Stan Michael Wu
Engineer · Smw & Associates, Inc. · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License delinquentStructural Engineer S-4665First issued Jan 23, 2003, expires Jun 30, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 96 permits since 2004, 96 in the last 5 years. Latest filed Mar 10, 2026.
- What kind of projects?
- Home remodel 38 · Seismic retrofit or foundation 17 · Deck, stairs or patio cover 12
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 38 permits in San Francisco
Time to get a permit
Median from filing to permit, from 35 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 20,097 permits.
Where
- Lone Mountain/USF6
- Haight Ashbury4
- West of Twin Peaks4
- Noe Valley3
Most recent
- 1583 46th AvInterior remodel of level 1, covert portions of existing garage area into bedroom, replace (e) windows in kind or sliding door, relocate tankless water heater, voluntary seismic upgrade by adding plywood sheathing throughout and sill boltsJul 22, 2025Issued
- 2576 Green StStructural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interiorJun 18, 2025Complete
- 260 29th StRelocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom.Apr 11, 2025Withdrawn
- 538 Baker StModification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior wallsFeb 7, 2025Complete
- 2576 Green StBathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls onlyAug 30, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 10, 2026 | 3333 Jackson St Remove existing window, demolish wall to enlarge opening and install 3 new windows. (aluminum clad) Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Jul 25, 2025 | 1120 Elm St #0 Bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 2 months | |
| Jul 22, 2025 | 1583 46th Av Interior remodel of level 1, covert portions of existing garage area into bedroom, replace (e) windows in kind or sliding door, relocate tankless water heater, voluntary seismic upgrade by adding plywood sheathing throughout and sill bolts Issued | Home remodel | Issued | 7 months | |
| Jun 18, 2025 | 2576 Green St Structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interior Complete | Home remodel | Complete | Within 1 month | |
| Apr 11, 2025 | 260 29th St Relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom. Withdrawn | Home remodel | Withdrawn | — | |
| Mar 26, 2025 | 1590 Broadway Main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building. Complete | Revision or supplement | Complete | 1 month | |
| Feb 7, 2025 | 538 Baker St Modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior walls Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Aug 30, 2024 | 2576 Green St Bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls only Complete | Home remodel | Complete | 1 month | |
| Jun 13, 2024 | 1077 Page St #0 Interior renovation of the lower unit of a duplex bldg, and voluntary seismic strengthening of the lower floor and crawl space. removal of exist pop out structure at rear door. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| May 3, 2024 | 1100 Palou Av Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| May 3, 2024 | 1152 Palou Av Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| May 3, 2024 | 1033 Oakdale Av Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| May 3, 2024 | 1077 Oakdale Av Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| May 3, 2024 | 1096 Palou Av Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| May 3, 2024 | 754 Kirkwood Av (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. Issued | OtherType unconfirmed | Issued | 6 months | |
| May 3, 2024 | 778 Kirkwood Av (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. Complete | OtherType unconfirmed | Complete | 6 months | |
| Apr 4, 2024 | 740 Jerrold Av The project consists of new construction of a boardwalk ramp and sloped walkways connecting 2 viewing platforms. the boardwalk ramp, sloped walkways and viewing platforms consist of plastic composite slip-resistant decking supported above the (e) grade. wooden railings with handrails and wire mesh.. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Aug 3, 2023 | 2576 Green St Revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney. Complete | Revision or supplement | Complete | Within 1 month | |
| May 31, 2023 | 777 Broadway Revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system from Complete | Revision or supplement | Complete | 1 month | |
| Feb 3, 2023 | 1360 Fulton St #0 Kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing. Complete | Home remodel | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Stan Michael Wu? Request a correction.