Narasimha D Prasanth Tanikella
Engineer · Zenith Engineers · San Ramon
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-81660First issued May 29, 2013, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 18 permits since 2017, 18 in the last 5 years. Latest filed Jun 21, 2024.
- What kind of projects?
- Seismic retrofit or foundation 8 · Deck, stairs or patio cover 4 · Home remodel 2
- How long do their permits take?
- Seismic retrofit or foundation: 13 months. City typical for the same review: 6 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 422 permits.
Where
- Haight Ashbury2
- Russian Hill2
- Western Addition2
- Noe Valley1
Most recent
- 905 Ashbury St #0Mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Jun 21, 2024Reinstated
- 1270 Church St #0Voluntary seismic upgrade soft story for strengthening per ab-094.in connection with adu permit # 201711022974 sNov 2, 2017Complete
- 1245 Broadway #0Soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Sep 15, 2017Complete
- 1243 BroadwaySoft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Sep 15, 2017Complete
- 1376 Mcallister St #0Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls at basement (north face, west face and middle of bldg.)Sep 11, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 15, 2024 | 1342 Revere Av Revision to pa #202011309880 & 202304115461. rebuilding the demolition portion of the existing main building in the rear of the building. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 21, 2024 | 905 Ashbury St #0 Mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. Reinstated | Seismic retrofit or foundation | Reinstated | Within 1 month | |
| Nov 17, 2023 | 360 Missouri St Replacement of (e) rear egress stair like-to-like Complete | Deck, stairs or patio cover | Complete | 3 months | |
| Nov 13, 2023 | 760 San Jose Av Existing stiar at the front of the building is damaged due to a vehicle collision. the existing brick stair will be full demolished and rebuilt using wood construction, in kind. revision to bpa#202310178836 Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 13, 2023 | 3615 Clement St (e) rear deck at 2nd floor has dry rot in columns and beams. the columns, beams will be replaced. joists will be revised. new foundation. new knee braces. Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Nov 2, 2017 | 1270 Church St Add (2) additional dwelling units on the ground floor per ordinance 162-16. sprinklers deferred. Complete | ADU | Complete | 12 months | |
| Nov 2, 2017 | 1270 Church St #0 Voluntary seismic upgrade soft story for strengthening per ab-094.in connection with adu permit # 201711022974 s Complete | Seismic retrofit or foundation | Complete | 15 months | |
| Sep 20, 2017 | 3317 Washington St Kitchen remodel, update finishes, add exterior door at rear. install (n) washer/dryer. (n) int. doors, (n) enlarged skylight, make rear level 3 guardrail code complaint (36" to 42"). maher na Complete | Home remodel | Complete | Within 1 month | |
| Sep 15, 2017 | 1860 Turk St #0 Soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. comply with nov #201990442 Issued | Legalize or fix a violation | Issued | 52 months | |
| Sep 15, 2017 | 1245 Broadway #0 Soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. Complete | Seismic retrofit or foundation | Complete | 24 months | |
| Sep 15, 2017 | 1243 Broadway Soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. Complete | Seismic retrofit or foundation | Complete | 14 months | |
| Sep 15, 2017 | 874 Fell St #0 Comply w/ nov #201990001: structural engineering design for soft story retrofit of the buildng. the target story retrofit is through the addition of plywood shear walls and simpson moment frame. basement improvement to allow 9' ceiling height. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Sep 11, 2017 | 1376 Mcallister St #0 Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls at basement (north face, west face and middle of bldg.) Complete | Seismic retrofit or foundation | Complete | 11 months | |
| Sep 11, 2017 | 1384 Mcallister St Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls at basement (north face, west face and middle of building). Complete | Seismic retrofit or foundation | Complete | 11 months | |
| Sep 11, 2017 | 237 Eureka St #0 Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls and simpson steel strong wall shear wall. Complete | Seismic retrofit or foundation | Complete | 21 months | |
| Sep 11, 2017 | 1868 Page St #0 Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of moment frame. not visable from street. Complete | Seismic retrofit or foundation | Complete | 13 months | |
| Jul 31, 2017 | 2350 Market St Temporary slope excavation in-lieu of required temporary shoring for the excavation to install new retaining walls. less than 50 cy of soil to be removed. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Jul 27, 2017 | 283 Oak Park Dr Revision to pa #2016-0912-7460 - infill the area under the 2nd floor dining room at the rear. move 1st floor rear exterior wall to align with 2nd floor rear exterior wall. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 25, 2017 | 942 Divisadero St #401 #401: removing existing two bearing walls in interior space between kitchen & living rm. Issued | Home remodel | Issued | Within 1 month | |
| Jun 1, 2017 | 1750 Sutter St #0 At (e) 3-story bldg w/ (e) footprint: repair the damaged (e) deck in unit #305 - remove all (e) deck & guardrails. replace any decayed sheating & framing members. install all (n) rim joists & blocking. no change-same location & same size. Complete | Deck, stairs or patio cover | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Narasimha D Prasanth Tanikella? Request a correction.