Michael L Tauber
Architect · Michael Tauber Architecture · Fairfax
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-25947First issued Oct 18, 1995, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 75 permits since 2006, 75 in the last 5 years. Latest filed Apr 14, 2026.
- What kind of projects?
- Commercial or tenant improvement 31 · Home remodel 28 · Addition 6
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 31 permits in San Francisco
Time to get a permit
Median from filing to permit, from 29 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 3,682 permits.
Where
- Chinatown19
- Financial District/South Beach4
- Mission Bay2
- Inner Richmond2
Most recent
- 595 Pacific Av2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferredFeb 24, 2026Complete
- 595 Pacific Av3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred.Jan 28, 2026Complete
- 477 Bryant StChange of occupancy from b to r-3, renovate (e) bath and kitchen.Feb 28, 2024Filed
- 1990 Newcomb AvTenant improvement for sfpuc office and deck railing: install fire separation wall, non bearing partitions, new cabinetry, breakroom, remodel restrooms, new flooring, ceiling, new mechanical, new electrical and lighting, restripe parking for ada, new dock railingNov 9, 2020Complete
- 706 Mission StUnit 17a: replace (3) toilets, reconfigure master closet, lower ceiling in living room, dining room, family room, & master bedroom to add recessed lighting, create soffits for downlights in bedrooms, install window shades. mech & fire protection are deferred under separate permitSep 2, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 19, 2026 | 3 Presidio Tr Revision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcen Issued | Revision or supplement | Issued | 1 month | |
| Jul 23, 2026 | 1347 40th Av Revision to #202603167679. material change to wall assembly located in exterior breezeway. replace gympsum with lp fireblock osb to provide fire protection for exterior application. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 14, 2026 | 1347 40th Av Convert existing conditioned space on street level to adu. Issued | ADU | Issued | 1 month | |
| Feb 24, 2026 | 595 Pacific Av 2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferred Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 28, 2026 | 595 Pacific Av 3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 6, 2025 | 2121 Webster St #803 Gph3: replace exterior window and door system-west wall on one floor. provide new concrete curb for new window/door sill. patch and repair finishes around window replacement. Complete | Other | Complete | Within 1 month | |
| May 27, 2025 | 280 Spear St #39 Remove closet in the media room and add 2x soffits Issued | Home remodel | Issued | Within 1 month | |
| Feb 12, 2025 | 1750 Taylor St #305 Unit #305: remodel primary bathroom and closet, remodel bath 2 and powder room, new cabinetry in bedroom 2 and entry, reconfigure kitchen including new appliances and finishes. new lighting throughout, new tile and waterproofing at balconies. replace in kind window wall on west bedroom and north Issued | Home remodel | Issued | Within 1 month | |
| Sep 20, 2024 | 160 Ewing Tr Repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows. Filed | Home remodel | Filed | — | |
| Aug 28, 2024 | 1101 Green St #1101 Layout change for interior remodel of bathrooms, kitchen & closets. replace floorings, re-paint entire space, replace doors, replace kitchen appliances w/energy efficient modles, replace window shade. replace all lighting outlets & controls. revision to pa 202405142083 Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 17, 2024 | 1750 Taylor St #2302 Unit 2302: remodel 2 bathrooms & kitchen, replace plumbing fixture in kind. no structural or exterior work Complete | Home remodel | Complete | Within 1 month | |
| May 16, 2024 | 2121 Webster St #701 Remodel laundry room. remove (e) lower cabinetry and plumbing fixtures. install (n) cabinetry & plumbing fixtures Complete | Home remodel | Complete | Within 1 month | |
| Feb 28, 2024 | 477 Bryant St Change of occupancy from b to r-3, renovate (e) bath and kitchen. Filed | Commercial or tenant improvement | Filed | — | |
| Nov 21, 2023 | 2121 Webster St #707 Add new closet at entryway. dining room- remove (e) recessed downlight and replace with (n) chandelier. replace bathroom vanities in kind. Complete | Home remodel | Complete | Within 1 month | |
| Nov 21, 2023 | 2121 Webster St #701 Bedroom 3- remove (e) cabinetry. bulkhead diffuser and recessed downlights then patch ceiling. install furniture by others and relocate (e) downlights. siting room- remove cabinetry, non structural walls, (e) diffuser bulkhead, recessed downlights, patch ceiling. relocate diffuser and downlights... Complete | Home remodel | Complete | Within 1 month | |
| Aug 16, 2023 | 1080 Chestnut St #0 Replace non confirming railing w/new code compliant guards, replace drain at 1 balcany. add topping and waterproofing to (e) balcony surface to improve slope drainage at north and east balconies. add new pedestal pavers at all balcanies Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Dec 14, 2022 | 1254 06th Av 1/f: remodel kitchen in rear of building. no change in square footage Complete | Home remodel | Complete | Within 1 month | |
| Nov 22, 2022 | 595 Pacific Av Revision to pa# 201806212538. revise sheet a.2 in lobby eliminate the wall at lobby entrance to stair vestibule and leave exisitng door to vestibule as shown in the existing/demo plan. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 9, 2022 | 1080 Chestnut St #0 18 fl: demo (e) int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes. Complete | Home remodel | Complete | 1 month | |
| Jun 11, 2021 | 117 Frederick St #0 Remodel kitchen, new lighting, cabinets and appliances. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael L Tauber? Request a correction.