Parvathy Nair
Architect · Pn A+D · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38498First issued Feb 10, 2020, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2025, 10 in the last 5 years. Latest filed Sep 25, 2026.
- What kind of projects?
- Commercial or tenant improvement 7 · Home remodel 1 · Addition 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- Russian Hill2
- Mission1
- Lone Mountain/USF1
- South of Market1
Most recent
- 3239 22nd StTenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades.Sep 25, 2026Filed
- 2901 Geary Bl #01/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.Sep 18, 2026Issued
- 850 Brannan StInterior tenant improvement consisting of new interior partitions.Aug 24, 2026Complete
- 2065 Polk StTenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.Mar 5, 2026Issued
- 2065 Polk StDemolish existing walk-in cooler.Dec 17, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 25, 2026 | 3239 22nd St Tenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 18, 2026 | 2901 Geary Bl #0 1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Aug 24, 2026 | 850 Brannan St Interior tenant improvement consisting of new interior partitions. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 9, 2026 | 652 Duncan St A restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight above Complete | Home remodel | Complete | Within 1 month | |
| Mar 5, 2026 | 2065 Polk St Tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Dec 31, 2025 | 3973 Clay St Interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build. Issued | Addition | Issued | 10 months | |
| Dec 17, 2025 | 2065 Polk St Demolish existing walk-in cooler. Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Nov 3, 2025 | 1326 09th Av Tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Oct 10, 2025 | 701 03rd St Ti of a roof level bar/lounge- addition to (e) sunshade. (n) lighting. no change to egress componets. mep are design build. fire sprinkler is design. build under a seperate permit Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 28, 2025 | 55 Ashbury Tr (n) electric chair lift to be installed at entry stair to provide accessible path to entrance door. no interior work. Filed | Other | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Parvathy Nair? Request a correction.