Marc Andrew Steyer
Engineer · Tipping Structural Engineers · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-6022First issued Dec 18, 2013, expires Sep 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 31 permits since 2016, 31 in the last 5 years. Latest filed Oct 28, 2026.
- What kind of projects?
- Commercial or tenant improvement 18 · Home remodel 6 · Other 3
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 18 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 19,075 permits.
Where
- Financial District/South Beach9
- Tenderloin2
- Mission2
- Bayview Hunters Point2
Most recent
- 590 Van Ness AvG/f ti: halls, restroom, conference rooms, mep included.Oct 28, 2026Filed
- 720 California St #0This project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes.Oct 21, 2026Filed
- 1455 Market StFloor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electricSep 16, 2026Issued
- 590 Van Ness Av2/f: office t.i. including offices, breakroom, confereence rooms. includes mep.Jul 24, 2026Issued
- 555 California StL45-46 interconnecting stair. new finishes & banquette platform landingDec 22, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 28, 2026 | 590 Van Ness Av G/f ti: halls, restroom, conference rooms, mep included. Filed | Commercial or tenant improvement | Filed | — | |
| Oct 21, 2026 | 720 California St #0 This project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 16, 2026 | 1455 Market St Floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 16, 2026 | 1455 Market St Floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Aug 4, 2026 | 590 Van Ness Av 1st fl - structural reinforcement of existing floor. new columns and footings on basement level Issued | Home remodel | Issued | Within 1 month | |
| Jul 24, 2026 | 590 Van Ness Av 2/f: office t.i. including offices, breakroom, confereence rooms. includes mep. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Feb 23, 2026 | 201 03rd St Install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd street Issued | Other | Issued | Within 1 month | |
| Dec 22, 2025 | 555 California St L45-46 interconnecting stair. new finishes & banquette platform landing Issued | Commercial or tenant improvement | Issued | 3 months | |
| Dec 1, 2025 | 555 California St #0 45th fl - tenant improvement partitions, ceiing & finishes Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 3, 2025 | 376 Green St #0 Replacement of (e) dry-rot wooden rear egress stair in kind per sfbc 1011.12.3 as discussed at july 21, 2024 pre application plan review(option 1) Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Jul 29, 2025 | 300 California St 2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical. Complete | Commercial or tenant improvement | Complete | 3 months | |
| May 16, 2025 | 2675 Geary Bl L3- core "n" shell upgrade to vacant space. hvac, electrical, plumbing upgrades. structural strengthening space to remain vacant until future t.i. Issued | Commercial or tenant improvement | Issued | 6 months | |
| May 9, 2025 | 555 California St #0 52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep Issued | Commercial or tenant improvement | Issued | 3 months | |
| Sep 23, 2024 | 162 Randall St Revision to permit 202209122271 to update required special inspections, removing special inspection on 6 and 18 bc as they are not required. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 28, 2024 | 535 Mission St 24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 20, 2024 | 535 Mission St 25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 12, 2023 | 2300 Harrison St Roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility Complete | Deck, stairs or patio cover | Complete | 4 months | |
| Jun 16, 2023 | 220 Montgomery St Revision to pa# 202212198630, to incoporate the following changes- removal of items from t.i. scope and added to deffered submittals: 6.steel shelving @ axon & media wall, 7.steel framed structure @ reception hut. added typical anchorage details. Complete | Revision or supplement | Complete | Within 1 month | |
| May 15, 2023 | 100 Channel Install artwork in front of building Issued | OtherType unconfirmed | Issued | 3 months | |
| Dec 20, 2022 | 220 Montgomery St Mechanical, new energy recovery ventilator, 1 sound trap, 6 vrv condenser units. new electrical plumbing, new roof receptor for vrv. structural support for hvac equip Complete | Other | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Marc Andrew Steyer? Request a correction.