Alan Charles Burr
Engineer · Murphy Burr Curry · Mill Valley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5062First issued Jan 26, 2007, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 39 permits since 2004, 39 in the last 5 years. Latest filed Oct 19, 2026.
- What kind of projects?
- Commercial or tenant improvement 12 · Seismic retrofit or foundation 7 · Home remodel 5
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 11,334 permits.
Where
- Financial District/South Beach6
- South of Market3
- Chinatown2
- Mission Bay1
Most recent
- 703 Market St11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered.Oct 30, 2025Complete
- 451 Pacific AvAddition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes.Jun 6, 2025Issued
- 420 Montgomery St2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of useSep 26, 2022Filed
- 633 Battery StInterior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room.Jul 13, 2022Complete
- 101 Henry Adams St3rd fl - new tenant suite second egress exit. (n) rated exit corridor, exit door and brick wall opening. this is not an accessible entrance, see accessible path of travel sheets included for reference onlyMay 25, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 19, 2026 | 1745 Pacific Av #0 Repair of rooftop architectural concrete balustrade (including top rail) of existing bldg. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| May 18, 2026 | 451 Pacific Av Revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab wood Issued | Revision or supplement | Issued | 4 months | |
| Oct 30, 2025 | 703 Market St 11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 6, 2025 | 451 Pacific Av Addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes. Issued | Commercial or tenant improvementType unconfirmed | Issued | 6 months | |
| Oct 8, 2024 | 649 Mission St Repair steel lintels at wll on minna st and general brick repairs. Complete | Home remodel | Complete | Within 1 month | |
| May 5, 2023 | 157 Shipley St Remove ~300 sf of t1-11 siding. remove (e) trim around doors & window. install 300 sf of 1/2 cdx plywood. install new weather barrier, new trim around (e) doors & windows. (n) hard plank siding on 1st, 2nd & 3rd fl. (e) deck guard rails will remain. Complete | Other | Complete | 2 months | |
| Apr 17, 2023 | 1801 25th St Revision to 202006108345-s1 per field conditions and soil improvements Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 14, 2023 | 1333 Page St Revision to 201606170215 structural changes to comply with 202173434, 202182490. structural renovations to the main seismic force resisting work previously permited under ab-017 as mandatory work .therenovation shown will make bldg comply with 2022 sfebc ch 5e. Complete | Revision or supplement | Complete | 5 months | |
| Feb 2, 2023 | 100 Vallejo St Revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement. Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 24, 2023 | 200 Rhode Island St Deferred friction piles for the main core + shell permit #201910023333 per approved structural drawings, the drilled piers replace micropiles per contractor's option Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jan 12, 2023 | 333 Market St Roof: 1 new back-up condenser water pump is being added. Complete | Other | Complete | 3 months | |
| Nov 18, 2022 | 115 Red Rock Wy Remove and replace gazebo and decking like for like. remove and replace framing and decking like for like. remove and replace railing like for like. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Nov 16, 2022 | 244 Hartford St Revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 27, 2022 | 1907 Leavenworth St #1 Voluntary strengthening of the foundation level of the subject property. Complete | Seismic retrofit or foundation | Complete | 7 months | |
| Sep 26, 2022 | 420 Montgomery St 2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of use Filed | Commercial or tenant improvement | Filed | — | |
| Jul 13, 2022 | 633 Battery St Interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 24, 2022 | 464 California St #0 Repair/replace sidewalk topping slab, 2 new curb ramps. Cancelled | Retaining wall or site work | Cancelled | — | |
| Jun 9, 2022 | 15 Noe St #0 Soft story upgrade per chapter 4d. design criteria from cebs appendix chapter a4. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| May 25, 2022 | 101 Henry Adams St 3rd fl - new tenant suite second egress exit. (n) rated exit corridor, exit door and brick wall opening. this is not an accessible entrance, see accessible path of travel sheets included for reference only Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 7, 2022 | 180 Townsend St Submitting deferred structural drawing per 202101152837, a1.01d. Complete | Revision or supplement | Complete | 4 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Alan Charles Burr? Request a correction.