Ronald Owen Hamburger
Engineer · Simpson Gumpertz & Heger · Terrebonne
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-2951First issued Feb 27, 1987, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 22 permits since 2004, 22 in the last 5 years. Latest filed Jun 28, 2022.
- What kind of projects?
- Deck, stairs or patio cover 6 · Seismic retrofit or foundation 4 · Other 4
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Deck, stairs or patio cover: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966.
Where
- Twin Peaks4
- Mission Bay2
Most recent
- 499 Illinois StInstall new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsJun 24, 2021Complete
- 409 Illinois StInstall new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsJun 24, 2021Complete
- 1 La AvanzadaReconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above.Sep 22, 2017Issued
- 1 La AvanzadaInstallation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennasFeb 16, 2016Complete
- 1 La AvanzadaReplace approx 1300 sq ft of 8ft chain link fenceApr 25, 2012Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 26, 2023 | 301 Mission St Revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads. Complete | Revision or supplement | Complete | 5 months | |
| Jun 28, 2022 | 50 California St 23/f-24/f: strengthening of existing steel framing for installation of a new high density shelving unit. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jul 19, 2021 | 301 Mission St Revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street. Complete | Revision or supplement | Complete | 13 months | |
| Jul 19, 2021 | 301 Mission St Revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24". Complete | Revision or supplement | Complete | 13 months | |
| Jun 24, 2021 | 499 Illinois St Install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads Complete | Deck, stairs or patio coverType unconfirmed | Complete | 1 month | |
| Jun 24, 2021 | 409 Illinois St Install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads Complete | Deck, stairs or patio coverType unconfirmed | Complete | 1 month | |
| Dec 17, 2020 | 50 California St Existing office tenant improvements for 11th fl. interior demo under pa# 202010196863. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 17, 2020 | 50 California St A new communication stair and portal between 11th & 12th fl. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Oct 2, 2020 | 1045 Sansome St Add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms. Complete | Commercial or tenant improvementType unconfirmed | Complete | 18 months | |
| Jul 2, 2019 | 1 La Avanzada Temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion. Issued | Home remodelType unconfirmed | Issued | 2 months | |
| May 30, 2019 | 1 La Avanzada Voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3 Issued | Seismic retrofit or foundation | Issued | 3 months | |
| Jan 8, 2019 | 1 La Avanzada To comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white. Complete | Legalize or fix a violation | Complete | 66 months | |
| Dec 7, 2018 | 301 Mission St Indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402 Complete | Revision or supplementType unconfirmed | Complete | 22 months | |
| Dec 7, 2018 | 301 Mission St **paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402 Complete | Revision or supplementType unconfirmed | Complete | 25 months | |
| Dec 4, 2018 | 301 Mission St Parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. Complete | Seismic retrofit or foundation | Complete | 27 months | |
| Sep 13, 2018 | 301 Mission St Sub surface exploration consisting of 2 borings to approx. 250 feet below the top of the basement mat foundation, to obtain data for future foundation retrofit design, no exterior work. Complete | Retaining wall or site workType unconfirmed | Complete | 7 months | |
| Sep 22, 2017 | 1 La Avanzada Reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above. Issued | Deck, stairs or patio coverType unconfirmed | Issued | 24 months | |
| Feb 16, 2016 | 1 La Avanzada Installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennas Complete | Deck, stairs or patio cover | Complete | 17 months | |
| Aug 14, 2015 | 100 Alpine Tr #0 Vertical addition. add 2-story to existing garage create new single family dwelling. Complete | AdditionType unconfirmed | Complete | 23 months | |
| Jul 21, 2015 | 1 La Avanzada Install 1 low power fm antenna on sutro tower. Complete | OtherType unconfirmed | Complete | 11 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ronald Owen Hamburger? Request a correction.