Lisa Jay Gelfand
Architect · Gelfand Partners Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-17265First issued Jun 19, 1986, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 175 permits since 2006, 175 in the last 5 years. Latest filed Jul 15, 2026.
- What kind of projects?
- Other 103 · Home remodel 47 · Commercial or tenant improvement 15
- How long do their permits take?
- Home remodel: 5 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 103 permits in San Francisco
Time to get a permit
Median from filing to permit, from 101 issued permits filed since 1966.
Where
- Bayview Hunters Point91
- Western Addition6
- Russian Hill2
- Mission1
Most recent
- 1590 BroadwayRemove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair.Oct 5, 2023Complete
- 1515 Vallejo StRemove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs.Oct 5, 2023Expired
- 2205 Mission StDemolition of a 3 story, type v-b commercial structure.Aug 16, 2023Issued
- 220 Dolores StReplace portion of rotten wood porch in kind. replace roofing at both buildings on the property. install ada. install ada actuator & vertical push bar at rear accessible entry door. replace steel gate at south sideyard with accessible flatwork ramp. install wheelchair lift for rear door access.Jul 20, 2021Cancelled
- 838 Pacific AvPriority plan review. demo (e) emergency generator, provide (n) emergency generator at same location w/ fuel port, quick connect, electrical, mechanical, plumbing for new installation.Oct 9, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 15, 2026 | 152 Berry St Kitchen remodel, provide handwash sink and replacement of range and hood. Filed | Commercial or tenant improvement | Filed | Within 1 month | |
| Feb 24, 2025 | 459 Vienna St Replace plumbing fixtures, casework, and finishes in (2) restrooms & 1 kitchen @ 1st and 2nd floor. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 17, 2024 | 152 Berry St Change occupancy type e to i-4. exterior paly yard- new gate, accessibility improvement in restrooms. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Aug 9, 2024 | 216 Eddy St Adding one partition wall in basement. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 16, 2024 | 615 Grant Av Revision to pa# 202306291237, revise restroom layout. all work on 3rd and 4th floor. Issued | Revision or supplement | Issued | 3 months | |
| Oct 5, 2023 | 1590 Broadway Remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair. Complete | Other | Complete | 2 months | |
| Oct 5, 2023 | 1515 Vallejo St Remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs. Expired | Other | Expired | 2 months | |
| Aug 16, 2023 | 2205 Mission St Demolition of a 3 story, type v-b commercial structure. Issued | Other | Issued | 7 months | |
| Jun 29, 2023 | 615 Grant Av Office t.i.: new finishes, partitions, doors, restroom and breakrooms on 2nd and 3rd floors only. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Feb 17, 2023 | 177 Stillman St Remove small mezzanine & wood stairs to large mezzxanine, provide door to large mezz, remove door to (e)office, enlarge opening/replace w/accessible door, replace broken window panes in-kind & (e)garage door, install warehouse storage racks, provide new sink, casework & refrigerator Complete | Commercial or tenant improvement | Complete | 7 months | |
| Dec 9, 2022 | 615 Grant Av Revision to permit 202208150517. remove (2) wall on the 3/f server room. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 15, 2022 | 615 Grant Av Office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Aug 2, 2022 | 447 Minna St Revision to pa#202205234784. reconfigure bathroom. no change to number of plumbing fixtures. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 24, 2022 | 447 Minna St Commercial t.i. including kitchenette (sink, cabinet only). finishes + hvac on 3/f. add hvac on 1/f. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jun 14, 2022 | 1590 Broadway Replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior only Complete | Home remodel | Complete | 2 months | |
| May 23, 2022 | 447 Minna St 2nd fl - commercial ti inc - ada bathroom; kitchenette (only sinks and cabinets) and finishes only sinks and cabinets Complete | Commercial or tenant improvement | Complete | 1 month | |
| Mar 10, 2022 | 98 Battery St Suite 302: furniture/ module workstation plan only. ref pa# 202105190608. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Mar 9, 2022 | 554 Capp St Existing vacant cottage to be remodeled for use as music instruction space and restrooms. exterior improvements include a new roof, windows, doors, and paint. Issued | Commercial or tenant improvement | Issued | 6 months | |
| Jul 20, 2021 | 220 Dolores St Replace portion of rotten wood porch in kind. replace roofing at both buildings on the property. install ada. install ada actuator & vertical push bar at rear accessible entry door. replace steel gate at south sideyard with accessible flatwork ramp. install wheelchair lift for rear door access. Cancelled | OtherType unconfirmed | Cancelled | — | |
| May 19, 2021 | 98 Battery St 3rd fl, ste 302 office ti. demo breakroom ktichen and partial wall demo at breakroom for new interior window. provide new countertops, cabinets and fixtures at breakroom. provide new finishes throughout. no exterior of site work Complete | Commercial or tenant improvement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Lisa Jay Gelfand? Request a correction.