Vito K Vanoni
Architect · Sfdpw · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-27134First issued Oct 23, 1997, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 29 permits since 2015, 29 in the last 5 years. Latest filed Apr 27, 2026.
- What kind of projects?
- Other 13 · Commercial or tenant improvement 12 · Deck, stairs or patio cover 2
- How long do their permits take?
- Deck, stairs or patio cover: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966.
Where
- Twin Peaks2
- Sunset/Parkside2
- Outer Richmond2
- Western Addition2
Most recent
- 441 12th AvReplacement of emergency diesel generator at grade in rear yard (same size same location) and above ground belly fuel tank upgrade from 30 gallon to 521 gallon size to provide minimum 72 hour run time of generator for supporting all loads of building.Jun 29, 2018Complete
- 2430 San Bruno AvReplacement of (e) apparatus bay doors (telescoping door) with (n) bi-foldingdoors for fire station 42Jun 11, 2018Issued
- 285 Olympia WyReplacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doorsJun 11, 2018Issued
- 1348 45th AvReplacement of (e) apparatus bay door (telecsoping door) with new four-fold door. maher naJun 11, 2018Issued
- 551 26th AvReplacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doorsJun 11, 2018Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 27, 2026 | 1814 Stockton St Install new metal ladder and metal safety railing for access by maintenance personnel to roof of the stair penthouse Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Dec 26, 2025 | 551 26th Av Replace (e) generator, belly tank, concrete pad, & exhaust piping in rear yard w/ new in same location. replace ats inside building with new ats. remove (e) interior window and fill-in opening to match (e) partition. provide new accessible restroom signage at (e) single user restroom. Filing | Commercial or tenant improvementType unconfirmed | Filing | — | |
| Oct 17, 2024 | 1000 Ocean Av Revision to approved permit 201909101242. revisions include minor changes to vertical circulation within unoccupied tower, (4) new electrical convenience outlets, and new metal conduit for emergency raiod communication systems. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 18, 2021 | 630 Valencia St Structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms. Complete | Home remodelType unconfirmed | Complete | 12 months | |
| Jul 21, 2021 | 1340 Powell St Differed submittl for (n) pull piping installation for (n) roof generator ref pa# 2019-0211-2558. Complete | Revision or supplement | Complete | 3 months | |
| Dec 30, 2019 | 762 Fulton St Revision to pa #201805017873. to clarify occupancy use details per plan. no construction - no chnage to occupant load. establish occupancy for assembly permit only. Issued | Revision or supplement | Issued | 13 months | |
| Dec 30, 2019 | 200 Cashmere St Voluntary exterior stair serving rear yard. new and altered gates for tnew stair. accessible path of travel improvments. Issued | Deck, stairs or patio cover | Issued | 2 months | |
| Jun 29, 2018 | 441 12th Av Replacement of emergency diesel generator at grade in rear yard (same size same location) and above ground belly fuel tank upgrade from 30 gallon to 521 gallon size to provide minimum 72 hour run time of generator for supporting all loads of building. Complete | Other | Complete | 6 months | |
| Jun 11, 2018 | 2430 San Bruno Av Replacement of (e) apparatus bay doors (telescoping door) with (n) bi-foldingdoors for fire station 42 Issued | Other | Issued | Within 1 month | |
| Jun 11, 2018 | 285 Olympia Wy Replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doors Issued | Other | Issued | Within 1 month | |
| Jun 11, 2018 | 1348 45th Av Replacement of (e) apparatus bay door (telecsoping door) with new four-fold door. maher na Issued | Other | Issued | Within 1 month | |
| Jun 11, 2018 | 551 26th Av Replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doors Issued | Other | Issued | Within 1 month | |
| May 1, 2018 | 762 Fulton St No construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2. Issued | Revision or supplement | Issued | 1 month | |
| Feb 26, 2018 | 762 Fulton St No construction. establish occupancy for assembly permit. Issued | OtherType unconfirmed | Issued | 2 months | |
| Feb 26, 2018 | 499 41st Av Replacement of (e) apparatus bay door (telescoping door) with (n) ceiling door Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Dec 19, 2017 | 1 Dr. Carlton B. Goodlett Pl Assesor's office tenant improvement of interior space. the scope include selective demolitio, ada barrier removal, construction of interior low wall partition, architectural finishes and fresh air ventilationl no impact to exterior; work to non-historic features. n/a maher Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 23, 2017 | 1067 Post St Revision to pa #2015-0630-0285. location of fuel filler and location of fuel tank and new control circuit requested by electrical inspector. Complete | Revision or supplement | Complete | 2 months | |
| Dec 23, 2016 | 2241 Jerrold Av Priority processing. at lot 004 & 006, demolish 2 story, s-1 storage buildings (2-buildings). maher n/a Complete | Other | Complete | 16 months | |
| Nov 23, 2016 | 299 Vermont St Removal & replacement of (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units. maher na Issued | Other | Issued | Within 1 month | |
| Nov 23, 2016 | 1348 45th Av Removal & replacement of (e) roofing system, down to (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units Complete | Other | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.