CheckMyDesigner

Teresa K Emery

Architect · Forge Architecture · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License delinquentArchitect C-14087First issued May 24, 1983, expires Aug 31, 2023.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
181 permits since 2005, 181 in the last 5 years. Latest filed Dec 15, 2022.
What kind of projects?
Commercial or tenant improvement 153 · Other 19 · Deck, stairs or patio cover 4
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 153 permits in San Francisco

From 2005 to 2022, latest filed Dec 15, 2022.
Permits
235 permits that name Teresa K Emery, newest first, including 54 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Dec 15, 2022303 02nd St

To convert (4)(e) parking stalls into (1) van accessible ev charging stall & (1) standard ev charging stall. new type-3 ev chargers provided at each stall per sf ordinance 244-19

Complete
Dec 15, 2022519 Powell St

New ti improvement on the mezzanine flr, construction of non-structural partitions, millworks, finishes, ceiling, mep, lighting fixtures and restrooms

Cancelled
Dec 13, 2022303 02nd St

4th/flr: restroom upgrades: includes removal of all existing finishes, wallpaper & corner guards, particle walls & prep for new finish. remove plumbing fixtures, equipments, accessories, toilet partitions. provide new finishes, plumbing fixtures, equipments, accessories & toilet partitions.

Cancelled
Dec 13, 2022100 California St

6/f suite 600: demolition of non-structural partitions and millwork. new construction of non-structural partitions, operable folding partition, new breakroom for employees only.

Complete
Dec 8, 202244 02nd St

This permit is for change of use, in connection with planning dept. case no 2022-003210cua.

Withdrawn
Dec 8, 2022360 03rd St

Suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.

Withdrawn
Dec 7, 2022360 03rd St

1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms.

Complete
Dec 2, 202244 02nd St

Comply with accessible business program: main entry door upgrade, work includes removal of existing interior and exterior push buttons and ex isting door operator. remove components to be replaced with ada compliant push button pedestals and door operator abe 202209144307

Complete
Nov 30, 20221 Market St

39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms.

Complete
Oct 31, 202244 02nd St

Change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included.

Complete
Oct 6, 202255 02nd St #0

19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes.

Complete
Oct 4, 2022303 02nd St

Demolition of non structural paritions, ceiling, lighting, millwork and finsihes. new construction of non structural partitoins, ceiling, lighting, elec, finishes.

Complete
Sep 21, 2022100 Hooper St

G/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep.

Complete
Sep 21, 2022601 Montgomery St

Commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbing

Complete
Sep 19, 2022170 Maiden Ln

Barrier removal at the primary office entry and interior accessible path of travel. new power door operators and replacement of floor designation signage at elevator door jambs. abe 201810312342.

Complete
Sep 14, 2022601 Montgomery St

8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing

Complete
Sep 6, 2022740 Market St

Demo interior @ ground fl & roof top eqiuipment only of non structural partitions, ceiling, finishes & associated mep.

Issued
Aug 19, 2022303 02nd St

5/f:revision to pa# 202201146043. scope of work includes to provide framing partitions behind toilet in women ada stall per dbi inspector comments.

Complete
Aug 11, 20221 Market St

Suite 1050: rev to pa202203079332 - layout changes. no structural work.

Complete
Jul 22, 2022560 Mission St

19/f: accessibility upgtrades in the (e) restrooms, new finishes, ceiling and lighting fixtures. new door frames and hardware at (e0 elevator lobby and coridors in the tenant suite.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Teresa K Emery? Request a correction.