Kaveh Rad
Engineer · Kaveh Rad · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3638First issued Sep 25, 1992, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 15 permits since 2002, 15 in the last 5 years. Latest filed Aug 11, 2023.
- What kind of projects?
- Seismic retrofit or foundation 7 · Home remodel 4 · Legalize or fix a violation 2
- How long do their permits take?
- Home remodel: 5 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966.
Where
- Mission2
- Russian Hill2
- Marina2
- Pacific Heights1
Most recent
- 155 Fair Oaks StMandatory soft story seismic work; sfebc chapter 4d; app a4.Aug 29, 2018Complete
- 1750 Washington StSoft story seismic retrofit pre sfebc ch 4d, 2016 cebc a4Aug 24, 2017Complete
- 1430 Clay St #0Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Jul 6, 2017Complete
- 744 Guerrero StSoft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Jul 6, 2017Complete
- 2528 Washington St #0Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Jul 6, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 11, 2023 | 464 Douglass St Remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st). Complete | Home remodel | Complete | 2 months | |
| Aug 4, 2023 | 464 Douglass St Facade refresh only - remove and replace stucco, new architectual elements as shown on plan, new windows, trim. all within property lines. Complete | Other | Complete | 3 months | |
| Mar 25, 2021 | 1701 Franklin St Kitchen remodel and shear wall alteration. Issued | Home remodel | Issued | 2 months | |
| Feb 26, 2020 | 3020 Fillmore St Ground level structural work; voluntary structural strengthening of lower floor. Complete | Home remodel | Complete | 7 months | |
| Jul 12, 2019 | 98 Ney St Replace (e) retaining wall to comply with nov 201814921. Complete | Legalize or fix a violation | Complete | 2 months | |
| May 15, 2019 | 1430 Clay St Soft story retrofit: revision to app#201707061117 1) added door in garage shear wall. 2)add simpson shearwall at front. 3) dbl sided shearwall at rear of garage in lieu of adjacent shearwall at storage rm. 4)relocated shr ply from meter area to adjacent garage wall. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 29, 2018 | 155 Fair Oaks St Mandatory soft story seismic work; sfebc chapter 4d; app a4. Complete | Seismic retrofit or foundation | Complete | 12 months | |
| Aug 24, 2017 | 1750 Washington St Soft story seismic retrofit pre sfebc ch 4d, 2016 cebc a4 Complete | Seismic retrofit or foundation | Complete | 13 months | |
| Jul 6, 2017 | 1430 Clay St #0 Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 Complete | Seismic retrofit or foundation | Complete | 5 months | |
| Jul 6, 2017 | 744 Guerrero St Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 Complete | Seismic retrofit or foundation | Complete | 5 months | |
| Jul 6, 2017 | 2528 Washington St #0 Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Oct 14, 2016 | 172 Beaumont Av Gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony & Issued | Addition | Issued | 10 months | |
| May 19, 2014 | 2648 Gough St #0 Soft story retrofit per sfbc chapter 34b, calc method 1613 s.f. bldg code. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Apr 17, 2013 | 3024 Fillmore St Replace bathroom. new front door. remove one bearing wall and provide beam and post system. Complete | Home remodel | Complete | 7 months | |
| Apr 17, 2013 | 3024 Fillmore St Voluntary soft story seismic upgrade per ab-094. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Feb 15, 2002 | 289 Castro St Repair (e) exterior stairs per nov Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kaveh Rad? Request a correction.