CheckMyDesigner

Robert George Pekelnicky

Engineer · Degenkolb Engineer · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-5083First issued Jan 26, 2007, expires Jun 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
10 permits since 2015, 10 in the last 5 years. Latest filed Sep 11, 2026.
What kind of projects?
Seismic retrofit or foundation 6 · Commercial or tenant improvement 3 · Home remodel 1
How long do their permits take?
Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
10 permits that name Robert George Pekelnicky, newest first. Select a permit to see the full record.
FiledProjectOpen
Sep 11, 2026101 Spear St

Site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow

Filed
Feb 2, 2022600 Montgomery St #0

New leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes.

Complete
May 21, 2021188 The Embarcadero

Voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column

Complete
May 13, 2021350 California St #0

Voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor

Complete
Nov 21, 2019350 California St #0

Voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor

Complete
Jul 10, 2019600 Montgomery St #0

Alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this project

Complete
Jun 11, 2019350 California St #0

T.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher

Complete
Jul 6, 2016222 Mason St

This scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress

Complete
Feb 18, 2016222 Sansome St #0

Interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13

Issued
Jun 22, 2015222 Mason St

Modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Robert George Pekelnicky? Request a correction.