CheckMyDesigner

Selling or buying a house with unpermitted work in California (and San Francisco)

Last checked Nov 6, 2026

The short answer

  • You can sell or buy a house with unpermitted work in California, but the seller must disclose known unpermitted work in writing.
  • Selling “as-is” doesn’t remove that duty.
  • After closing, the buyer takes on any code violations that come with the house.
  • In San Francisco, the seller must give the buyer the city’s 3R Report, which lists the home’s building permits.
  • For your own sale or purchase, talk to a real estate attorney or your agent.

Yes, you can legally sell or buy a house with unpermitted work in California, provided the seller discloses every known unpermitted addition, structural modification, or alteration in writing on the statutory Real Estate Transfer Disclosure Statement (TDS) required by California Civil Code Section 1102 and Section 1102.6. Labeling a listing “as-is” does not waive the seller’s statutory duty to disclose known unpermitted work (Civil Code §1102.1(a)), and once escrow closes, the buyer inherits responsibility for any code violations on the property under San Francisco Building Code (SFBC) Section 102A.

In San Francisco, owners or realtors are legally required to give the buyer the city’s Report of Residential Building Record (3R Report). The report costs $379 from the Department of Building Inspection (DBI) and shows the building’s authorized use and its building permit history. It doesn’t include plumbing or electrical permits (SF.gov 3R Report page), so buyers often check DBI’s online permit history as well.

What California law requires sellers to disclose

Statewide, California Civil Code Section 1102 applies to the sale of single-family residential property, with a few exceptions. Under Civil Code Section 1102.6, the seller must fill out the Real Estate Transfer Disclosure Statement (TDS) and answer “Yes” or “No” to whether they are aware of specific conditions on the property, then explain every “Yes” answer in writing:

  • Question II.C.4: “Room additions, structural modifications, or other alterations or repairs made without necessary permits” (Civil Code §1102.6).
  • Question II.C.5: “Room additions, structural modifications, or other alterations or repairs not in compliance with building codes” (Civil Code §1102.6).
  • Question II.C.10: “Any zoning violations, nonconforming uses, violations of ‘setback’ requirements” (Civil Code §1102.6).
  • Question II.C.15: “Any notices of abatement or citations against the property” (Civil Code §1102.6).

Civil Code Section 1102.1(a) states that delivery of the TDS may not be waived in an “as is” sale. Under Civil Code Section 1102(c), any waiver of the disclosure requirements is void as against public policy. If a seller delivers the TDS or an amendment to it after the buyer signs an offer, Civil Code Section 1102.3 gives the buyer 3 days after personal delivery (or 5 days after delivery by mail or electronic delivery) to terminate the offer in writing.

This article explains what California statutes and San Francisco Building Code provisions say, not how they apply to your specific contract. Talk to a California real estate attorney or your real estate agent before making disclosure or contract decisions on a sale or purchase.

Your three options when selling a house with unpermitted work

If your San Francisco home has an unpermitted bathroom, kitchen remodel, deck, or ground-floor rooms, you have three practical paths before going on the market:

Three options for selling a San Francisco house with unpermitted work
OptionWhat you doAdvantagesTrade-offs and risks
1. Disclose in writing and sell as-isAnswer “Yes” on TDS Questions II.C.4 / II.C.5, describe the unpermitted work clearly, and provide the required 3R Report and any contractor invoices you have.No construction delay before listing; no need to open walls or pay DBI penalty fees unless there is an active Notice of Violation.Buyers and appraisers may discount unpermitted square footage or bedrooms; lenders may object if there is an open DBI Notice of Violation or unsafe condition.
2. Legalize the work with DBI before listingHire an architect, designer, or engineer to prepare as-built plans, pull a legalization permit from DBI, open walls for inspection as needed, pay applicable penalty and permit fees, and obtain a final inspection sign-off.The bedroom, bathroom, or ADU can be marketed and appraised as legal permitted space with a clean DBI record.Takes time and money. For work done without a permit, DBI charges nine times the permit issuance fee plus the original permit fee. You may be able to reduce these fees through an appeal to the Board of Appeals. Non-compliant work must be brought up to code.
3. Remove the unpermitted work and restore the spaceObtain a permit to demolish the unpermitted addition, wet bar, or partition and return the area to its last permitted configuration.Eliminates code-failing work (such as low-ceiling basement bedrooms or unvented bathrooms that cannot pass code) before buyers inspect.Still requires a permit and final inspection to remove the work, and you lose the extra fixture or room.

Sources: Civil Code §1102.6 · SF.gov · SF.gov · SF.gov NOV page

How retroactive permits and legalization work in San Francisco

If you decide to legalize unpermitted work before selling, or after buying, the San Francisco Department of Building Inspection treats the application as a permit to legalize existing construction:

  • Permit application and penalty fee: You submit a building permit application (and electrical or plumbing permits if wiring or pipes were added) stating that the scope is to legalize work built without a permit (SF.gov guide to fixing a building code violation). The penalty is nine times the permit issuance fee plus the original permit fee (SF.gov NOV information). If the fees are for unpermitted work, you may be able to reduce them by filing an appeal with the Board of Appeals (SF.gov guide to fixing a building code violation). If a previous owner did the work and you can document that, the Building Official may cut the investigation fee to two times the permit fee (SFBC Section 107A.5).
  • As-built drawings and stamps: Unless the work fits DBI’s short list of no-plans permits (SF.gov check if your permit needs plans), you need scaled plans showing the prior legal layout and the as-built layout. Under B&P Code §5537 and B&P Code §6737.1, an unlicensed building designer or licensed architect may draw conventional wood-frame work in a 1-to-4 unit building up to two stories plus a basement, while a licensed architect or engineer must sign and stamp any structural work that departs from conventional wood framing (B&P Code §5537(b)). See our guide on architect vs. building designer in California.
  • Legalizing an unpermitted in-law unit: For unauthorized dwelling units built before Jan 1, 2013, SFBC Section 106A.3.1.3 provides a voluntary legalization screening process that requires floor plans and a written assessment from a licensed contractor, architect, or engineer.

