Robert George Pekelnicky
Engineer · Degenkolb Engineer · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5083First issued Jan 26, 2007, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2015, 10 in the last 5 years. Latest filed Sep 11, 2026.
- What kind of projects?
- Seismic retrofit or foundation 6 · Commercial or tenant improvement 3 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966; 1 still in review.
Where
- Financial District/South Beach4
- Tenderloin2
Most recent
- 101 Spear StSite permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allowSep 11, 2026Filed
- 188 The EmbarcaderoVoluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)columnMay 21, 2021Complete
- 350 California St #0Voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floorMay 13, 2021Complete
- 350 California St #0Voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floorNov 21, 2019Complete
- 222 Mason StThis scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egressJul 6, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 11, 2026 | 101 Spear St Site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow Filed | Seismic retrofit or foundation | Filed | — | |
| Feb 2, 2022 | 600 Montgomery St #0 New leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes. Complete | Commercial or tenant improvement | Complete | 2 months | |
| May 21, 2021 | 188 The Embarcadero Voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column Complete | Seismic retrofit or foundation | Complete | 6 months | |
| May 13, 2021 | 350 California St #0 Voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Nov 21, 2019 | 350 California St #0 Voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Jul 10, 2019 | 600 Montgomery St #0 Alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this project Complete | Home remodel | Complete | Within 1 month | |
| Jun 11, 2019 | 350 California St #0 T.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jul 6, 2016 | 222 Mason St This scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress Complete | Seismic retrofit or foundation | Complete | 3 months | |
| Feb 18, 2016 | 222 Sansome St #0 Interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13 Issued | Commercial or tenant improvement | Issued | 10 months | |
| Jun 22, 2015 | 222 Mason St Modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements. Complete | Seismic retrofit or foundation | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Robert George Pekelnicky? Request a correction.