CheckMyDesigner

Tyler Moser

Engineer · Halyard Inc · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-84735First issued Dec 15, 2015, expires Mar 31, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
26 permits since 2019, 26 in the last 5 years. Latest filed Mar 6, 2026.
What kind of projects?
Home remodel 15 · Seismic retrofit or foundation 4 · ADU 3
How long do their permits take?
Home remodel: 2 months. City typical for the same review: 8 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 15 permits in San Francisco

From 2019 to 2026, latest filed Mar 6, 2026.

Time to get a permit

Theirs
2 months
City
8 months

Median from filing to permit, from 14 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 1,117 permits.

Where

  • Haight Ashbury3
  • Marina3
  • Hayes Valley3
  • Inner Richmond2

Most recent

Permits
35 permits that name Tyler Moser, newest first, including 9 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Mar 6, 2026248 Central Av #0

Interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bath

Issued
Mar 26, 20241290 Grove St

Ref 202002043526- additional siesmic upgrades based on (e) conditions and planned demolition for adus

Filed
Nov 30, 20231077 Ashbury St

Revision to pa# 202303133566, new foundation segment to soft story retrofit, per cebc 2022 chap4, comply with 201490833, including (e) condition construction revisions.

Complete
Mar 13, 20231077 Ashbury St

Soft story retrofit per cebc 2022 appendix a-4. to satisfy the city of sf ssr ma incld. addition of moment frames, sheated walls and bolted sills. comply w/ 2019 90833.

Complete
Feb 9, 20231935 Jefferson St

Shoring of (e) structure to complete the structure as permitted under pa 2020-0615-8744

Cancelled
Sep 14, 20221234 Grove St

Retrofit to comply with nov 202294960. soft story retrofit of the ground story with additional wood sheathed shear walls with new and retrofitted foundations and diaphragm connections under the first floor. (asce 41-13 enginnering criteria)

Complete
Jun 22, 20221485 Clay St

Reconstruction of portions of structure severely damaged by fire. structural alterations are required for like repair with modern available wood products. significant portions of interior finishes will need to be replaced with drywall due to removal of plaster finishes during environmental

Issued
Apr 1, 202290 Alhambra St

Work to be performed is a soft story retrofit at the first floor on the subject building . all work in done in conformance with the 2019 sfbc.

Cancelled
Feb 24, 20221801 California St

Revision to pa 201811206437. architectural layout to accomodate (e) conditions. revision to structural scope. no change to mechanical, sprinkler system filed under separate pa 202104208973. new exterior ground floor windows - change deisgn to wood casement.

Issued
Jan 12, 20221485 Clay St

Temporary shoring to facilitate safe abatement of fire damaged building.

Complete
Nov 2, 20211900 Page St

Renovation of unit# 2 on 2nd floor. new kitchen cabinets & plumbing fixtures. new washer dryer & dishwasher. new lighting at (e0 j-boxes. no changes to mechanical. no exterior work. fire alarm, or sprinkler. structural work required.

Issued
Oct 7, 20212942 Franklin St

#14: renovation of 1 apartment on 4th level. new kitchen cabinets and plumbing fixtures. new washer/dryer and dishwasher. existing bedroom changed to living rm new lighting at extg j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. structural work required.

Complete
Sep 10, 2021700 Church St

Unit 312, 4/f: new multimedia room, new kitchen cabinets and plumbing fixtures. new washer/dryer, dishwasher. new lighting at (e) j-box locations. replace (e) deck guardrail to comply with code requirement. no fire alarm or sprinkler work. replace sink cabinet & tub in bathroom.

Issued
Jul 20, 2021753 Larkin St

Replace interior guardrails & interior stair in kind per current codel repair area of flooring & joist in kind where needed. (work in retail space #749).

Issued
Jul 7, 20211431 Grove St

Renovation of 1 apartment : unit 07 third level new bedroom. new kitchen cabinets and plumbing fixtures. new washer and dryer and dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work.

Complete
Apr 9, 2021225 Mallorca Wy

4 units remodeal: unit 104 and 105 (2/f), unit 204 (3/f), unit 304 (4/f): new bedrooms and bathrooms. new kitchen cabinets and plumbing fixtures. new w/d and dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, or sprinkler.

Issued
Mar 8, 20214005 California St

Unit #3: new office, den, & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler. delete (e) bedroom.

Complete
Dec 14, 2020795 Ashbury St #0

Unit #a on 4th floor: new bedroom, new kitchen cabinets, new washer/dryer & dishwasher. new plumbing fixtures. no change to mech, no exterior work, no fire alarm or sprinkler work.

Complete
Nov 17, 2020179 Dolores St

Unit 6. (n) bedrm, kitchen cabs & plumb fixtures. (n) washer / dryer & dishwasher. (n) light at (e) j-box locations. no exterior work. no fire alarm or sprinkler work. structural included.

Issued
Nov 10, 20204005 California St

Apt 10: new bedroom, and bathroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwaster. new lighting at (e) j-boxes. no change to mechnical. no exterior work, fire alarm or sprinkler. included structural. maher n/a.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Tyler Moser? Request a correction.