CheckMyDesigner

Kam Wing Yan

Engineer · Kam Yan & Assoc. · Oakland

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-3312First issued Jan 26, 1990, expires Dec 31, 2026.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
21 permits since 2004, 21 in the last 5 years. Latest filed Aug 19, 2026.
What kind of projects?
Seismic retrofit or foundation 7 · Commercial or tenant improvement 6 · Home remodel 3
How long do their permits take?
Commercial or tenant improvement: 7 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
29 permits that name Kam Wing Yan, newest first, including 8 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Aug 19, 2026676 Noe St

Renovation/ restoration of (e) 1 fmaily dwelling due to fire. (e) roof frame to remain. interiors to be reconstructed similar to (e). replacement of all windows, doors in similar locations, replacement of all lighting and hvac.

Filed
May 5, 20261558 15th St

Change of use approved under 202512161870. t.i. improvements include soft demo, mezzanine structure, partitions, accessible features, and restrooms, elect and lights. mechanial deferred.

Issued
Feb 18, 20252241 Geary Bl

Replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipment

Filed
Sep 20, 20222068 14th Av

Replace leaking (e) skylight with new metal roof

Issued
Jul 7, 202240 Alta St

Revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137.

Complete
Jul 7, 202250 Alta St

Revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135.

Complete
Sep 30, 20202765 Hyde St

Repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails.

Issued
Aug 17, 20201327 A Columbus Av

New revised retaining walls structural design. as after demolition, site condition is different than the original structure design of the retaining wall.

Complete
Feb 27, 2020135 Van Ness Av

Replacement of fire pump

Issued
Aug 30, 201811 Glenview Dr

Provide shoring on north sitde of the bld for new addition. ref pa#201507091010.

Complete
Oct 23, 2017583 Haight St

To comply with nov #201705341: 585 haight st rear side wall replacement due to dry rot damage. (unsafe)work not to include the stairs with this permit app. revision permit of applicaiton # 201604198147

Issued
Sep 5, 201740 Alta St #0

Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4

Complete
Aug 10, 2017501 47th Av

Voluntary strengthening of existing building foundation

Complete
May 30, 201750 Alta St

Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundation

Complete
Apr 14, 20172007 Buchanan St

Soft story retrofit #41-13 mandatory program tier 3

Complete
Apr 6, 20171422 Noriega St

Remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwall

Complete
Dec 22, 20162235 Hayes St

Ada barrier removal. (no exterior work). to remove architectural barriers to provide a greater degree of accessibility to the features & amenties @ the dignity health, st. mary's medical center which includes: elevator control panel adj., signage replacement, restroom remodel & door hardward updates

Complete
Sep 14, 20163431 Taraval St

Renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrt

Complete
May 23, 20161019 Clement St

Revision to pa #201604124578: revise column & foundation detail. n/a maher ordinance

Complete
Aug 11, 2015865 San Jose Av

Soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Kam Wing Yan? Request a correction.