Scott Merrill Klopfer
Architect · Rsp Architects · Oak Grove
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38207First issued Oct 9, 2019, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2020, 10 in the last 5 years. Latest filed May 29, 2026.
- What kind of projects?
- Commercial or tenant improvement 10
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 13,564 permits.
Where
- Mission3
- Financial District/South Beach3
- Sunset/Parkside2
- Chinatown1
Most recent
- 2001 Mission StGround floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millworkMay 29, 2026Issued
- 1850 Irving StPhase 2 - commercial ti existing us bank, including ada upgrades. phase 2. no work in public rowMar 24, 2025Complete
- 1435 Stockton StTenant improvement to (e) us bank to include millwork, finishes, bank equipment & partitions /interior doorsFeb 10, 2025Complete
- 1850 Irving StTi for existing tenant (us bank); remodel includes demolition & construction of interior finishes, partitions, doors, etc ada, exterior & site upgrades. associated mep workFeb 9, 2024Filed
- 2001 Mission StInterior remodel (level 1) of existing for us bank, exisitng 2809 gross sqft multi-tenant bldg.Aug 17, 2023Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 29, 2026 | 2001 Mission St Ground floor- ti of (e) us bank space to include addition of banking equipment, accessiblity upgrades, power (outlet) additions, and millwork Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 23, 2025 | 1850 Irving St Revision to pa# 202503242856: to include new oneline diagram and load calculation table. Complete | Revision or supplement | Complete | 3 months | |
| Aug 14, 2025 | 1 California St Tenant improvement of (e) office for installation of non bearing partition wall, extend mechanical duct for return grille and relocate electrical outlets, no wall demolition, reference p/a 2024-0620-4858 for previously performed partial floor/subject tenant space ti. Issued | Revision or supplementType unconfirmed | Issued | 3 months | |
| Mar 24, 2025 | 1850 Irving St Phase 2 - commercial ti existing us bank, including ada upgrades. phase 2. no work in public row Complete | Commercial or tenant improvement | Complete | 3 months | |
| Feb 10, 2025 | 1435 Stockton St Tenant improvement to (e) us bank to include millwork, finishes, bank equipment & partitions /interior doors Complete | Commercial or tenant improvement | Complete | 4 months | |
| Feb 9, 2024 | 1850 Irving St Ti for existing tenant (us bank); remodel includes demolition & construction of interior finishes, partitions, doors, etc ada, exterior & site upgrades. associated mep work Filed | Commercial or tenant improvement | Filed | — | |
| Aug 17, 2023 | 2001 Mission St Interior remodel (level 1) of existing for us bank, exisitng 2809 gross sqft multi-tenant bldg. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Apr 25, 2023 | 595 Market St 23/f: interior ti of e business office space. work includes addition of no load bearing wall, network equipment room, mdf, doors, relocation of furniture and refresh of interior finishes. no structural work. no change in occupancy. no change in use or exterior work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 2, 2021 | 789 Mission St 2nd flr - install 3 2-door coolers, 1 3-door freezer, and 1 single door freezer to be used for grocery pickup. install 5 cooler/freezer electrical receptacles. install entry and restroom signage and restroom upgrades for ada compliance. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 9, 2021 | 1690 Folsom St Target: install two (2) two-door coolers, one (1) twp-door freezer, one (1) single-door freezer to be used for grocery pick up. install four (4) cooler/freezer electrical receptacles. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 20, 2021 | 233 Winston Dr Install 2 (2) door coolers & 2 single door cooler for grocery pick-up. 2 electrical receptacles. junction box, rebalance (e) supplies diffuser cooling max on (e) variable air volume box Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 23, 2020 | 1 California St 21st fl: int tenant improvement (e) off space. work incl non-struc demo & add of non-load bearing walls, doors & refresh of int finishes. no struc work. no chg of occup. no chg of use. new air distrib in area of work with new heat pump. ref pa 202010015688. sprinkler/fire alarm under sep permits. Complete | Commercial or tenant improvementType unconfirmed | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Scott Merrill Klopfer? Request a correction.