CheckMyDesigner

Tomer Maymon

Architect · Tomer Maymon, Aia · Brisbane

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-31492First issued Mar 20, 2008, expires Aug 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
17 permits since 2008, 17 in the last 5 years. Latest filed Apr 28, 2025.
What kind of projects?
Home remodel 5 · Legalize or fix a violation 4 · Addition 3
How long do their permits take?
Home remodel: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 5 permits in San Francisco

From 2019 to 2023, latest filed Aug 28, 2023.
Permits
24 permits that name Tomer Maymon, newest first, including 7 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jun 23, 2025410 29th St

Ab-004: rev to pa # 202502200697: accomodate shift of the side east lightwell to increase clear exposure toward the adj. neighbor lightwell. remove sw dormer, shorten nw dormer. no change to overall envelope, same front/rear facade locations. same height. no addition floor area, plumbing fixtures.

Complete
Apr 28, 2025410 29th St

Address nov #202536837 with the correction work reviewed and approved by planning & building structural at pa 2025-0403-3675. correction work ensures the approved permit 2019-0204-2033 proceeds with no change

Complete
Apr 3, 2025410 29th St

Following up minor correction to (2) 5' fo9undation sections on site to ensure the approved sow at permit #201902042033 proceeds with no change of its design and sections.

Complete
Feb 20, 2025410 29th St

Small horizontal only addition to (e) approved at sides and rear only. small dormers less than 20% of roof area. no change to front facade, proposed change starts 22 ft from front. no work in public right of way.

Complete
Feb 5, 2024460 29th St

Revision update with field verified information at rear yard. no change to approved pa#202308285440. replace in-kind (e) retaining walls

Complete
Jan 4, 2024460 29th St

Proposed small side addition at the western lightwell, 78 sq.ft, 2nd level only. no change to front facade, 15'-0" setback from front. no work in public right of way. interior remodel / structural upgrade under pa# 202308285440.

Withdrawn
Aug 28, 2023460 29th St

Interior remodel within the envelope. new kitchen and bathrooms, new mep, new forced aire furnace. new skylights, roofing, interior finishes & flooring. voluntary structural upgrade. repair in-kind dryrot. no change to building front, no additional envelope. no work in public right of way.

Complete
Aug 8, 20222959 23rd St

Structural revisions to pa201707212560: shifted shearwall & walls.

Complete
Mar 28, 202261 Capp St #0

Revision to pa# 202203029095. update information - existing w.c. at ground floor. no change of plumbing unit count.

Complete
Mar 2, 202261 Capp St

All 4 units: interior remodel with existing envelop. kitchens, bathrooms, utility/storage spaces.new finishes at kitchens and bathrooms, storage/office and bedrooms, new mep, furnace, skylights, flooring. repair in kid dryrot. no vertical or horizontal addition to existing envelope.

Complete
Jun 29, 202132 Massasoit St

To comply nov 2021179181. interior remodel within the envelope with the following items: open layout @ top floor, convert existing stoarage space to habitable @ ground floor within envelope, & add exterior stairs from top floor @ side yard. remodel includes mep, new kitchen & bathrooms, new finishes

Complete
Nov 30, 20203520 17th St

Interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace.

Complete
Nov 30, 20203524 17th St

Interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen & bathroom, new water heater, new hvac/ducts.

Complete
Aug 27, 2020518 Anderson St

Revision to pa #201207054119: smaller footprint of the livable enclosed area. enhanced voluntary structural upgrade. no change made of occupancy or use.

Withdrawn
Jan 23, 202073 Lobos St

To demolish a 1-story type-v, accessory storage shed in rear.

Issued
Oct 4, 2019750 26th Av

Replacing existing 10' wire fence on four sides. street facing wil be 75% open.

Complete
Aug 20, 2019363 Bright St

New small deck at backyard. deck only. no change to scope of work under 201908158889. no amendments to exterior envelope, no changes to bld front. no work in the public right of way

Complete
Aug 15, 2019363 Bright St

Renew/remodel master bedroom and extend the scope of initial permit 201908027709 including its bathroom and kitchen remodel all work is within extg envelope, no work at puplic right of way

Complete
May 29, 20193835 Ulloa St

Renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place.

Complete
Apr 15, 201973 Lobos St

Add unit per ord #95-17. join existing spaces to provide exposure requirement at ground floor. clean out of shelving/2nd layer of laminated flooring if needed for min head clearance vif.

Filed

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Tomer Maymon? Request a correction.