Sandy Sxi-Ai Blair
Architect · Marx/Okubo · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29691First issued Mar 12, 2004, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2014, 8 in the last 5 years. Latest filed Dec 18, 2025.
- What kind of projects?
- Commercial or tenant improvement 3 · Seismic retrofit or foundation 2 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 574 permits.
Where
- Western Addition2
- Financial District/South Beach1
Most recent
- 1515 Fillmore StTo comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg).Oct 26, 2023Complete
- 1740 Ofarrell StTo comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg).Oct 26, 2023Complete
- 444 Spear StSuite 205 - adding four private offices to an (e) commercial office space. improvements include new non-bearing, non-rated partitions, interior doors & sidelites, minor hvac modifications, new or relocated electrical & data receptacles and minor lighting adjustments. n/a maher ordinanceOct 11, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 18, 2025 | 1200 04th St Mb360 block 5: replace part of cast-in-place concrete sidewalks w/ pavers and introduce additional landscape strips between the sidewalks to improve efficiency of the maintenance of the areas. locally adjust structural slabs at building entrances. accessibility work will be brought to compliance. Filed | Retaining wall or site work | Filed | — | |
| Oct 26, 2023 | 1515 Fillmore St To comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg). Complete | Commercial or tenant improvement | Complete | 4 months | |
| Oct 26, 2023 | 1740 Ofarrell St To comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg). Complete | Commercial or tenant improvement | Complete | 4 months | |
| Oct 26, 2023 | 1730 Ofarrell St Voluntary partial structural strengthening - reinforced concrete column jackets/wall overlays at street shearwalls. removal & replacement of architectural finishes to allow for structural work to be completed, ada upgrades of residential lobby. Complete | Seismic retrofit or foundation | Complete | 4 months | |
| Jun 22, 2023 | 1730 Ofarrell St Voluntary partial seismic retrofit.reinforced concrete column jackets/wall overlays @ select shear walls.removal & replacement of archtictural finishes to allow for structrual work to be completed.accessibility work @ two bldg entrances to bring slopes @ landings into compliance. Withdrawn | Seismic retrofit or foundation | Withdrawn | — | |
| Oct 11, 2016 | 444 Spear St Suite 205 - adding four private offices to an (e) commercial office space. improvements include new non-bearing, non-rated partitions, interior doors & sidelites, minor hvac modifications, new or relocated electrical & data receptacles and minor lighting adjustments. n/a maher ordinance Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 13, 2014 | 1 Grant Av Remove broken roof access window; replace with metal door. remove north skylight glazing; replace with metal roof. r tom 5-13-14 Complete | Other | Complete | 10 months | |
| May 2, 2014 | 1 Grant Av #0 Re-coat roof, repair skylights, repair elevator penthouse roof, repoint roof-level granite, repoint entry granite, seal concrete sidewalk cracks. Complete | Other | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Sandy Sxi-Ai Blair? Request a correction.