Peter Enjing Yu
Engineer · Structus, Inc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4447First issued Feb 25, 2000, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 27 permits since 2005, 27 in the last 5 years. Latest filed Sep 25, 2025.
- What kind of projects?
- Seismic retrofit or foundation 7 · Other 5 · Home remodel 4
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966.
Where
- Inner Richmond2
- Mission1
- Tenderloin1
- North Beach1
Most recent
- 681 Florida StTower crane foundation for pa #201802211851.Jun 14, 2019Complete
- 3500 Fulton StSoft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13Mar 11, 2019Complete
- 230 Eddy St #0Voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.Oct 27, 2017Cancelled
- 3500 Fulton StVoluntary strenghtening of (e) structure. added moment frames and plywood sheer walls throughout building.May 11, 2017Complete
- 438 BroadwayComply with soft story retrofit per sfbc chapter 34b. fema p-807.Oct 26, 2015Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 25, 2025 | 125 Mason St Convert basement parking to loading zones only; electrification of bldg heating & water heating systems; upgrading lights to led; convert 3-units to mobility; 2-units to hvi; playground replacement 1/f; selective glazing; accessibility upgrade to comm romm @ 9/f lounge; roofing replacment; bldg sign Issued | OtherType unconfirmed | Issued | 12 months | |
| Jun 12, 2025 | 301 Van Ness Av Metal roofing reroofing of the historic war memorial opera house building and alternate scope of installing fall protection system with roof access ladders. no hotworks without sffd operating permit. Issued | Other | Issued | 4 months | |
| May 2, 2025 | 38 Hotaling Pl #0 Revision to pa# 202409261671, replace floor joisting on floor 1, replace subfloor in that area, additional plywood sheethed wall in basement. Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 10, 2025 | 1102 ½ Fulton St Interior remodel of a dwelling unit in a 4 unit condo. kitchen and bath remodel. no change to sq ft. no exterior work. Issued | Home remodel | Issued | Within 1 month | |
| Nov 4, 2024 | 38 Hotaling Pl #0 1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st fl Issued | Commercial or tenant improvement | Issued | 4 months | |
| Aug 29, 2022 | 683 Florida St G/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only. Complete | Commercial or tenant improvementType unconfirmed | Complete | 11 months | |
| Aug 23, 2021 | 1 Dr Carlton B Goodlett Pl City hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop. Issued | Other | Issued | 16 months | |
| Oct 17, 2019 | 701 Post St 2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby. Issued | Revision or supplement | Issued | 2 months | |
| Jun 14, 2019 | 681 Florida St Tower crane foundation for pa #201802211851. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Mar 11, 2019 | 3500 Fulton St Soft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Sep 6, 2018 | 500 Folsom St Shoring & hold down anchors to combat hydrostatic pressure from ground water: relocation of one hydrostatic tiedown anchor one foot away from the original location. (ref pa #2015-0311-0506 s1) Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 23, 2018 | 701 Post St #0 Revised structural drawing for permit app. #201805179391 & 201612195301. revision required to meet existing building conditions. no change in scope of work. Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 27, 2017 | 500 Folsom St Phase 2 of the tower crane submital - tower crane permit for tie-ins. ref pa# 2015/03/11/0506-s. ** maher: n/a ** Complete | Revision or supplement | Complete | 6 months | |
| Oct 27, 2017 | 230 Eddy St #0 Voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance. Cancelled | Seismic retrofit or foundation | Cancelled | 4 months | |
| May 11, 2017 | 3500 Fulton St Voluntary strenghtening of (e) structure. added moment frames and plywood sheer walls throughout building. Complete | Seismic retrofit or foundation | Complete | 16 months | |
| May 10, 2017 | 1500 Mission St Structural only. ** maher: n/a ** Complete | Home remodelType unconfirmed | Complete | 5 months | |
| Mar 22, 2017 | 1 Harding Rd Site & utility for future (n) modular building. construct (n) concrete foundation, provide water & electrical service to (n) building. (n) sump pump & connect to (e) sump pump on site. vacant lot within lake merced pistol range, adjacent to lake merced. ** maher: yes! route to dph ** Issued | Retaining wall or site workType unconfirmed | Issued | 8 months | |
| Mar 20, 2017 | 500 Folsom St Tower crane for new construction at 500 folsom street. (ref pa#201503110506). this permit is for phase 1 tower crane erection up to level 16 (mast height 217 ft) ** maher; n/a ** Complete | Revision or supplementType unconfirmed | Complete | 4 months | |
| Jun 29, 2016 | 12 Amber Dr Eck repair, structural strengthening, (e) decks at unit 12, less than 50% in-kind. revision to bpa#201603253138 Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 25, 2016 | 160 Russ St Revision to ref pa 2012 0820 7754: additional structural support for hanging art fiat piece maher na Issued | Revision or supplement | Issued | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter Enjing Yu? Request a correction.