Anne Clark Forell
Architect · Anne Forell Architecture · Tiburon
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-27146First issued Oct 28, 1997, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 48 permits since 2004, 48 in the last 5 years. Latest filed Dec 11, 2025.
- What kind of projects?
- Home remodel 21 · Addition 10 · Other 8
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 21 permits in San Francisco
Time to get a permit
Median from filing to permit, from 21 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 15,393 permits.
Where
- Noe Valley6
- West of Twin Peaks3
- North Beach2
- Pacific Heights2
Most recent
- 338 28th St #2Unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Dec 11, 2025Complete
- 255 Westgate DrConversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft.Apr 21, 2025Complete
- 130 Belgrave AvRemodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker massMar 20, 2025Complete
- 1011 Church StKitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbingMar 20, 2025Complete
- 1749 Sanchez StRemodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405Dec 3, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 11, 2025 | 338 28th St #2 Unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Oct 31, 2025 | 647 19th Av Horizontal addition w/new rooms down to convert e) 3 bedroom, 1 bath house to a 4 bedroom & 3 bath house plus media rm. extending e) residence in 1=story addition into rear yard, infill north lightwell on upper level, partial infill lightwell on south side, both within neighbor approval. Issued | Addition | Issued | 5 months | |
| Apr 21, 2025 | 255 Westgate Dr Conversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft. Complete | Home remodel | Complete | Within 1 month | |
| Mar 20, 2025 | 130 Belgrave Av Remodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker mass Complete | Home remodel | Complete | Within 1 month | |
| Mar 20, 2025 | 1011 Church St Kitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbing Complete | Home remodel | Complete | Within 1 month | |
| Dec 3, 2024 | 1749 Sanchez St Remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405 Complete | Home remodel | Complete | Within 1 month | |
| Feb 7, 2024 | 156 Onondaga Av Removal of existing garage door and installation of new garage door to flush with building face (no increase of habitable space) provide 5/8" drywall on garage ceiling provide 100 square inches of ventilation at garage door verify 20 minute rated door with closer and smoke seal to living area Issued | Other | Issued | Within 1 month | |
| Dec 19, 2022 | 1370 Portola Dr Int remodel & rooms down into (e) storage. includes remodel of kitchen living area & conversion of storage space below living area to provide new family rm, bedrm & (2) bathrooms. includes relocation of some int partitions & modification to (e) stairs. changes to several rear window @ lower addition Complete | Home remodel | Complete | Within 1 month | |
| Nov 4, 2021 | 34 Castle St Garage repairs and improvement. replacement of 2 hot water heater, furnace in new location. replacement of concrete slab floor. installation of surface drainage channel for water seepage. new sheetrock, installation and painting thru. elec, ltg improvements. Complete | Home remodel | Complete | Within 1 month | |
| Apr 14, 2021 | 235 28th St 3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office. Complete | Addition | Complete | 26 months | |
| Mar 5, 2021 | 350 Claremont Bl Remodel of 2 6'x8' doors at rear of house at kitchen. new window in (e) opening and new multislide door in enlarged opening. new overhang. no change to bulk or mass. Complete | Other | Complete | 1 month | |
| Jun 25, 2020 | 147 29th St Final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard. Complete | Revision or supplement | Complete | 2 months | |
| Feb 21, 2020 | 2504 Pacific Av Interior remodel - renovation of ground fl rooms including expansion of garage & remodel of (e) bathroom, laundry & family room. replacement windows in (e) openings & 2 (n) windows in rear yard Complete | Home remodel | Complete | Within 1 month | |
| Feb 19, 2020 | 80 28th St Revision to pa 2019-1125-8152 rooms down addition to unit 80 (2nd fl) in rear of (e) garage. comprisinsg of addition of 510 sf under (e) volume. replacement of 2 exterior windows into rear yard in (n) openings. new wood sashes in (e) windows, related electrical & mechanical Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 4, 2019 | 410 29th St Remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows. Complete | Home remodel | Complete | Within 1 month | |
| Sep 20, 2018 | 337 Teresita Bl Remodel to extg residential. addition of new bedroom in crawl space under house addition of powder room on main floor, addition of bathroom on 3rd floor. new deck in rear yard, new bay projection in rear yard. remodel of other spaces and window modification per scope. Complete | Addition | Complete | Within 1 month | |
| Sep 20, 2018 | 139 Brompton Av Interior remodel of 2 bathrooms. relocation of laundry facilities. other cosmetic interior changes. replacement of exterior windows in front and rear of residence. Complete | Home remodel | Complete | 7 months | |
| Jun 12, 2017 | 4225 23rd St Add window @ ground level Complete | Other | Complete | Within 1 month | |
| Mar 15, 2017 | 147 29th St Vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floor Complete | Addition | Complete | 14 months | |
| Feb 27, 2017 | 3922 22nd St Replace existing sliding glass door and add two (2) new windows at rear of building, not visable from street. n/a ordinance #155-13 Complete | Other | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Anne Clark Forell? Request a correction.