Stuart David Hills
Architect · Apparatus · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-24966First issued Apr 12, 1994, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 51 permits since 2000, 51 in the last 5 years. Latest filed Oct 30, 2026.
- What kind of projects?
- Home remodel 27 · Addition 8 · Legalize or fix a violation 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 27 permits in San Francisco
Time to get a permit
Median from filing to permit, from 27 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Noe Valley4
- Marina3
- Sunset/Parkside3
- Twin Peaks3
Most recent
- 42 Casa WyRefinish and update kitchen, update bathroom and relocate shower in primary bath. convert wine cellar to laundry room. no sq ft or habitable space added in scopeOct 30, 2026Issued
- 1743 32nd AvRemodel kitchen, convert full bath into two full baths. addition of walls in basement to create laundry and bicycle room. replacement of rear door.May 1, 2026Issued
- 8 Dellbrook AvBasement remodel: addition of full bath, laundry room and study room. demo of non-structural walls. stairs and bedroom are existing and to remain.Mar 6, 2026Issued
- 2745 Kirkham StRemodel of lower level; install new kitchenette, replace bathroom finishes, and addition of walk in closet.Jan 29, 2026Issued
- 295 Hazelwood AvConverting a portion of e lower level. currently used for mechanical and storage purposes into conditioned sq footage to include 1 bedroom, den, multi purpose room, full bath, 1/2 bath, rear doors to patio,retaining wall.Jun 17, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 30, 2026 | 42 Casa Wy Refinish and update kitchen, update bathroom and relocate shower in primary bath. convert wine cellar to laundry room. no sq ft or habitable space added in scope Issued | Home remodel | Issued | Within 1 month | |
| May 1, 2026 | 1743 32nd Av Remodel kitchen, convert full bath into two full baths. addition of walls in basement to create laundry and bicycle room. replacement of rear door. Issued | Home remodel | Issued | 2 months | |
| Mar 6, 2026 | 8 Dellbrook Av Basement remodel: addition of full bath, laundry room and study room. demo of non-structural walls. stairs and bedroom are existing and to remain. Issued | Home remodel | Issued | Within 1 month | |
| Feb 13, 2026 | 1559 Willard St Replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tub Issued | Deck, stairs or patio cover | Issued | 5 months | |
| Jan 29, 2026 | 2745 Kirkham St Remodel of lower level; install new kitchenette, replace bathroom finishes, and addition of walk in closet. Issued | Home remodel | Issued | Within 1 month | |
| Aug 21, 2025 | 1300 09th Av T.i. of e) gutted restaurant space for new restaurant. work included install of all new food service equipment, partial updated interior, finishes thru, demo of 1 e) walk-in cooler ( w/ infill/patch remaining) no exterior work Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jun 17, 2025 | 295 Hazelwood Av Converting a portion of e lower level. currently used for mechanical and storage purposes into conditioned sq footage to include 1 bedroom, den, multi purpose room, full bath, 1/2 bath, rear doors to patio,retaining wall. Issued | Home remodel | Issued | Within 1 month | |
| Feb 27, 2025 | 2 Corwin St #0 Revision to pa# 202409251589: eliminate a post and beam as part of a kitchen remodel. creaste a storage room. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 20, 2025 | 3863 19th St Revision to pa # 2018-1102-4870 ground fl change room label of "(e) storage" to " (p) bedroom". show window in bedroom Expired | Revision or supplement | Expired | Within 1 month | |
| Dec 12, 2024 | 1980 Vallejo St #8 Reconfiguration of non structural walls, remodel of kitchen & bathrooms, removal and replacement of flooring in various rooms. Complete | Home remodel | Complete | 2 months | |
| Sep 25, 2024 | 2 Corwin St #0 Kitchen and pantry remodel. extend (e) pantry to back storage area. no structural work or expansion of building envelope. Complete | Home remodel | Complete | 2 months | |
| Jul 30, 2024 | 3863 19th St Revision to pa # 2018-1102-4870 expansion of bathroom no longer included in scope of work Expired | Revision or supplement | Expired | Within 1 month | |
| Feb 7, 2024 | 435 Duncan St Revision to pa# 202208261365 reduced scope of sheet walls & foundation work noted on plans. structural foundation work and sheer wall on garage level only (1st fl). east lightwell infill at garage level only Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 4, 2023 | 1261 Rhode Island St To comply with nov 202313138. front yard fence 4 feet height. Issued | Legalize or fix a violation | Issued | 34 months | |
| May 17, 2023 | 289 Douglass St Revision to pa 2023-0222-2396 to include a new skylight; new (interior) guardrail in vreakfast area; new opening between kitchen & dining, shower & sinks in new primary bath. Complete | Revision or supplement | Complete | 1 month | |
| Feb 22, 2023 | 289 Douglass St Interior remodel includes a new storage room, kitchen remodel, new primary closet and bath and a new shower tub in a existing bathroom. Complete | Home remodel | Complete | Within 1 month | |
| Nov 22, 2022 | 2155 12th Av Renovation of 1st fl. interior remodel. construction of back yard patio, replacement of furnace and water heater, no structural work Complete | Home remodel | Complete | 1 month | |
| Aug 26, 2022 | 435 Duncan St Consists of structural foundation work and structural shear walls on garage and first floor(no changes to bldg envelope) Complete | Home remodel | Complete | Within 1 month | |
| Apr 25, 2022 | 435 Duncan St Remodel bathroom. replace electrical / plumbing in several rooms. new sheetrock as shown on plans. all work is non-structural only. Complete | Home remodel | Complete | 2 months | |
| Apr 6, 2022 | 3253 Baker St Main level full bath & half hath remodel. upper level primary bath relocation. primary closet reconfiguration. replace in-kind 5 street facing windows. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Stuart David Hills? Request a correction.