Steven F Lew
Engineer · Tuan & Robinson S.E. Inc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4180First issued Mar 20, 1998, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 6 permits since 2016, 6 in the last 5 years. Latest filed Sep 10, 2024.
- What kind of projects?
- Other 2 · Commercial or tenant improvement 1 · Legalize or fix a violation 1
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 2 permits in San Francisco
Time to get a permit
Median from filing to permit, from 1 issued permit filed since 1966.
Where
- Financial District/South Beach1
- Oceanview/Merced/Ingleside1
Most recent
- 101 02nd StUnit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcoveFeb 22, 2023Complete
- 529 Bright StReplace exterior facade with new finishes and details to match neighborhood context: mission style. relocate entry door. widen (e) garage door to 8'0" wide, reconfigure porch & porch stairs for improved headroom.May 18, 2022Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 10, 2024 | 2 Turk St To comply with nov 202420075 concrete sidewalk repair which include concrete spall repairs and steel rebar cleaning and preparation. (n) steel rebar will be installed. rwr will install shoring to stabilize the sidewalk and complete repairs from the underside in the basement Complete | Legalize or fix a violation | Complete | 2 months | |
| Aug 6, 2024 | 223 Crestmont Dr Replace (2) existing decks at the back of building to fix dryrot deck structure in kind. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| May 23, 2023 | 101 02nd St Revision to 202302222355 revised structural details Complete | Revision or supplement | Complete | Within 1 month | |
| May 23, 2023 | 335 Powell St Renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep Complete | Commercial or tenant improvement | Complete | 4 months | |
| May 12, 2023 | 335 Powell St Proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal Complete | Revision or supplement | Complete | 13 months | |
| Feb 22, 2023 | 101 02nd St Unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcove Complete | Other | Complete | Within 1 month | |
| May 18, 2022 | 529 Bright St Replace exterior facade with new finishes and details to match neighborhood context: mission style. relocate entry door. widen (e) garage door to 8'0" wide, reconfigure porch & porch stairs for improved headroom. Withdrawn | Other | Withdrawn | — | |
| Mar 3, 2021 | 222 Mason St #0 Revision to pa 202007069618. updating structural attachments for slope ladder and cat walk assemblies at upper story and pool roof. not visible from the street. Withdrawn | Revision or supplement | Withdrawn | — | |
| Nov 14, 2016 | 1530 Irving St Soft story retrofit per sfbc chapter 34b, fema p-807 Complete | Seismic retrofit or foundation | Complete | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Steven F Lew? Request a correction.