Peter J Birkholz
Architect · Page & Turnbull · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23418First issued Jun 23, 1992, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 16 permits since 2016, 16 in the last 5 years. Latest filed Mar 2, 2026.
- What kind of projects?
- Commercial or tenant improvement 8 · Seismic retrofit or foundation 3 · Home remodel 2
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- Financial District/South Beach5
- Pacific Heights1
- Chinatown1
- South of Market1
Most recent
- 2390 Bush StVoluntary barrier removal to 1 bathroom on basement lvl, relocate lav, mep upgradeMar 2, 2026Issued
- 750 Kearny St2/f & 3/f - modification of four fire/life safety egress doors.Mar 24, 2025Complete
- 1 Grant AvNew back bar & cafe at level 1 and beverage bar with island back bar and shelving at mezzanine. mep under separate permit to pa2019 0319 5615 (e) hvac & lighting system to remain.Mar 22, 2019Issued
- 170 Maiden LnSelective interior t.i. limited to construction of 2 new offices and modification of a conference room to make 2 smaller conference rooms and casework addition at extg break area. work on 5th floor. total work area 573 sq ftFeb 6, 2019Complete
- 180 Geary StInstallation of rectilinear led light fixture at the interior of each window opening on the 4th floor facing stockton & geary streets, light fixture to be installed internally behind existing glazingMar 23, 2018Cancelled
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 2, 2026 | 2390 Bush St Voluntary barrier removal to 1 bathroom on basement lvl, relocate lav, mep upgrade Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 24, 2025 | 750 Kearny St 2/f & 3/f - modification of four fire/life safety egress doors. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Nov 13, 2023 | 2389 Bush St Voluntary structural strengthening and associated ada upgrades. infill portion of crawl space below entry. per asce 41-17 Issued | Seismic retrofit or foundation | Issued | 2 months | |
| Jun 26, 2023 | 760 02nd St As built drawings for carbo dioxide lines Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| May 25, 2023 | 2390 Bush St Voluntary structural. repair work at church bell tower structural work includes replacment of carroded steel bracing which was added during the 1990 seismic rehabiltation of the church. accessiblility upgrades: signage at parking lot, restroom, restroom work. maher n/a. Complete | Home remodel | Complete | 3 months | |
| Dec 20, 2022 | 760 Market St Project includes the rehabilitation & voluntary structural upgrade of the historic penthouse residence on the roof of 760 market. work includes interior and exterior rehabilitions of walls, windows, doors, roof ornament skylights, kitchen, bath and all associated mep. per coa motion n o 0459 Filed | Home remodel | Filed | — | |
| Oct 2, 2020 | 1170 Sacramento St #2 Rev to pa201907246871; to incorporate misc. changes to details & scope additions under delta 4. maher n/a. Complete | Revision or supplement | Complete | 1 month | |
| Feb 25, 2020 | 760 02nd St Installation of an exterior canopy for outdoor seating for restaurant. self-supporting & partially attached to building. located along king st side of bldg, taking up most of raised plaza area on southeast side of main entry. remove (e) awnings. (e) wall at removed awning will be patched & painted. Complete | Deck, stairs or patio cover | Complete | 23 months | |
| Jul 24, 2019 | 1170 Sacramento St #2 Voluntary seismic upgrade to (e) 19-story residential building. ** maher; n/a ** Complete | Seismic retrofit or foundation | Complete | 13 months | |
| Mar 22, 2019 | 1 Grant Av New back bar & cafe at level 1 and beverage bar with island back bar and shelving at mezzanine. mep under separate permit to pa2019 0319 5615 (e) hvac & lighting system to remain. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Feb 6, 2019 | 170 Maiden Ln Selective interior t.i. limited to construction of 2 new offices and modification of a conference room to make 2 smaller conference rooms and casework addition at extg break area. work on 5th floor. total work area 573 sq ft Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 11, 2018 | 1360 Jones St Replacement of deteriorated wood window with wood window with similar style and rail dimensions.selective demolition of interior finishes to accommodate replacement windows.localized interior and exterior painting around windows.windows shall not encroached into public way at its fully open position Complete | Other | Complete | 3 months | |
| Nov 16, 2018 | 200 Stockton St Install temporary xmas signage decoration on building facade, decoration has 3 parts; 1 pendent and 2 branches. branch on stockton street shall not exceed 200 sf per planning code. remove by jan 25, 2019. n/a maher Issued | Other | Issued | Within 1 month | |
| Jul 12, 2018 | 1170 Sacramento St #2 Voluntary seismic upgrade. structural strengthening of exterior lobby & garage lvl exterior columns w/ frp structural wrap. structural strengthening of (e) elevator core interior & exterior shaft. strengthening of exterior stairwell balcony concrete curbs. strengthening of 1st lvl garage ceiling Withdrawn | Seismic retrofit or foundation | Withdrawn | — | |
| Mar 23, 2018 | 180 Geary St Installation of rectilinear led light fixture at the interior of each window opening on the 4th floor facing stockton & geary streets, light fixture to be installed internally behind existing glazing Cancelled | Commercial or tenant improvementType unconfirmed | Cancelled | — | |
| Jul 11, 2017 | 1 Grant Av Revision to pa 2017-0621-9963 removal of 5'-0" wode section of structural concrete wall at basement level as indicated by keynote 8 on drawing 1/d2.00 Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 10, 2017 | 1 Grant Av Non structural interior alterations to the e structure. new interior walls, ceiling repairs, doors, finishes. mep lighting, fire sprinkler, life safety devices to be design build under separate permit. demo under bpa#201706219963 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 19, 2017 | 1076 Howard St Conversion of factory bldg with partial mezzanine to a 2 story office bldg within the extg bldg envelope. work to include selective demo, change of use, seismic upgrade and foundation improvements. core and shell improvements including mechanical, electrical, & plmg upgrades. n/a for maher Complete | Commercial or tenant improvement | Complete | 14 months | |
| Oct 19, 2016 | 180 Sansome St 3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13 Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter J Birkholz? Request a correction.