Towan Kim
Architect · Brayton Hughes Design Studios · Berkeley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-32466First issued Feb 25, 2010, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2015, 10 in the last 5 years. Latest filed Jun 16, 2026.
- What kind of projects?
- Home remodel 4 · Other 2 · Addition 1
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,196 permits.
Where
- Russian Hill1
- North Beach1
- Pacific Heights1
- Marina1
Most recent
- 930 Chestnut St #0Interior remodel - lv 1 closet conversion to new powder room, lv 2 partial conversion of (e) shower to closet.Jun 16, 2026Issued
- 1407 Montgomery St #3Demolition of interior walls, doors, glazing, millwork, lighting, electrical, plumbing, finishes. install of new interior walls, doors, glazing, millwork, lighting, electrical, plumbing, finishes. no alteration of exterior.Jun 3, 2022Complete
- 65 Raycliff TrInterior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors.Apr 19, 2021Issued
- 2824 Scott St #0Alteration to existing residence, interior remodel, repair decks, update architectural features on facades, wood and trim work, new glazing, replace windows and doors. n/a maher ordinance #155-13.Jul 14, 2015Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 16, 2026 | 930 Chestnut St #0 Interior remodel - lv 1 closet conversion to new powder room, lv 2 partial conversion of (e) shower to closet. Issued | Home remodel | Issued | Within 1 month | |
| Dec 22, 2022 | 1407 Montgomery St #3 Unit 3: replacement of (e) terrace window with new door in-kind replacement of select exterior door and window (not visible from street). new hvac unit. Complete | Other | Complete | 2 months | |
| Jun 3, 2022 | 1407 Montgomery St #3 Demolition of interior walls, doors, glazing, millwork, lighting, electrical, plumbing, finishes. install of new interior walls, doors, glazing, millwork, lighting, electrical, plumbing, finishes. no alteration of exterior. Complete | Home remodel | Complete | 2 months | |
| Nov 18, 2021 | 65 Raycliff Tr Adu conversion of (e) bedroom and study at lower level addition of (n) kitchen that includes (n) appliances, plumbing, millwork & finishes. addition of (n) interior wall and door at (e) mechanical space to create (n) entry at adu. addition of new exterior stair to provide pedestrian access into adu Issued | ADU | Issued | 12 months | |
| Aug 25, 2021 | 700 Marina Bl Minor interior renovation: meeting room at south eash corner of ground floor. remove and replace interior non bearing walls and all finishes and fixtures. no exterior alterations. no structural alterations. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Apr 19, 2021 | 65 Raycliff Tr Interior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors. Issued | Home remodel | Issued | 1 month | |
| Feb 16, 2021 | 65 Raycliff Tr Revision to pa 202003025863: partial demolition of interior walls, doors, mill work, lighting and finishes. no change to exterior building envelope. no change to fixture count. m.e.p are design-build as required. Issued | Revision or supplement | Issued | 2 months | |
| Mar 2, 2020 | 65 Raycliff Tr Revision to pa# 201810264317. voluntary seismic retrofit. top floor interior fixtures & finishes & wet bar. Issued | Revision or supplement | Issued | 7 months | |
| Jun 29, 2017 | 2650 Green St Replace existing sloped skylight with new. patdh & repair roof as needed. Complete | Other | Complete | Within 1 month | |
| Feb 13, 2017 | 2650 Green St Horizontal addition.new sitting room off bedroom (e). add 112 sqft at rear of 3rd floor. interior remodel finishes & fixtures. Complete | Addition | Complete | 12 months | |
| Dec 6, 2016 | 2445 Polk St #4 Addition & alteration to (e) roof deck; remove (e) penthouse stair; install (n) spiral stair in penthouse; reroof; interior alterations @ 3rd floor; (n) window for (e) opening at lightwell; (n) roof top trellis & guardrails. Withdrawn | Deck, stairs or patio cover | Withdrawn | — | |
| Jul 14, 2015 | 2824 Scott St #0 Alteration to existing residence, interior remodel, repair decks, update architectural features on facades, wood and trim work, new glazing, replace windows and doors. n/a maher ordinance #155-13. Complete | Home remodel | Complete | 45 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Towan Kim? Request a correction.