Tyler Moser
Engineer · Halyard Inc · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-84735First issued Dec 15, 2015, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 26 permits since 2019, 26 in the last 5 years. Latest filed Mar 6, 2026.
- What kind of projects?
- Home remodel 15 · Seismic retrofit or foundation 4 · ADU 3
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: 8 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 15 permits in San Francisco
Time to get a permit
Median from filing to permit, from 14 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 1,117 permits.
Where
- Haight Ashbury3
- Marina3
- Hayes Valley3
- Inner Richmond2
Most recent
- 248 Central Av #0Interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bathMar 6, 2026Issued
- 1485 Clay StReconstruction of portions of structure severely damaged by fire. structural alterations are required for like repair with modern available wood products. significant portions of interior finishes will need to be replaced with drywall due to removal of plaster finishes during environmentalJun 22, 2022Issued
- 1900 Page StRenovation of unit# 2 on 2nd floor. new kitchen cabinets & plumbing fixtures. new washer dryer & dishwasher. new lighting at (e0 j-boxes. no changes to mechanical. no exterior work. fire alarm, or sprinkler. structural work required.Nov 2, 2021Issued
- 2942 Franklin St#14: renovation of 1 apartment on 4th level. new kitchen cabinets and plumbing fixtures. new washer/dryer and dishwasher. existing bedroom changed to living rm new lighting at extg j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. structural work required.Oct 7, 2021Complete
- 700 Church StUnit 312, 4/f: new multimedia room, new kitchen cabinets and plumbing fixtures. new washer/dryer, dishwasher. new lighting at (e) j-box locations. replace (e) deck guardrail to comply with code requirement. no fire alarm or sprinkler work. replace sink cabinet & tub in bathroom.Sep 10, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 6, 2026 | 248 Central Av #0 Interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bath Issued | Home remodel | Issued | 4 months | |
| Mar 26, 2024 | 1290 Grove St Ref 202002043526- additional siesmic upgrades based on (e) conditions and planned demolition for adus Filed | Revision or supplement | Filed | — | |
| Nov 30, 2023 | 1077 Ashbury St Revision to pa# 202303133566, new foundation segment to soft story retrofit, per cebc 2022 chap4, comply with 201490833, including (e) condition construction revisions. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 13, 2023 | 1077 Ashbury St Soft story retrofit per cebc 2022 appendix a-4. to satisfy the city of sf ssr ma incld. addition of moment frames, sheated walls and bolted sills. comply w/ 2019 90833. Complete | Seismic retrofit or foundation | Complete | 5 months | |
| Feb 9, 2023 | 1935 Jefferson St Shoring of (e) structure to complete the structure as permitted under pa 2020-0615-8744 Cancelled | Revision or supplement | Cancelled | — | |
| Sep 14, 2022 | 1234 Grove St Retrofit to comply with nov 202294960. soft story retrofit of the ground story with additional wood sheathed shear walls with new and retrofitted foundations and diaphragm connections under the first floor. (asce 41-13 enginnering criteria) Complete | Legalize or fix a violationType unconfirmed | Complete | 3 months | |
| Jun 22, 2022 | 1485 Clay St Reconstruction of portions of structure severely damaged by fire. structural alterations are required for like repair with modern available wood products. significant portions of interior finishes will need to be replaced with drywall due to removal of plaster finishes during environmental Issued | Home remodel | Issued | 14 months | |
| Apr 1, 2022 | 90 Alhambra St Work to be performed is a soft story retrofit at the first floor on the subject building . all work in done in conformance with the 2019 sfbc. Cancelled | Seismic retrofit or foundation | Cancelled | — | |
| Feb 24, 2022 | 1801 California St Revision to pa 201811206437. architectural layout to accomodate (e) conditions. revision to structural scope. no change to mechanical, sprinkler system filed under separate pa 202104208973. new exterior ground floor windows - change deisgn to wood casement. Issued | Revision or supplement | Issued | 3 months | |
| Jan 12, 2022 | 1485 Clay St Temporary shoring to facilitate safe abatement of fire damaged building. Complete | Retaining wall or site workType unconfirmed | Complete | 1 month | |
| Nov 2, 2021 | 1900 Page St Renovation of unit# 2 on 2nd floor. new kitchen cabinets & plumbing fixtures. new washer dryer & dishwasher. new lighting at (e0 j-boxes. no changes to mechanical. no exterior work. fire alarm, or sprinkler. structural work required. Issued | Home remodel | Issued | 1 month | |
| Oct 7, 2021 | 2942 Franklin St #14: renovation of 1 apartment on 4th level. new kitchen cabinets and plumbing fixtures. new washer/dryer and dishwasher. existing bedroom changed to living rm new lighting at extg j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. structural work required. Complete | Home remodel | Complete | 1 month | |
| Sep 10, 2021 | 700 Church St Unit 312, 4/f: new multimedia room, new kitchen cabinets and plumbing fixtures. new washer/dryer, dishwasher. new lighting at (e) j-box locations. replace (e) deck guardrail to comply with code requirement. no fire alarm or sprinkler work. replace sink cabinet & tub in bathroom. Issued | Home remodel | Issued | Within 1 month | |
| Jul 20, 2021 | 753 Larkin St Replace interior guardrails & interior stair in kind per current codel repair area of flooring & joist in kind where needed. (work in retail space #749). Issued | Commercial or tenant improvementType unconfirmed | Issued | 3 months | |
| Jul 7, 2021 | 1431 Grove St Renovation of 1 apartment : unit 07 third level new bedroom. new kitchen cabinets and plumbing fixtures. new washer and dryer and dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. Complete | Home remodel | Complete | 2 months | |
| Apr 9, 2021 | 225 Mallorca Wy 4 units remodeal: unit 104 and 105 (2/f), unit 204 (3/f), unit 304 (4/f): new bedrooms and bathrooms. new kitchen cabinets and plumbing fixtures. new w/d and dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, or sprinkler. Issued | Home remodel | Issued | 3 months | |
| Mar 8, 2021 | 4005 California St Unit #3: new office, den, & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler. delete (e) bedroom. Complete | Home remodel | Complete | 3 months | |
| Dec 14, 2020 | 795 Ashbury St #0 Unit #a on 4th floor: new bedroom, new kitchen cabinets, new washer/dryer & dishwasher. new plumbing fixtures. no change to mech, no exterior work, no fire alarm or sprinkler work. Complete | Home remodel | Complete | 3 months | |
| Nov 17, 2020 | 179 Dolores St Unit 6. (n) bedrm, kitchen cabs & plumb fixtures. (n) washer / dryer & dishwasher. (n) light at (e) j-box locations. no exterior work. no fire alarm or sprinkler work. structural included. Issued | Home remodel | Issued | 4 months | |
| Nov 10, 2020 | 4005 California St Apt 10: new bedroom, and bathroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwaster. new lighting at (e) j-boxes. no change to mechnical. no exterior work, fire alarm or sprinkler. included structural. maher n/a. Complete | Home remodel | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Tyler Moser? Request a correction.