Zachary Lee Westling
Engineer · Wm Structural · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-6781First issued Dec 20, 2019, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2020, 12 in the last 5 years. Latest filed Jul 24, 2026.
- What kind of projects?
- Home remodel 6 · Addition 2 · Deck, stairs or patio cover 2
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,583 permits.
Where
- West of Twin Peaks2
- Noe Valley1
- Excelsior1
- Castro/Upper Market1
Most recent
- 30 Rockwood CtRenovation of (e) 2 story residence including reconfiguration of internal stair, addition full bath @ 2nd fl; convertion of 1st fl storage area into habitable space & laundry room; new wood deck @ existing rear yardDec 5, 2025Complete
- 1068 Noe StInterior remodel of a two unit building. all new exterior windows and doors will be energy-efficient models. some windows and doors locations will be modified. guards at bbalconies will be replaced.Aug 2, 2024Complete
- 125 Cerritos AvVoluntary strengthening @ garage.Nov 27, 2023Complete
- 620 La Grande AvNew wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front.Aug 20, 2021Issued
- 395 Collingwood StReplace 2 windows & add new windows as noted. reorginize 2/f layout, remove bay at kitchen and relocate (e) stair to 3/f. reorginize 3/f owners suite to include a closet and study.replace rear roof structure & deck. add 2 new dormers onthe rear facade.Feb 5, 2021Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 25, 2026 | 50 Capra Wy #0 Unit# 4 - revision to pa# 202604229909, no change to ext, relocate kitchen. move bedroom wall. install beam kitchen wall. add an office Issued | Revision or supplement | Issued | 1 month | |
| Jul 24, 2026 | 28 Raleigh St Shoring for addition foundation, ref bpa#202512182208 Issued | Retaining wall or site workType unconfirmed | Issued | Within 1 month | |
| Mar 13, 2026 | 2906 Cesar Chavez St Remove & replace (e) stair. replace w/new stair as per sec.1881.(a) and sec.188 Issued | Deck, stairs or patio cover | Issued | 1 month | |
| Feb 25, 2026 | 1658 23rd Av 1/f: enclose & remodel entry and staircase, add 1/2 bath. 2/f: remodel kitchen and relocate interior stair, relocate 1-bath, add 1-pantry, add 1-office. 3/f: relocate interior stair, add 1-bathroom, new horizontal addition with office, walk-in-close, and roof deck. Filed | Addition | Filed | — | |
| Dec 5, 2025 | 30 Rockwood Ct Renovation of (e) 2 story residence including reconfiguration of internal stair, addition full bath @ 2nd fl; convertion of 1st fl storage area into habitable space & laundry room; new wood deck @ existing rear yard Complete | Home remodel | Complete | 1 month | |
| Nov 13, 2025 | 2667 21st St New bathroom in garage and sesmic upgraded. Filed | Seismic retrofit or foundationType unconfirmed | Filed | — | |
| Aug 2, 2024 | 1068 Noe St Interior remodel of a two unit building. all new exterior windows and doors will be energy-efficient models. some windows and doors locations will be modified. guards at bbalconies will be replaced. Complete | Home remodel | Complete | 2 months | |
| May 9, 2024 | 395 Collingwood St Revision to permit 202111162548. remove (e) post and beam, replace with new built up beam at 3/f. add a beam at the roof. add support posts tracked down to foundation. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 30, 2024 | 2870 16th St Revision to pa# 202009214648, revise ceiling condition in the 3/f units 2878 & 2878a to retain the (e) dropped ceiling and attic space above-upgrade pg&e electrical meters closet on basement lvl. revise the basement flr plan for western units 1 & 3 to accommodate (e) foundation encroachment from the Filed | Revision or supplement | Filed | — | |
| Nov 27, 2023 | 125 Cerritos Av Voluntary strengthening @ garage. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| May 16, 2023 | 1220 Treat Av Convert unimproved space at g/l into living space included living rm w/ kitchenette, bedrooms, bathrooms, laundry rm, and new interior stair connecting to main fl above. (net new sf: 1280 sf) Complete | AdditionType unconfirmed | Complete | 8 months | |
| Dec 16, 2022 | 395 Collingwood St Expansion of roof volume within (e) atrium footprint, ref approved site pa# 201810304503-sr1. replace (e) glazed atrium @ 3rd floor with new sloped roof & glazing in (e) footprint. remopve (e) atrium slope & gable roof & replace with new sloped roof. Withdrawn | Revision or supplement | Withdrawn | — | |
| Dec 2, 2022 | 210 Frederick St Revision to pa#2022-0622-6802, structural changes resubmitting for exposure of existing framing. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 3, 2022 | 30 Blackstone Ct Deck rebuilt Filed | Deck, stairs or patio cover | Filed | — | |
| Aug 20, 2021 | 620 La Grande Av New wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front. Issued | Home remodel | Issued | 2 months | |
| Feb 5, 2021 | 395 Collingwood St Replace 2 windows & add new windows as noted. reorginize 2/f layout, remove bay at kitchen and relocate (e) stair to 3/f. reorginize 3/f owners suite to include a closet and study.replace rear roof structure & deck. add 2 new dormers onthe rear facade. Withdrawn | Home remodelType unconfirmed | Withdrawn | — | |
| Mar 3, 2020 | 1887 45th Av Remove wall and wight bearing post, replace door on west wall, restore ceiling and roof joists Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.