Paul Alahin Molina
Architect · Molina & Timmins Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-30600First issued May 3, 2006, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 52 permits since 2005, 52 in the last 5 years. Latest filed Oct 22, 2026.
- What kind of projects?
- Home remodel 19 · Addition 10 · Commercial or tenant improvement 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 19 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 14,948 permits.
Where
- Mission3
- Russian Hill3
- Western Addition2
- Castro/Upper Market2
Most recent
- 254 08th AvCreate new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab.Sep 29, 2026Issued
- 1736 Gough StBathroom remodel on third floor.Apr 20, 2026Complete
- 155 Lower TrAdd new bathroom at bsmt level, remove (2) (e) garage doors and add one new garage door. add pocket doors at (e) living rm, new furnace to replace (e). replace 4 exit doors + 1 window in kind. (e) living room to become bedroom 3.Apr 8, 2026Issued
- 2911 16th StCosmetic upgrades to all residential units. creation of 5 accessibility units and 2 communication units. new heat pump water heaters, new electric sub-panels in all units.Mar 26, 2026Filed
- 1101 Green St #17Unit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical.Mar 3, 2026Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 22, 2026 | 4370 Cesar Chavez St Reconstruction e deck at rear yard and new wood stairs. new glass doors at enlarged opening at basement. reconstruction of e deck on 1st fl and glass railing. rebuild e interior stair between basement and 1st fl. Filed | Deck, stairs or patio cover | Filed | — | |
| Oct 14, 2026 | 1040 Sanchez St (work w/out permit by previous owner): kitchen upgrades included new plumbing fixtures, counter and appliances. lower level includes new 573 s.ft of conditioned space. new steel beam and partially lowering the (e) slab. new furnace. Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Sep 29, 2026 | 254 08th Av Create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab. Issued | Home remodel | Issued | Within 1 month | |
| Sep 18, 2026 | 4370 Cesar Chavez St Revisiom to permit 202607144991. reduce proposed rear yard fence height from 10' to 8'. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 4, 2026 | 155 Lower Tr Revision to pa#202604089079. widening of the hallway on the 1st fl. revision to footing in basement/crawl space. bathroom + closet modifications in guest bedroom level. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 2, 2026 | 1127 Hampshire St Excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard. Filed | Addition | Filed | — | |
| Sep 1, 2026 | 607 06th Av Addressing complaint#202657441. remodel of (e) powder room. replace in kind (e) wood deck + stairs to back yard. (n) 7' tall fence on 3 sides of rear yard. (n) glass railing @ front deck + stair. Issued | Legalize or fix a violation | Issued | 1 month | |
| Aug 9, 2026 | 2061 Mission St Priority:13-01: legalize unit 35 through the state adu round table process. reconfiguration of units 19,33 & 34 Filed | ADU | Filed | — | |
| Jul 24, 2026 | 2911 16th St Ed 13-01. 100% affortable housing via mohcd. convert 3 (e) guest rooms into 3 adus. Filed | ADU | Filed | — | |
| Jul 22, 2026 | 163 A Alhambra St #0 Revision of permit#202502079869. addition of one new bathroom and offic, plans for the remodel the existing kitchen and bathroom which was part of the permit mentioned above. Issued | Revision or supplement | Issued | 3 months | |
| Jul 14, 2026 | 4370 Cesar Chavez St Reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sections Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Jun 11, 2026 | 607 06th Av Replace exisitng painted wood siding @ front facade w/new smooth trowelled stucco. Issued | Other | Issued | Within 1 month | |
| May 6, 2026 | 104 Presidio Av #0 Restoration of (e) interior spaces to 7 apartments to match (e) addresses registered to parcel & last approved plans #201406168513. this permit addresses complaint #202650611. Triage | Legalize or fix a violation | Triage | — | |
| May 1, 2026 | 2901 16th St Voluntary structural strenghtening on the commercial ground floor w/ 2 moment frames. replace (e) sidewalk floor w/ 2 moment frames. replace (e) sidewalk over (e) basement w/ new concrete slab. disable access upgrades compliance per d.a checklist. Filed | Seismic retrofit or foundation | Filed | — | |
| Apr 20, 2026 | 1736 Gough St Bathroom remodel on third floor. Complete | Home remodel | Complete | Within 1 month | |
| Apr 8, 2026 | 155 Lower Tr Add new bathroom at bsmt level, remove (2) (e) garage doors and add one new garage door. add pocket doors at (e) living rm, new furnace to replace (e). replace 4 exit doors + 1 window in kind. (e) living room to become bedroom 3. Issued | Home remodel | Issued | 2 months | |
| Apr 3, 2026 | 2059 Mission St #0 Struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 26, 2026 | 2911 16th St Cosmetic upgrades to all residential units. creation of 5 accessibility units and 2 communication units. new heat pump water heaters, new electric sub-panels in all units. Filed | Home remodel | Filed | — | |
| Mar 3, 2026 | 1101 Green St #17 Unit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical. Complete | Home remodel | Complete | Within 1 month | |
| Dec 12, 2025 | 2061 Mission St Change guest rooms 34 & 35 to studios. modify units 19+33. all units replace (e) kitchen cabinets, bathroom remodel in kind. heating upgrades + new water heaters + 3 new laundry rooms. Withdrawn | Home remodel | Withdrawn | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Paul Alahin Molina? Request a correction.