Alex Filatov
Engineer · Murphy Burr Curry Inc. · San Rafael
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-65023First issued Jan 23, 2003, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 32 permits since 2008, 32 in the last 5 years. Latest filed Oct 1, 2026.
- What kind of projects?
- New building 9 · Commercial or tenant improvement 9 · Other 4
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
New building: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 1 issued permit filed since 1966; 8 still in review.
Where
- Inner Sunset8
- Marina1
Most recent
- 599 Crestmont DrBuilding 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Dec 23, 2019Filed
- 599 Crestmont DrBuilding 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Dec 23, 2019Filed
- 599 Crestmont DrBuilding 7 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Dec 23, 2019Filed
- 599 Crestmont DrBuilding 8 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Dec 23, 2019Filed
- 599 Crestmont DrBuilding 9 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Dec 23, 2019Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 1, 2026 | 500 Washington St 1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred Filed | Commercial or tenant improvement | Filed | — | |
| Aug 4, 2026 | 180 Howard St 9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531 Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 10, 2026 | 101 California St 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 4, 2025 | 1 California St Ground fl - commercial partial interior ti of building lobby. non-structural partitions, doords/frames, ceiling, finishes and millwork. partial exterior refront alteration repairs. mep deferred Filed | Commercial or tenant improvement | Filed | — | |
| Aug 12, 2025 | 100 California St Revision to pa#: 202411215476. revise infill assembly in type 1 building. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 5, 2025 | 100 California St 9th fl: ti includes 6 phone booths w/ structural calcs for anchoring. (bldg is fully sprinklered) Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Aug 8, 2024 | 1 California St Ground floor: removal of non bearing concrete walls at vault. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 29, 2022 | 1025 Masonic Av New slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg. Expired | Deck, stairs or patio cover | Expired | 8 months | |
| Dec 23, 2022 | 1639 Oak St Scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planter Complete | Deck, stairs or patio cover | Complete | 9 months | |
| Nov 18, 2022 | 1011 Bryant St #0 Deferred structural 202206297373 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Oct 28, 2022 | 625 Market St Install (8) davits at top of building for window washing Cancelled | Deck, stairs or patio coverType unconfirmed | Cancelled | — | |
| Jun 29, 2022 | 1011 Bryant St #0 Exterio alterations including (n) rolling over head door; acm cladding interior alterations in customer areas, including tenant improvements in showroom, sales office customer lounge area and public restrooms. minor interior alterations in employee and back of house areas. primarily comprising repla Complete | Commercial or tenant improvement | Complete | 5 months | |
| Feb 7, 2022 | 301 Battery St Floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area. Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Aug 26, 2021 | 2121 Sacramento St #0 To comply with nov 202178979 replacement/repair 10 feet of structural steel at west parapet wall. remove bricks expose steel. replace damaged steel, re-install bricks; replace loose brick, install helical anchors Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jul 29, 2021 | 1139 Howard St Parapet concrete repair approx 60'x18"x6" corner wall concrete repair approx 20'x12"x4" deep. remove damaged omcrete. install rebar epoxy. form & pour new concrete. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Nov 13, 2020 | 797 Corbett Av #0 Rev to pa201909121438, to comply with nov201972841: replace wealkway deck to plans, repair any damagaed rot, wire, paper, stucco. Complete | Revision or supplement | Complete | 8 months | |
| Sep 19, 2020 | 3 Embarcadero Center Slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit. Issued | Home remodel | Issued | 9 months | |
| Sep 19, 2020 | 3 Embarcadero Center Structural work for slab reinforcement on the 19 & 22nd fl. Issued | Home remodel | Issued | 5 months | |
| Dec 23, 2019 | 599 Crestmont Dr Building 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement. Filed | New building | Filed | — | |
| Dec 23, 2019 | 599 Crestmont Dr Building 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement. Filed | New building | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Alex Filatov? Request a correction.