John Bonner Kleman
Architect · Kleman Design
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36418First issued Apr 7, 2017, expires Sep 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 9 permits since 2017, 9 in the last 5 years. Latest filed Apr 3, 2026.
- What kind of projects?
- Addition 4 · Home remodel 3 · ADU 1
- How long do their permits take?
- Addition: 9 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,386 permits.
Where
- Portola1
- Outer Richmond1
- Bernal Heights1
- Presidio Heights1
Most recent
- 800 Colby StConvert portion of 1/f to habitable space (1,178sq.ft.), add: (1)bedroom, (1)full bathroom, 1/2 bathroom, laundry, closet, family room, separate garage. voluntary seismic upgrade/partial fndtn replacement. new ext 1/f doors/windows pr0posed for non street facing.Nov 4, 2022Issued
- 643 17th AvA partial remodel of the 2nd floor-including the conversion of existing attic space to a new storage loft and the addition of two new dormers following the zoning administrator bulletin no.3.Oct 20, 2022Cancelled
- 7 Winfield StInterior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck.Feb 28, 2022Complete
- 138 Arguello BlRemove (e) bay window & skylight. (n) windows & expanded bay @ rear of building.Sep 16, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 3, 2026 | 295 Staples Av Replace west wall with hardie board siding & windows in like kind because of dry rot repair. replace framing. Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Aug 12, 2025 | 138 Arguello Bl Replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylights Complete | Other | Complete | Within 1 month | |
| Nov 4, 2022 | 800 Colby St Convert portion of 1/f to habitable space (1,178sq.ft.), add: (1)bedroom, (1)full bathroom, 1/2 bathroom, laundry, closet, family room, separate garage. voluntary seismic upgrade/partial fndtn replacement. new ext 1/f doors/windows pr0posed for non street facing. Issued | AdditionType unconfirmed | Issued | 3 months | |
| Oct 20, 2022 | 643 17th Av A partial remodel of the 2nd floor-including the conversion of existing attic space to a new storage loft and the addition of two new dormers following the zoning administrator bulletin no.3. Cancelled | AdditionType unconfirmed | Cancelled | 2 months | |
| Feb 28, 2022 | 7 Winfield St Interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck. Complete | Addition | Complete | 14 months | |
| Sep 16, 2019 | 138 Arguello Bl Remove (e) bay window & skylight. (n) windows & expanded bay @ rear of building. Complete | AdditionType unconfirmed | Complete | 26 months | |
| Jun 12, 2019 | 138 Arguello Bl Remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place. Complete | Home remodel | Complete | Within 1 month | |
| Jun 13, 2018 | 1867 Jefferson St Revision to application #201708033781. replace an existing building mounted guardrail with balcony (22" x 74.5"), and install new awning above balcony and exist adjacent windows on the 3rd fl rear elevation. Issued | Revision or supplement | Issued | 11 months | |
| Sep 18, 2017 | 27 Talbert Ct Remodel kitchen & bath room on main level. upgrade (1) main electrical and (1) subpanel. Complete | Home remodel | Complete | Within 1 month | |
| Jul 7, 2017 | 1 Bemis St (n) 3rd flr addition; bay window @ 2nd & 3rd flrs, (n) rear deck & stair to replace (e) interior remodel throughout. 1 new bedroom & 1 new bath. per adu ord# 95-17. Complete | ADU | Complete | 11 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you John Bonner Kleman? Request a correction.