filed | Revision or supplement | Filed | — | |
| Oct 13, 2026 | 353 Rivera St #0 Revision to pa# 202601234425, 202602105600, 202602206224, 202603197892, 202604028751: this revision consists of doing foundation replacement. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 9, 2026 | 2566 29th Av Voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchars are installed. voluntaring retaining wall repair. stabilize retainnig wall where push piers are installed. Issued | Retaining wall or site work | Issued | Within 1 month | |
| Oct 9, 2026 | 2562 29th Av Voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchors are installed. voluntary retaining wall repair. stabilize retaining wall where push piers are installed. Issued | Retaining wall or site work | Issued | Within 1 month | |
| Sep 9, 2026 | 353 Rivera St Revision to pa 202601234425, 202602105600, 202602206224, 202603197892 the only changes on this revision is the verbage on sheet s2.1 stating the max distance from 6ft to 8ft we are also adding 33 helical piers to the project, and seismic upgrade of the building. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 13, 2026 | 4320 18th St Revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same. Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 17, 2026 | 15 Macondray Ln #0 Voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage. Filed | Seismic retrofit or foundation | Filed | — | |
| Jul 14, 2026 | 4320 18th St Voluntary floor support stabilize the floor system above where smart jacks are installed. voluntary crawl space drainage with hydraway drainage and smart sump pump Issued | Home remodel | Issued | Within 1 month | |
| Jun 25, 2026 | 215 Foerster St Voluntary foundation repair. stabilize the foundation where push piers are installed Filed | Seismic retrofit or foundation | Filed | — | |
| Apr 23, 2026 | 505 Diamond St Construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck. Issued | AdditionType unconfirmed | Issued | 5 months | |
| Mar 31, 2026 | 1047 Shrader St Add (1) new footing for deck support at rear of home. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Mar 19, 2026 | 353 Rivera St Revision to pa #202601234425,202602105600,202602206224.we will be adding 5 push piers with 5 pier spacers as shown on sheets s2.1, s4.3 & s4.4 there will be 6 push piers in total. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 13, 2026 | 1047 Shrader St Voluntary floor support stabilize floor system above where the smart jacks are installed Issued | Home remodel | Issued | Within 1 month | |
| Feb 20, 2026 | 353 Rivera St Revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacement Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 10, 2026 | 3723 Market St Voluntary foundation repair. stablize foundation where piers are installed. Issued | Seismic retrofit or foundation | Issued | 6 months | |
| Jan 28, 2026 | 17 Hodges Al Revision to pa 202509306367 this revision consists of changing the wood beam size from 2x10 to 2x12 shown on sheet s2.1 Filed | Revision or supplement | Filed | — | |
| Jan 7, 2026 | 651 Colby St Voluntary foundation repair. stabilize foundation where piers are installed Filed | Seismic retrofit or foundation | Filed | — | |
| Jan 7, 2026 | 645 Colby St Voluntary foundation repair for stabilization to adjacent neighboring property installing piers. Filed | Seismic retrofit or foundation | Filed | — | |
| Nov 14, 2025 | 139 Byxbee St Revision to 20250903431. relocating e 3 smart jackes as shown pg s2.1. adding horizontal crack repair with carbon armour as shown sheet s2.1. adding 8 spacers to each push pier as shown on sheet s4.3.4 ft total of crack repair,2 ft ea crack Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 10, 2025 | 17 Hodges Al This is a revision to pa#2025-0930-6397 (2) 2 x12 wood beam s2.1 Issued | Revision or supplement | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.