Wesley Alan Herr
Architect · Sherman Oaks
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-40025First issued Sep 28, 2022, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2025, 10 in the last 5 years. Latest filed Sep 24, 2026.
- What kind of projects?
- Commercial or tenant improvement 8 · Home remodel 1 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- Financial District/South Beach6
- Chinatown2
Most recent
- 550 California StSuite 240, 2nd flr. interior demo of non-structural elements. interior partitions, doors, finishes, ceilings, lighting, mech, elec. outlets and switches.Sep 24, 2026Issued
- 353 Sacramento StSte 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferredJun 25, 2026Issued
- 353 Sacramento St23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughoutMay 21, 2026Complete
- 353 Sacramento St3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferredApr 14, 2026Issued
- 353 Sacramento St12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferredMar 5, 2026Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 24, 2026 | 550 California St Suite 240, 2nd flr. interior demo of non-structural elements. interior partitions, doors, finishes, ceilings, lighting, mech, elec. outlets and switches. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 17, 2026 | 353 Sacramento St Removal & reinstallation of existing entry door at the same location with a modified configuration on the ground floor. does not affect fixture quantities, occupant load calculations or path of travel. no site, landscape or use changes are proposed. building does not have a prking garage. Filed | Other | Filed | — | |
| Jun 25, 2026 | 353 Sacramento St Ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferred Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 4, 2026 | 706 Sansome St #0 !/fl- ref 202505216975- add structrual engineered drawings Filed | Revision or supplement | Filed | — | |
| May 21, 2026 | 353 Sacramento St 23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 23, 2026 | 706 Sansome St #0 Package (b) revision to pa# 202505216977: 1) elevator doors (e) to remain and unreasonable hardship request 2) removal of pantry scope - millwork, electrical, some plumbing. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 23, 2026 | 706 Sansome St #0 Package (a) revision to pa# 202505216975: 1) lobby pantry location, impacting egress path; (2) handrail details added & egress width coordination due to pantry relocation, w/ technical infeasibility request; and 3) (e) elevator doors to remain, and unreasonable hardship request. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 14, 2026 | 353 Sacramento St 3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 5, 2026 | 353 Sacramento St 12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 17, 2026 | 353 Sacramento St Ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274 Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 14, 2026 | 353 Sacramento St 3rd/fl- structural permit submittal to reinforce 3rd floor slab Issued | Home remodel | Issued | Within 1 month | |
| Dec 22, 2025 | 353 Sacramento St 16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Dec 15, 2025 | 353 Sacramento St 2nd flr consist of interior demolition at non structural elements. construction of new partitions, doors, finishes, ceilings, lighting, millwork, plumbing fixtures. mep on separate permit. includes restroom ada upgrades. path of travel ref: 202511109274 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 21, 2025 | 706 Sansome St #0 2nd & 3rd fl: interior t.i. demo of non structural interior partitions, doors, ceiling finishes, mep. new partitions, doors, finihes, ceiling, mep. work also included ada restrooms upgrdes Issued | Commercial or tenant improvement | Issued | 9 months | |
| May 21, 2025 | 706 Sansome St #0 Basement & 1st/f: interior t.i. demo of non structural interior partitions, doors, ceiling finishes, mep. new partitions, doors, finihes, ceiling, mep. work also included ada restrooms upgrdes Issued | Commercial or tenant improvement | Issued | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Wesley Alan Herr? Request a correction.