Madelyn Mayme Mcclellan
Architect · Novato
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-37097First issued May 29, 2018, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2019, 8 in the last 5 years. Latest filed Oct 5, 2023.
- What kind of projects?
- Commercial or tenant improvement 4 · Other 3 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Pacific Heights3
- Bernal Heights1
Most recent
- 555 San Jose AvWork on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware.Oct 5, 2023Complete
- 2333 Buchanan StInstall a wall mounted digital display and associated structural bracing, wall finishes, electrical and network work.Jan 28, 2021Complete
- 2333 Buchanan StErect a recessed ceiling for installation of a decorative glass sculpture at g/f of the main waiting area. remove (e) directional light at ceiling along back wall. modify (e) sprinkler for proposed recessed ceiling. no alteration of spaces, wall uses of space or occupant load.Oct 27, 2020Complete
- 2351 Clay St7th fl - the project consists of furniture recreation, electric additions to serve relocated furniture, and minor accessibility upgrades to comply with sfdbi and applicable code requirements.Dec 11, 2019Cancelled
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 7, 2023 | 2329 Sacramento St Revision to pa# 202304105412, replace (e) 2/f built up desk w/ (n) traffic coating & curb over polywood substrate, remove (e) gutter & relocate (e) drains to accomodate 1 (n) deck mount drain, remove & replace (e) railigns to accommodate roofing work, revise door type for 2 bathrms per flr. revise c Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 5, 2023 | 555 San Jose Av Work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Apr 10, 2023 | 2329 Sacramento St Interior cosmetic upgrade includes the replacement of door and hardware, flooring and finishes, light fixtures, plumbing fixtures, casework and kitchen appliances. no change to building footprint of interior walls. original building built in 1963. all accessibility upgrades are elective. Complete | Home remodel | Complete | 3 months | |
| Jan 28, 2021 | 2333 Buchanan St Install a wall mounted digital display and associated structural bracing, wall finishes, electrical and network work. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Jan 26, 2021 | 1100 Van Ness Av This project consists of adding (2) dc fast charging stations and electrical panel at garage level g2 Complete | Other | Complete | 2 months | |
| Oct 27, 2020 | 2333 Buchanan St Erect a recessed ceiling for installation of a decorative glass sculpture at g/f of the main waiting area. remove (e) directional light at ceiling along back wall. modify (e) sprinkler for proposed recessed ceiling. no alteration of spaces, wall uses of space or occupant load. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Sep 11, 2020 | 2329 Sacramento St Fire alarm replacement - includes installing a new notifier intelligent, addressable nfw-50 fire alarm system and new field devices per pre-application agreement with sffd. Complete | Other | Complete | 2 months | |
| Dec 30, 2019 | 1100 Van Ness Av Install (5) dual-port charging station for electrical vehicles by 'chargepoint' at garage level g3. install (2) steel bollards at each station and add electrical eqiupment at (e) electrical room. Cancelled | Other | Cancelled | — | |
| Dec 11, 2019 | 2351 Clay St 7th fl - the project consists of furniture recreation, electric additions to serve relocated furniture, and minor accessibility upgrades to comply with sfdbi and applicable code requirements. Cancelled | Commercial or tenant improvement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Madelyn Mayme Mcclellan? Request a correction.