Kenneth Mccracken
Architect · Pm Design Architectural · Camas
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-32095First issued Jul 14, 2009, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2019, 12 in the last 5 years. Latest filed May 12, 2025.
- What kind of projects?
- Commercial or tenant improvement 11 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: 5 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,156 permits.
Where
- Financial District/South Beach3
- North Beach1
- Bayview Hunters Point1
- Outer Mission1
Most recent
- 211 Jefferson StChange of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvementsMay 12, 2025Complete
- 5411 03rd StFront counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for adaDec 22, 2022Complete
- 5454 Mission St(n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada.Oct 11, 2022Complete
- 235 Front StFront counter updgrade, relocate and addition of kitchen equipment.Oct 11, 2022Issued
- 1100 Fillmore StUpgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation.Sep 15, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 14, 2026 | 211 Jefferson St Revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 10, 2026 | 255 Winston Dr Revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes Issued | Revision or supplement | Issued | 1 month | |
| Jan 5, 2026 | 211 Jefferson St Reference to pa#202412176961, owner reflected exterior and interior changes. Complete | Revision or supplement | Complete | 3 months | |
| May 12, 2025 | 211 Jefferson St Change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements Complete | Commercial or tenant improvement | Complete | 6 months | |
| Jun 20, 2023 | 441 Sutter St Obtain permit to existing c02 tank Issued | OtherType unconfirmed | Issued | 4 months | |
| Dec 22, 2022 | 5411 03rd St Front counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for ada Complete | Commercial or tenant improvement | Complete | 3 months | |
| Oct 11, 2022 | 5454 Mission St (n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Oct 11, 2022 | 235 Front St Front counter updgrade, relocate and addition of kitchen equipment. Issued | Commercial or tenant improvement | Issued | 8 months | |
| Sep 15, 2022 | 1100 Fillmore St Upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 10, 2022 | 441 Sutter St Front counter upgrade, relocate & addition of kitchen equipment @ front counter area Complete | Commercial or tenant improvement | Complete | 5 months | |
| Aug 3, 2022 | 255 Winston Dr Upgrade front counter, relocate and addition of kitchen equipment at front counter Complete | Commercial or tenant improvement | Complete | 5 months | |
| Jul 20, 2022 | 302 Potrero Av Upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Aug 8, 2019 | 52 California St Provide and install new nitrogen infused coffee dispenser.//the total amount of nitrogen is 18lbs, there are 6 kegs of 3 lbs each... this does not require an operational permit according to cfc 105.6.11 Cancelled | Commercial or tenant improvementType unconfirmed | Cancelled | — | |
| Jul 30, 2019 | 1231 Market St Provide and install new nitrogen infused coffee dispenser Cancelled | Commercial or tenant improvementType unconfirmed | Cancelled | — | |
| Jul 30, 2019 | 675 Portola Dr Provide and install new nitrogen infused coffee dispenser Cancelled | Commercial or tenant improvement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kenneth Mccracken? Request a correction.