Julio Cesar Guerrero
Architect · Guerrero Design · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38612First issued Jun 9, 2020, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2020, 14 in the last 5 years. Latest filed Jan 23, 2025.
- What kind of projects?
- Commercial or tenant improvement 7 · Legalize or fix a violation 3 · Home remodel 2
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 5,275 permits.
Where
- Russian Hill2
- Inner Sunset1
- Financial District/South Beach1
- South of Market1
Most recent
- 1210 09th Av #0Change of use from retail to restaurant. int. remodel of a vacant g/f retail space into a new restaurant space, including new non-rated int. partitions, new finishes, lighting, plumbing, and electrical scope in kitchen area. ext. changes include new painting and signage (sign under separate permit)Dec 2, 2024Complete
- 425 Mission StProj-24-0586 -tjpa mou - t.i. space 147 - build out associated with barebottle (retail service facilities - bar) located on ground level of the transit center building at the west side of the grand hall.Sep 16, 2024Approved
- 2300 Polk St(e) restaurant bar minor remodel- new customer serving line in the front area, new finishes and paint color, new restaurant equipment, no changes to rear of (e) structure, minor electrical and plumbing modifications.Jun 14, 2024Complete
- 372 Ritch StNew canabis dispensary tenant improvement to a single story (e) ground floor space.Apr 8, 2024Filed
- 1520 Pacific AvChange of use from b to i-4. new child care facility @ e vacant medical office.Apr 27, 2023Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 3, 2025 | 1210 09th Av #0 Permit to add approved conditional use permit #2024-009436 prj to this project site. the original t.i permit 202412025959 only has approved a non-formula restaurant. no other work on this permit. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 23, 2025 | 3953 Geary Bl To comply with nov#202180081. propose legalize condensor unit on the roof. remove covering and add 3 sided mechanical enclosure. painted to match building. Complete | Legalize or fix a violation | Complete | 2 months | |
| Dec 2, 2024 | 1210 09th Av #0 Change of use from retail to restaurant. int. remodel of a vacant g/f retail space into a new restaurant space, including new non-rated int. partitions, new finishes, lighting, plumbing, and electrical scope in kitchen area. ext. changes include new painting and signage (sign under separate permit) Complete | Commercial or tenant improvement | Complete | 2 months | |
| Nov 18, 2024 | 4442 03rd St Comply with nov #202424502 as built for (n) exterior security gate Complete | Legalize or fix a violation | Complete | 2 months | |
| Sep 26, 2024 | 425 Mission St Proj-24-0603 - tjpa mou - new metal pergola addition to the barebottle container structure at salesforce transit center park. ref pa# 2022.0701.7592. Filed | Deck, stairs or patio cover | Filed | — | |
| Sep 25, 2024 | 785 Page St Replacement of (e) concrete retaining wall currently buckling with the potential of collapse. new design includes new footings, concrete stem wall, with a 6'0" privacy fence to match existing conditions. Complete | Retaining wall or site work | Complete | 2 months | |
| Sep 16, 2024 | 425 Mission St Proj-24-0586 -tjpa mou - t.i. space 147 - build out associated with barebottle (retail service facilities - bar) located on ground level of the transit center building at the west side of the grand hall. Approved | Commercial or tenant improvement | Approved | — | |
| Jun 14, 2024 | 2300 Polk St (e) restaurant bar minor remodel- new customer serving line in the front area, new finishes and paint color, new restaurant equipment, no changes to rear of (e) structure, minor electrical and plumbing modifications. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Apr 8, 2024 | 372 Ritch St New canabis dispensary tenant improvement to a single story (e) ground floor space. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 1, 2023 | 1155 Indiana St Ste 115: install 2 ceiling mounted natural gas heaters in warehouse/ storage space. tube heaters are sunster 5ps series natural gas infrared tube tough guy (30" lenghth, 7500 btu) & omega ii natural gas. create new wall opening. revision to 202302131856 Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 27, 2023 | 1520 Pacific Av Change of use from b to i-4. new child care facility @ e vacant medical office. Issued | Commercial or tenant improvement | Issued | 8 months | |
| Dec 22, 2022 | 425 Mission St Proj-22-0522; tjpa ti mou permit for bare bottle park space# p-02. fire alarm as-built. ref pa# 202211227062. Approved | Revision or supplement | Approved | — | |
| Jul 18, 2022 | 4901 03rd St To comply with nov 202065461. new as-built drawings of (n) storefront work, completed without a permit. Complete | Legalize or fix a violation | Complete | 7 months | |
| Jul 11, 2022 | 157 Glenview Dr Creation of new room in (e) unfinished garage & storage space. (e) bathroom to remain as is. Complete | Home remodel | Complete | 3 months | |
| May 6, 2022 | 2130 Harrison St #4 1st fl restroom renovation; (n) lighting, shower addition, relocate wash/dry, in-kind kitchen, renovation of cabinets, lighting fixtures, appliances, upgrade lighting throughout, paint & new lvt flooring. Complete | Home remodel | Complete | 10 months | |
| Aug 3, 2021 | 1515 03rd St #0 T.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Sep 26, 2020 | 3435 Geary Bl New child care facility (e) in an existing vacant, retail (b) space, all existing ada compliant restroom, lighting, electrical & mechanical components to remain. new half-wall & platform in this permit submittal. ** maher: n/a ** Complete | Commercial or tenant improvement | Complete | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Julio Cesar Guerrero? Request a correction.