Michael S Warshaw
Architect · Mike Warshaw Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36719First issued Oct 30, 2017, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2018, 10 in the last 5 years. Latest filed Sep 17, 2026.
- What kind of projects?
- Home remodel 6 · Addition 2 · Commercial or tenant improvement 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 19,075 permits.
Where
- Bernal Heights2
- West of Twin Peaks1
- Glen Park1
- Oceanview/Merced/Ingleside1
Most recent
- 345 Moncada WyRemodel kitchen and bathroom. new deck at rear. minor relocation of partitions, finishes, fixtures per plans. new split system hvac. replace 3 windows.Jun 12, 2026Issued
- 41 Wilder St1/f: interior remodel. convert 263 sq.ft to conditioned space. (1) new bathroom. relocate fixtures, partitions per plans. 2/f: remodel 1 (e) bath. new deck with stair. relocate interior stair.Apr 25, 2025Complete
- 59 Justin DrConvert 617 sf of unconditioned space in conditioned included 1 bedroom, 1 bath, 1 laundry, 1 study/playroom. relocate/new plumbing fixture, repartition interior, new finishes & fixtures. replace windows w/ wood insert windows. no change to use, occupancy,egress or sfAug 2, 2024Complete
- 51 Justin DrInterior reno of sfh, new legal stair, new 1.5 bath new 749 sq ft of conditioned space in (e) envelope remodel ktichen. 6 new window pentrations.replace 5 front bay in kind with wood framed windows.Mar 11, 2022Complete
- 245 Chester AvInterior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures.Oct 29, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 17, 2026 | 674 Rockdale Dr Interior remodel, conversion of new conditioned space (868 sf), new interior stair and bathrooms, replace (e) bath, relocate kitchen. new finishes + fixtures. new rear deck. no change to use occupancy or bulk. subject to ab112 requirements. Filed | AdditionType unconfirmed | Filed | — | |
| Jun 12, 2026 | 345 Moncada Wy Remodel kitchen and bathroom. new deck at rear. minor relocation of partitions, finishes, fixtures per plans. new split system hvac. replace 3 windows. Issued | Home remodel | Issued | Within 1 month | |
| Apr 25, 2025 | 41 Wilder St 1/f: interior remodel. convert 263 sq.ft to conditioned space. (1) new bathroom. relocate fixtures, partitions per plans. 2/f: remodel 1 (e) bath. new deck with stair. relocate interior stair. Complete | Home remodel | Complete | Within 1 month | |
| Sep 13, 2024 | 59 Justin Dr Revision to pa 202408027834 revised structural details Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 2, 2024 | 59 Justin Dr Convert 617 sf of unconditioned space in conditioned included 1 bedroom, 1 bath, 1 laundry, 1 study/playroom. relocate/new plumbing fixture, repartition interior, new finishes & fixtures. replace windows w/ wood insert windows. no change to use, occupancy,egress or sf Complete | Home remodel | Complete | Within 1 month | |
| Nov 30, 2022 | 701 08th St Mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms. Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 19, 2022 | 245 Chester Av Revision to pa# 202110291440. structural replacement of rotten members per plans. replace and repair siding in kind as required at rear facade. Complete | Revision or supplement | Complete | Within 1 month | |
| May 19, 2022 | 51 Justin Dr Revision to pa# 202203119845. structural revision to add foundation support and replace post per drawings and calcs. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 11, 2022 | 245 Chester Av Rev to pa 202110291440 replace 4 aluminum framed windows in exact opening. Complete | Revision or supplement | Complete | 13 months | |
| Mar 11, 2022 | 51 Justin Dr Interior reno of sfh, new legal stair, new 1.5 bath new 749 sq ft of conditioned space in (e) envelope remodel ktichen. 6 new window pentrations.replace 5 front bay in kind with wood framed windows. Complete | Home remodel | Complete | Within 1 month | |
| Oct 29, 2021 | 245 Chester Av Interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures. Complete | Home remodel | Complete | 4 months | |
| Oct 22, 2020 | 27 Christopher Dr Interior renovation w/ (n) legal stair, (n) bathroom. replace (e) bathrooms, kitchen & finishes. partition reconfiguration. replace portion of hipped roof w/ continuation of (e) ridge beam & (n) gable end at rear. remove decorative railing & posts at front. replace railing & tile on (e) porch. Complete | Home remodel | Complete | 10 months | |
| Sep 26, 2020 | 1722 Quint St Revision to pa #2018-0731-6070: revision to proposed layout and amend drawings to reflect as-built conditions. Complete | Revision or supplement | Complete | 1 month | |
| Dec 12, 2019 | 310 Anza St Revision to pa #2018-0604-0931: add 1 bedroom and interior renovation. relocate kitchenette, infill 70 sq ft. at interior stair Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 4, 2019 | 1722 Quint St New rear deck at the second floor with stairs to first floor. the deck will be set back three feet from the southern side property line. in addition, the upper level openings will be replaced with one single opening and four sliding glass doors. Complete | Deck, stairs or patio cover | Complete | 8 months | |
| Jun 4, 2018 | 310 Anza St Horizontal addition. one story rear horizontal addition at 1st floor. roof deck for 2nd floor. Complete | Addition | Complete | 12 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael S Warshaw? Request a correction.