Karen Anne Eichler
Architect · Eichler Davies Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-32415First issued Jan 12, 2010, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 34 permits since 2005, 34 in the last 5 years. Latest filed Nov 3, 2026.
- What kind of projects?
- Addition 8 · Other 8 · Commercial or tenant improvement 7
- How long do their permits take?
- Addition: 10 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 872 permits.
Where
- Outer Richmond2
- Inner Richmond2
- Haight Ashbury1
- Presidio Heights1
Most recent
- 856 Clayton StA horizontal rear addition at all floors of structure, and rear deck infill at 2nd floor, a (n) roof deck will be built above (n) conditioned floor space at 2nd floor-accessed from 9e) third floor. a (n) shed roof dormer has been added ar the north side of the 9e) gable roof for an (e) 3rd floor b..Nov 3, 2026Filed
- 3311 Pacific Av107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay.Jun 22, 2022Complete
- 2732 Balboa St31.8sf of conditioned space will be added to (e) laundry rm & (e) bedroom & 9e) kitchen will be remodeled. (3) (e) windows at (e) bedroom to be removed, & (n) sliding door unit installed. (e) exterior door at (e) laundry rm will be removed, add (n) door at rear laundry rm addition.Dec 6, 2021Cancelled
- 730 10th AvConvert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump.Nov 18, 2021Complete
- 775 Pacheco St296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation onlyMay 7, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 3, 2026 | 856 Clayton St A horizontal rear addition at all floors of structure, and rear deck infill at 2nd floor, a (n) roof deck will be built above (n) conditioned floor space at 2nd floor-accessed from 9e) third floor. a (n) shed roof dormer has been added ar the north side of the 9e) gable roof for an (e) 3rd floor b.. Filed | Addition | Filed | — | |
| May 20, 2025 | 151 15th Av Legalize rear deck and to comply with complaint#: 201782961: item 2,3,4 and 5. Complete | Legalize or fix a violation | Complete | 3 months | |
| Jun 22, 2022 | 3311 Pacific Av 107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay. Complete | Addition | Complete | 10 months | |
| Dec 6, 2021 | 2732 Balboa St 31.8sf of conditioned space will be added to (e) laundry rm & (e) bedroom & 9e) kitchen will be remodeled. (3) (e) windows at (e) bedroom to be removed, & (n) sliding door unit installed. (e) exterior door at (e) laundry rm will be removed, add (n) door at rear laundry rm addition. Cancelled | Addition | Cancelled | 14 months | |
| Nov 18, 2021 | 730 10th Av Convert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump. Complete | Addition | Complete | 13 months | |
| Sep 2, 2020 | 866 31st Av 2nd flr: add powder room & remodel kitchen. 3rd floor: remodel bathroom & add full bathroom. openings at rear wall of house changed. 3rd floor (2) windows replaced and moved. 2nd floor (n) sliding door. no conditioned space added. Complete | Home remodel | Complete | 2 months | |
| Dec 17, 2019 | 163 04th Av Convert 354.2 sq ft ground floor storage space - unconditioned to conditioned livable space - home office. new rear door & window facing rear yard and 2 side property line windows, 3/4 hour fire rated units. new full bathroom added to space. Complete | Home remodel | Complete | 7 months | |
| May 7, 2019 | 775 Pacheco St 296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation only Complete | Addition | Complete | Within 1 month | |
| May 23, 2017 | 714 Duncan St (n) wood deck within buildable area of lot - access from 2nd fl. 87.5 sf (n) 6'-0" w x 6'-8" (h) sliding doors @ living rm. (n) lower deck portion & (n) wood stair 53.3 sf (e) wood lower deck & stair demo 50.2 sf Complete | Deck, stairs or patio cover | Complete | 5 months | |
| Dec 9, 2016 | 303 Caselli Av Interior remodel to 2nd floor flat. bathroom location moved & kitchen moved. new windows at south & east elevation and 1 fire rated 3/4 hr window at west elevation. no foundation work except interior footings at first floor (garage) for new posts Complete | Home remodel | Complete | 3 months | |
| Jun 8, 2015 | 730 10th Av Moving kitchen into (e) dining room - appliances, electrical, plumbing. adding a (n) powder room at approx imately (e) coat closet location. Complete | Home remodel | Complete | Within 1 month | |
| May 6, 2014 | 2261 Fulton St 3 of 4 units in tic bldg going thru condo conversion have balconies insp. requiries (e) (3) balconies be replaced no record of permit and not compliant to current codes. new wood decks with posts & f.r. wall to grade to replace cantilevered balconies. one new wall sconce at (3)exist.doors to(n) Complete | Deck, stairs or patio cover | Complete | 7 months | |
| Jul 9, 2013 | 126 18th Av Demolition of (e) structurally unsound addition. new addition & remodel fourth story added to house, house to be fully sprinklered. Complete | Addition | Complete | 16 months | |
| Mar 8, 2013 | 2506 Filbert St An (e) 40 sf dormer with hip roof needs replaced due to dry rot and disrepair a new 85 sf dormer with shed roof will be built in its place (n) dormer to have a composite shingle roof and painted ship lap siding to match house a new fixed "velux" skylight Complete | OtherType unconfirmed | Complete | 3 months | |
| Mar 20, 2012 | 2506 Filbert St Full interior remodel, in-fill addition @ north elevation (rear) of house only. south elevation (front-filbert st). remodel-widen (e) garage door by 2'0" & driveway (e) front brick planters to be reworked for wider driveway. 1 brick step from public right of way to brick entry porch to be moved. all Complete | Addition | Complete | 3 months | |
| Aug 2, 2011 | 62 05th Av Removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interior Complete | Addition | Complete | 6 months | |
| Jul 6, 2011 | 1395 Van Ness Av New sprinkler system on all floors: new 1,000 gpm fire pump; new class i standpipe (existing dry standpipe to remain); existing 8-inch fire service with new 8 inch backflow ddc; 1,464 sprinklers total. Complete | Other | Complete | 2 months | |
| Jul 6, 2011 | 814 Mission St Relocate (e) deli entrance and new storefront (tenant improvement under separate permit). Complete | Commercial or tenant improvementType unconfirmed | Complete | 4 months | |
| Jun 6, 2011 | 1264 09th Av #0 Underpinning for work on adjacent property at 1266 - 9th ave (ref pa #200912183521). Complete | Seismic retrofit or foundationType unconfirmed | Complete | 9 months | |
| Jun 6, 2011 | 1266 09th Av Shoring & excavation fo rnew bldg approved under pa #200912183521-s. Complete | Retaining wall or site work | Complete | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Karen Anne Eichler? Request a correction.