How buyers check for unpermitted work in San Francisco

If you are evaluating a San Francisco home before making an offer, cross-check four public records against the house in person:

  1. Read the 3R Report line by line: The seller must give you this report. It shows the building’s authorized use and its building permit history, but not plumbing or electrical permits (SF.gov 3R Report page). If the house has three full bathrooms today, check whether the 3R Report shows permits for adding them.
  2. Look up the address in DBI’s Permit and Complaint Tracking System: Use SF.gov’s building permit and complaint tracker to check every permit, electrical permit, plumbing permit, and complaint at the property address. Look at the status of each permit: an “Issued” or “Expired” permit without a “Completed” (final inspection) status means the work was never signed off by a DBI inspector.
  3. Compare the TDS against the home inspection report: Match the seller’s answers on TDS Questions II.C.4 and II.C.5 (Civil Code §1102.6) against your physical inspection report. Pay close attention to ground-floor ceiling heights, newly tiled bathrooms with no permit history, fresh drywall over garage framing, and removed walls between living and dining rooms.
  4. Check who designed any recent remodel: If the seller advertises a “permitted designer remodel,” pull the permit number on SF.gov’s permit tracker to see whether structural plans were stamped by a licensed architect or engineer or pulled as a surface-only OTC permit.

What happens if a seller hides known unpermitted work

Under California Civil Code Section 1102.13, no transfer of title is invalidated solely because a person failed to comply with the statutory disclosure article. However, any person who willfully or negligently violates or fails to perform any duty prescribed by Civil Code Section 1102 et seq. is liable in the amount of actual damages suffered by a transferee (Civil Code §1102.13).

Common questions

Can you sell a house with unpermitted work in California?

Yes. California law does not require you to legalize or tear out unpermitted work before selling a home, unless a local building department order requires immediate abatement. Instead, California Civil Code Section 1102 and Section 1102.6 require you to disclose any known unpermitted additions, structural modifications, or alterations in writing on the Transfer Disclosure Statement.

Does selling a house “as-is” excuse the seller from disclosing unpermitted work?

No. California Civil Code Section 1102.1(a) states that delivery of the Transfer Disclosure Statement may not be waived in an “as is” sale, and Section 1102(c) makes any waiver of the disclosure requirements void as against public policy. An “as-is” clause only means the seller is not agreeing to make repairs before closing.

If I buy a San Francisco house with unpermitted work, do I have to pay the 9x penalty?

If you apply for a permit to fix it, usually yes. DBI charges nine times the permit issuance fee plus the original permit fee for work done without a permit, and most of the time you pay it when DBI issues the permit to fix the violation (SF.gov NOV information). You may be able to reduce these fees by filing an appeal with the Board of Appeals (SF.gov guide to fixing a building code violation). Read our full guide on what happens when work is built without a permit in San Francisco.

What is a 3R Report in San Francisco real estate?

A 3R Report (Report of Residential Building Record) is an official city record issued by the San Francisco Department of Building Inspection for $379. It shows a residential building’s authorized use and its building permit history. It doesn’t include plumbing or electrical permits. When a home is sold, owners or realtors are legally required to give the buyer a 3R Report (SF.gov 3R Report page).

Hiring an architect or engineer to legalize work before or after a sale?

Before you sign a design contract, search any California-licensed architect or engineer by name or license number to check their license status, disciplinary history, and past San Francisco permits.

For example “Jordan Lee”, C-34567 or S 5123.

Sources

  1. California Civil Code §1102, §1102.1, §1102.3, §1102.6 & §1102.13 (Disclosures Upon Transfer of Residential Property), California Legislative Information. Read Nov 6, 2026.
  2. San Francisco Building Code Section 102A (Unsafe Buildings & Notices of Violation), American Legal Publishing / City and County of San Francisco. Read Nov 6, 2026.
  3. San Francisco Building Code Section 106A.3.1.3 (Legalization of Dwelling Units Installed Without a Permit), American Legal Publishing / City and County of San Francisco. Read Nov 6, 2026.
  4. Request a Report of Residential Building Record (3R report), City and County of San Francisco (SF.gov). Read Nov 6, 2026.
  5. Notice of Violation (NOV) Information, City and County of San Francisco (SF.gov). Read Nov 6, 2026.
  6. Track your building permit application (Permit and Complaint Tracking System), City and County of San Francisco (SF.gov). Read Nov 6, 2026.
  7. Fix your building and housing code violation, City and County of San Francisco (SF.gov). Read Nov 6, 2026.

This is general information, not legal advice.

More guides

All guides