Michael J Baushke
Architect · Apparatus · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-25953First issued Oct 18, 1995, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 51 permits since 2005, 51 in the last 5 years. Latest filed Aug 14, 2026.
- What kind of projects?
- Home remodel 27 · Commercial or tenant improvement 8 · Addition 4
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 27 permits in San Francisco
Time to get a permit
Median from filing to permit, from 25 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Castro/Upper Market7
- Noe Valley5
- Mission3
- Haight Ashbury2
Most recent
- 2139 Green StUnit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights.Feb 18, 2026Complete
- 342 London StInterior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exteriorNov 24, 2025Complete
- 405 Hoffman AvRenovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind.Nov 14, 2025Complete
- 55 Ford St #03rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope.May 20, 2025Complete
- 82 Shore View AvRemodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelopeApr 22, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 14, 2026 | 1037 Filbert St #0 New deck light-well infill. Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Feb 18, 2026 | 2139 Green St Unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Nov 24, 2025 | 342 London St Interior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exterior Complete | Home remodel | Complete | 3 months | |
| Nov 14, 2025 | 405 Hoffman Av Renovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind. Complete | Home remodel | Complete | Within 1 month | |
| May 23, 2025 | 2252 Fillmore St Interior remodel of existing commercial mercantile space on the gr fl or a 3 story building. no change of occupancy, no structural work, no change to building envelope or facade. limited restaurane use. Complete | Commercial or tenant improvement | Complete | 3 months | |
| May 20, 2025 | 55 Ford St #0 3rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope. Complete | Home remodel | Complete | 2 months | |
| Apr 22, 2025 | 82 Shore View Av Remodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelope Issued | Home remodel | Issued | 3 months | |
| Sep 17, 2024 | 492 Bartlett St Revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 27, 2024 | 1238 26th Av Remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope. Complete | Home remodel | Complete | Within 1 month | |
| May 10, 2024 | 357 Elizabeth St Rev 202312263112 - includes changes to interior wall framing. no structural work, no work to exterior of building Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| May 2, 2024 | 207 Guerrero St #0 Interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building. Complete | Home remodel | Complete | Within 1 month | |
| Jan 11, 2024 | 2336 Chestnut St Ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Oct 12, 2023 | 75 Caselli Av Remodel of (e) kitchen and bathroom plus on new bath and one new 1/2 bath conversion of lower level crawl space to habitable space, no expansion of (e) building envelope new winows at street facade Complete | Home remodel | Complete | Within 1 month | |
| May 2, 2023 | 601 Arkansas St Remodel of 3-story single family dwelling, kitchen/bathrooms, all associated plumbing, electrical/mechanical work. no additional square footage/structural work Complete | Home remodel | Complete | Within 1 month | |
| Oct 4, 2022 | 60 Temescal Tr Interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room. Issued | Home remodel | Issued | 3 months | |
| Jun 4, 2021 | 405 Hoffman Av Interior rmeodel of misc spaces including kitchen & bathroom. no structural work, no additoinal sf and no changes to exterior. removal of non-load bearing partitions. Cancelled | Home remodel | Cancelled | — | |
| Apr 1, 2021 | 606 Arkansas St Remodel & addition to a 2-story single family residence. an addition of 126 sq ft conditioned space at rear of building including new bathroom. existing kitchen & bathroom are being remodeled including associated plumbing & electrical work. Issued | Addition | Issued | 7 months | |
| Feb 5, 2021 | 214 Duncan St #0 Remodel 3rd fl single family condo including addition of 47 sq ft of conditioned space (n) bath within (e) roof envelope & addition of (n) 3-story deck @ rear of bldg. (e) kitchen & bath are being remodeled including associated plumbing & electrical work Complete | Addition | Complete | 10 months | |
| Oct 23, 2020 | 405 Hoffman Av Powder bath remodel in kind, add showers Withdrawn | Home remodel | Withdrawn | — | |
| Aug 24, 2020 | 3960 A 18th St Unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael J Baushke? Request a correction.