Kevin Michael Skiles
Architect · Zack/Devito Architecture · Mill Valley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-28857First issued Mar 5, 2002, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 40 permits since 2004, 40 in the last 5 years. Latest filed Sep 24, 2026.
- What kind of projects?
- Home remodel 12 · Other 9 · Commercial or tenant improvement 8
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 11 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,900 permits.
Where
- Mission4
- Glen Park1
- Haight Ashbury1
- Outer Richmond1
Most recent
- 231 30th StInterior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.May 21, 2026Issued
- 445 Upper Tr #6Unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior workMay 18, 2023Complete
- 683 28th AvGarage level excavate rear to allow for 8' ceiling in renovated spaces to create a conditioned office workshop w/powder bath. all added conditioned space w/ in (e) bldg envelope.Feb 1, 2022Complete
- 651 11th AvKitchen renovation and construction of master bath on main level.enclosure of space under sun room, bathroom & laundry renovationApr 19, 2019Complete
- 55 Dolores StInterior renovation at unit 3 at 55 dolores st. renovation includes construction of (n) 1/2 bath & renovation of (e) kitchen & bath. (n) dual glazed fiberglass windows to replace (e) windows. (n) high efficacy light installed throughoutDec 8, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 24, 2026 | 233 30th St Replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. Filed | Deck, stairs or patio cover | Filed | — | |
| Jun 4, 2026 | 732 Brannan St Renovation of interior office space, installation of new steel stair, installation of new non-structural partitions, and installation of new light fixture Issued | Commercial or tenant improvement | Issued | 1 month | |
| May 21, 2026 | 231 30th St Interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. Issued | Home remodel | Issued | Within 1 month | |
| May 7, 2026 | 732 Brannan St Renovation of exterior facade: refruburisment of one storefront door, removal of one store front door, replacement of 2 mandoors with 1 roll-up door and installation of new mandoor. Issued | Other | Issued | 3 months | |
| Mar 24, 2026 | 122 Kingston St Recommencement and completion of work approved under pa#201809140292 & pa#201910215091. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 19, 2026 | 732 Brannan St Soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work. Filed | Commercial or tenant improvement | Filed | — | |
| Apr 29, 2025 | 2750 Scott St #0 Replacement of (e) sliding glass door with sliding glass window not street visible Complete | Other | Complete | Within 1 month | |
| Jan 16, 2025 | 2247 Clement St Revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 6, 2023 | 564 Commercial St Replace 2 (e) doors and 1 window w/ new store front door and windows. Withdrawn | Other | Withdrawn | — | |
| Aug 9, 2023 | 158 08th Av To obtain final inspection for work approved under permit 202103096213. all work is complete. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Aug 2, 2023 | 564 Commercial St Base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenette Expired | Commercial or tenant improvement | Expired | 11 months | |
| Jun 22, 2023 | 2181 09th Av Revision to pa 202205063689. additional interior work: electrical and plumbing fixtures and finishes to upper basement and 1/f. no exterior work. Complete | Revision or supplement | Complete | Within 1 month | |
| May 19, 2023 | 445 Upper Tr #6 Repplace exisitng single pane alum windows in livingroom, kitchen & bedrooms, operation to match exisitng. u-fact of new windows max 0.30 replace existing open wire panels at balcony railing with glass panels. same size & location. Complete | Other | Complete | 1 month | |
| May 18, 2023 | 445 Upper Tr #6 Unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior work Complete | Home remodel | Complete | 1 month | |
| Mar 28, 2023 | 1132 Masonic Av #0 Revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 9, 2023 | 564 Commercial St Soft demo of interior tenant improvements on ground flr of bldg including fixtures, furniture and non-structural partitions, storage mezzanine and stairs to access mezzanine to be removed. no structural work, no exterior work. no work on floors 2 or 3. under ab-017 Expired | Commercial or tenant improvement | Expired | Within 1 month | |
| Dec 27, 2022 | 1100 Revere Av Demolish one-story type 3-b warehouse Complete | Other | Complete | 20 months | |
| Dec 27, 2022 | 1100 Revere Av To erect a one-story, type 3-b, warehouse. Issued | New building | Issued | 10 months | |
| Dec 9, 2022 | 418 Liberty St New proposed roof deck to existing 3-story building. Expired | Deck, stairs or patio cover | Expired | 1 month | |
| Oct 21, 2022 | 440 Bryant St Change of use from (e) warehouse to office. no work performed under this permit application. Filed | Commercial or tenant improvement | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kevin Michael Skiles? Request a correction.