Scott Cibotti
Engineer · Cibotti Engineering · San Ramon
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-62912First issued Jan 25, 2002, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 9 permits since 2014, 9 in the last 5 years. Latest filed Feb 11, 2026.
- What kind of projects?
- Home remodel 3 · Addition 2 · Seismic retrofit or foundation 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 9,196 permits.
Where
- West of Twin Peaks1
- Visitacion Valley1
- Oceanview/Merced/Ingleside1
Most recent
- 416 Molimo DrTo develop (e) basement to create 2 new bedrooms & 1 bathroom, wet bar. new 609 sq. ft. (including staircase). relocate tank water heater & furnace in the crawlspace behind the new bathroom.Feb 11, 2026Filed
- 156 Tucker AvReplace affected framing and stucco siding per attached structural drawing. work in kindFeb 6, 2026Issued
- 424 Grafton AvKitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area.Mar 15, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 11, 2026 | 416 Molimo Dr To develop (e) basement to create 2 new bedrooms & 1 bathroom, wet bar. new 609 sq. ft. (including staircase). relocate tank water heater & furnace in the crawlspace behind the new bathroom. Filed | Home remodel | Filed | — | |
| Feb 6, 2026 | 156 Tucker Av Replace affected framing and stucco siding per attached structural drawing. work in kind Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Jan 21, 2026 | 24 White St Revision to pa #2025-1031-8701: repair basement floor side wall foundation at remodeled area. replace all single pane windows & doors to energy compliant windows. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 31, 2025 | 24 White St #0 47 sf new addition of the main floor by converting the part of couryard to a dinning space. convert part of living room into one additional bedroom in front of building. repair (e) rear yard wood deck & stair - no expanstion or (n) stair. alteration of 2 bath rooms(including 1(n) bathroom @ 1st flr. Issued | Addition | Issued | Within 1 month | |
| Nov 20, 2023 | 516 A Oak St Addition of 365 sq. ft. for new steam shower next to (e) bathroom Complete | Addition | Complete | 4 months | |
| Sep 6, 2023 | 4528 17th St #2 Revision to 202301170261. remove bearing & non-bearing walls in the kitchen and provide a new kitchen cabinet layout including island, change (e) arched insulated glass/aluminum windows to new aluminum frames & install 4 new aluminum windows in office, remove non-load bearing wall in upstair bath & Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 15, 2022 | 424 Grafton Av Revision to pa# 202203150052. engineering footing for kitchen remodel. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 15, 2022 | 424 Grafton Av Kitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area. Complete | Home remodel | Complete | Within 1 month | |
| Jan 4, 2018 | 313 Castro St Revision to app#201708225549, refer (3) - demolish the bathroom on the 2nd floor and re-framing the extg deck and deck stair on the 2nd floor. Issued | Revision or supplement | Issued | 1 month | |
| Jan 4, 2018 | 313 Castro St Add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck) Issued | Revision or supplement | Issued | 40 months | |
| Oct 16, 2017 | 313 Castro St Revision to app#201708225549 and 201705015342 and 201701267992. demolition the bathroom on the 2nd floors and framing the extg deck Cancelled | Revision or supplement | Cancelled | — | |
| Sep 29, 2017 | 313 Castro St Shoring for the basement foundation. app 201708225549 Issued | Retaining wall or site work | Issued | Within 1 month | |
| Aug 22, 2017 | 313 Castro St Revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl. Expired | Revision or supplement | Expired | Within 1 month | |
| Aug 18, 2017 | 313 Castro St Convert (e) 1st floor to a 2nd unit. add 2 bedrooms, 1 bathroom, kitchen, living area & dining area in the 1st floor. Issued | ADU | Issued | 6 months | |
| May 1, 2017 | 313 Castro St Revision to pa 2017-0126-7992, revision to stairs and foundation Expired | Revision or supplement | Expired | Within 1 month | |
| Jul 14, 2014 | 240 Ewing Tr #0 Revision to existing pa #2012.1025.2861 - structural reinforcement on ground floor Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 30, 2014 | 720 02nd Av #0 Soft story retrofit per sfbc chapter 34b. 2012 iebc app a-4 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Mar 21, 2014 | 332 Presidio Av #0 Soft story retrofit per sfbc chapter 34b. engineering criteria is asce41-06. Complete | Seismic retrofit or foundation | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Scott Cibotti? Request a correction.