Yoo Ju No
Architect · Space / Craft · Fremont
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34390First issued Aug 29, 2013, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 11 permits since 2016, 11 in the last 5 years. Latest filed Sep 3, 2026.
- What kind of projects?
- Home remodel 7 · Addition 2 · Commercial or tenant improvement 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 3,682 permits.
Where
- West of Twin Peaks3
- Sunset/Parkside1
- Chinatown1
- Pacific Heights1
Most recent
- 1867 25th AvReplace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existingApr 29, 2026Issued
- 818 Teresita BlRenovate the (e) bedroom and bathroom, add a mudroom in the (e) breezeway on the 1st fl. remove and convert the (e) court yard into an interior space, renovate kitchen on the 2nd fl. relocate laundry from 1st to 2nd fl by reconfiguring the layout on the 2nd fl.Dec 16, 2025Filed
- 133 Baden StAdd 1 bathroom in (e) storage space next to garage on 1st fl.Feb 1, 2021Complete
- 10 Miller Pl #1702#1702: repair/replace 3 windows & 2 patio doors with energy efficient windows & doors. not visible from street. replace kitchen cabinets & update appliances. remodel bathrooms. upgrade elec & plum. new light fixtures & finishes throughout.Dec 1, 2020Complete
- 2767 Clay StBathroom renovation on 3rd floor. reconfigure layout of plumbing fixtrues without increasing number of fixtures. no exterior work.Jan 27, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 3, 2026 | 5844 Geary Bl Tenant improvement for exercise studio. new gate, new window and entry door with ada powered opener, new ada compliant restroom wash station, janitor closet w/ washer/dryer, mop sink. new finishes and paint throughout. electrical deferred. electrical work requires electrical plans reviewed and appro Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 29, 2026 | 1867 25th Av Revision to pa # 202604290298 - remove rotten existing light well and rebuild rotten back deck in kind. change the layout in the bathroom that is already approved and is in scope of work and add a skylight on top of the shower. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 29, 2026 | 1867 25th Av Replace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existing Issued | Home remodel | Issued | Within 1 month | |
| Dec 16, 2025 | 818 Teresita Bl Renovate the (e) bedroom and bathroom, add a mudroom in the (e) breezeway on the 1st fl. remove and convert the (e) court yard into an interior space, renovate kitchen on the 2nd fl. relocate laundry from 1st to 2nd fl by reconfiguring the layout on the 2nd fl. Filed | Home remodelType unconfirmed | Filed | — | |
| Feb 13, 2025 | 22 Rico Wy Repair damaged front facade and repair rear patio door from water intrusion. replace windows, garage door, and stucco finish at the front facade, and replace (e) rear yard patio door with better waterproofing and energy efficiency windows and doors. add sconces for securit and planter boxes to... Withdrawn | Other | Withdrawn | — | |
| Jun 10, 2022 | 255 Chenery St Revision to 202204212679. hvac changed from forced air system to hydronic system, 2 interior (e) stairs will be replaced w/new code complaint stairs. (e) door from (e) stair #1 to the breezeway will be replaced w/ new door @ backyard. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 1, 2021 | 133 Baden St Add 1 bathroom in (e) storage space next to garage on 1st fl. Complete | Home remodel | Complete | 1 month | |
| Dec 1, 2020 | 10 Miller Pl #1702 #1702: repair/replace 3 windows & 2 patio doors with energy efficient windows & doors. not visible from street. replace kitchen cabinets & update appliances. remodel bathrooms. upgrade elec & plum. new light fixtures & finishes throughout. Complete | Home remodel | Complete | 3 months | |
| Jan 27, 2020 | 2767 Clay St Bathroom renovation on 3rd floor. reconfigure layout of plumbing fixtrues without increasing number of fixtures. no exterior work. Complete | Home remodel | Complete | Within 1 month | |
| Dec 24, 2019 | 722 Wisconsin St Add one car garage & two bike parking with a new curb cut. add a bedroom suite in the basement, extend(e) 1st & 2nd story to west & south, add 3rd story along with roofdecks. all stairs & guard rails will be replaced with code compliant.all failing foundations & retaining walls shall be replaced Withdrawn | Addition | Withdrawn | — | |
| Nov 20, 2019 | 346 San Benito Wy Replace (e) storage in the basement w/habitable space and relocate (e) bathroom. replace (e) stair w/(n) to be code compliant. remove (e) office and reconfigure (e) kitchen on 1st story. enlarge (e) half bathroom and reconfigure (e) full bath, update windows. Complete | Home remodel | Complete | 16 months | |
| Nov 13, 2019 | 264 Grand View Av Revision to pa 2019-0830-0306 & 2016-1219-5311 s1 convert crawl space into storage on 2nd story Cancelled | Revision or supplement | Cancelled | — | |
| Aug 30, 2019 | 264 Grand View Av Revision to 201612195311 foundation revision due to site conditions & shoring. remove walls at garage, convert part of the crawl space into storage space, add fire wall Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 26, 2019 | 264 Grand View Av Revision to 201612195311 replacement of damage/infested (e) framing & joists with in kind elements or sister (e) insufficient size framing & joists with sufficient size elements per structural drawings Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 30, 2019 | 1330 22nd Av Revision to pa #201808076622, relocate g/f bathroom. new front windows, replace plaster front of property. alum clad wood windows Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 29, 2018 | 320 Alabama St #3 Unit #3: kitchen renovation on 1st flr. maher na Complete | Home remodel | Complete | Within 1 month | |
| Dec 19, 2016 | 264 Grand View Av Add 1 2-car 2-bike garage. renovate (e)bsmt& 1st level fl&replace(e)attic space w/ 2/fl living sapce. replace (e)non-code compliant stairs w/ cope compliant stairs. replace failed retaining wall at back yard re-finish back yard peck w/ wood tiles. Complete | Addition | Complete | 22 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Yoo Ju No? Request a correction.