Peiman Ghaffari
Engineer · S & P Structural Engineers · Walnut Creek
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-97150First issued Nov 8, 2024, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2022, 12 in the last 5 years. Latest filed Jul 31, 2026.
- What kind of projects?
- New building 4 · Home remodel 2 · Commercial or tenant improvement 2
- How long do their permits take?
- New building: 33 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
New building: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 872 permits.
Where
- Mission4
Most recent
- 819 V Alabama StErect 4-story 2 unit + 2 adu type 3a residential building. scope has changed to build an r2.Mar 26, 2026Filed
- 825 V Alabama StErect 4-story 3 unit, type iii-a residential building.Dec 26, 2025Filing
- 1356 York StTo erect 4 stories, no basement, type v-a, 3 units residential building.Jun 24, 2022Issued
- 1354 York StTo erect 4 stories, no basement, type v-a, 3 units residential building.Jun 24, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 2, 2026 | 228 04th Av Revision to previously approved #202510298356 multi-family residential remodel and adu project. work include interior modification of kitchen & bathrooms, install of structural shear walls, seismice existing strengthening . all work performed within the existing building footprint. Filed | Revision or supplement | Filed | — | |
| Oct 19, 2026 | 3131 Scott St Revision to pa 202607315891 adding 1 skylights @ hallway and install new lvel ceiling joist above rear bedroom Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 20, 2026 | 178 Montana St Front bldg: revision to approved pa# 202502240955. remove 1'8" of (e) bldg as shown on plan, to provide 5' clear path of traval. modify bldg to comply with dbi's condition of approval under dpw's two lot subdivision project id#12423. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 31, 2026 | 3133 Scott St Unit 3133, level 3: replace all windows in kind. new skylights and roof framing for additional support. interior non load bearing walls. remodel existing kitchen, remove e windows, install 1 new window side north elevation. new laundry area with stacked. remodel e split bath to full. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Jul 21, 2026 | 343 Paul Av Revision to the foundation as required by the inspector. bpa: 202501309393 Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 17, 2026 | 1328 Lyon St Replace existing retaining wall.(about 43') Issued | Retaining wall or site work | Issued | 1 month | |
| Jul 1, 2026 | 46 Cresta Vista Dr Revision to pa# 202311080463: remove pantry at main level. ref pa# 202410314117 Issued | Revision or supplement | Issued | 1 month | |
| May 21, 2026 | 211 Hugo St New foundation to be constructed below (e) stair. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| May 11, 2026 | 575 Mississippi St Renovation of an (e) 2-story bldging (basement excluded from this scope). including selective removal of interior walls, windows, and doors. the project also includes addition on level 1 and level 2, as well as a new level-2 deck with stair access from the backyard. Filed | Addition | Filed | — | |
| Apr 22, 2026 | 560 Battery St Combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet... Issued | Commercial or tenant improvement | Issued | 2 months | |
| Mar 26, 2026 | 819 V Alabama St Erect 4-story 2 unit + 2 adu type 3a residential building. scope has changed to build an r2. Filed | New building | Filed | — | |
| Mar 10, 2026 | 720 Bacon St Deck repair at 2nd floor less than 50% Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Jan 29, 2026 | 1356 York St Revision to bpa 202206247036 addendum s-1 to remove 1 bedrrom and enlarge living and dining rooms for each unit; increase depth of building entrance, enlarge width of office for each unit; revision to bedroom interior layout for each unit, revision to interior stair #2. no change to fixture Issued | Revision or supplement | Issued | 3 months | |
| Jan 29, 2026 | 1354 York St Revision to pa 202206247018 addendum s-1 to remove 1 bedroom and enlarge living and dining rooms for each unit; increase depth of building entrance, enlare the width of office for each unit, revision of bedroom interior layout for each unit, revision of stair #2. rear stair and roof partition Issued | Revision or supplement | Issued | 3 months | |
| Jan 12, 2026 | 3900 Geary Bl Remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residential Filed | Commercial or tenant improvement | Filed | — | |
| Dec 26, 2025 | 825 V Alabama St Erect 4-story 3 unit, type iii-a residential building. Filing | New building | Filing | — | |
| Dec 5, 2025 | 80 Lomita Av Revision to #202407085951 & 202412126740: replace roof @ dining room & kitchen to align w/ (e) ceiling adjacent to living room & family room ceiling (no additional bldg height per sfpc 260); new parapet; add closet @ stair landing; add mech. room & laundry in garage; relocate fau, water heater Issued | Revision or supplement | Issued | 4 months | |
| Aug 26, 2025 | 46 Cresta Vista Dr Revision to approved bpa#: 202410314117: change to basement retaining wall height and foundation plan. adding a beam in the basement level. Issued | Revision or supplement | Issued | 1 month | |
| Jul 30, 2025 | 1358 Fell St Revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 Complete | Revision or supplement | Complete | 2 months | |
| Jul 25, 2025 | 20 Church St Proposed revision to approved pa# 201612306298 to front building. eliminate approved 4th floor unit. eliminate the basement unit. merge approved basement with 1st floor unit (20 church st). reconstruct rear stairs. Cancelled | Revision or supplement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peiman Ghaffari? Request a correction.