Brandon D Marshall
Architect · Fog Studio · Benicia
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33665First issued Jun 7, 2012, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 17 permits since 2015, 17 in the last 5 years. Latest filed Oct 28, 2026.
- What kind of projects?
- Home remodel 4 · Addition 4 · Commercial or tenant improvement 4
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Mission1
- Castro/Upper Market1
- Noe Valley1
- Sunset/Parkside1
Most recent
- 3577 17th StKitchen remodel of upper unit including removal of (e) interior partitions, (n) engineering beam support roof rafters, replace gas wall heater w/central furnance incl dropped ceiling to route ducting, replace water heater w/gas hwh. upgrade (e) sub panel, new skylights, replace (e) plumbing fixtureOct 28, 2026Filed
- 4145 20th St #0Unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area.Sep 19, 2023Issued
- 97 Amber DrInterior remodel to convert unconditioned 1st flr to office, media room & bathroom. (n) windows & doors to replace (e) in-kind throughout. kitchen remodel, bath remodels at 2nd flr, skylights, electr & plumb, structural work for new areas.Oct 1, 2020Complete
- 2378 36th AvRenovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom.Jul 17, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 28, 2026 | 3577 17th St Kitchen remodel of upper unit including removal of (e) interior partitions, (n) engineering beam support roof rafters, replace gas wall heater w/central furnance incl dropped ceiling to route ducting, replace water heater w/gas hwh. upgrade (e) sub panel, new skylights, replace (e) plumbing fixture Filed | Home remodel | Filed | — | |
| Sep 19, 2023 | 4145 20th St #0 Unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area. Issued | Home remodelType unconfirmed | Issued | 2 months | |
| Sep 8, 2023 | 4145 20th St G/f: new window on north (front) facade. Expired | Other | Expired | Within 1 month | |
| Aug 23, 2023 | 4145 20th St #0 1st fl bedroom addition & sitting area on ground fl within (e) envelope for unit 4145 20th st. 2nd fl bathroom addition, renovation of bedroom at 4145 20th st. eletrical & plumbing as req Issued | Addition | Issued | Within 1 month | |
| Jul 28, 2023 | 962 Key Av Rear 3-story addition to (e) 2-story home including removal of previous addition, kitchen remodel, (n) deck & main & upper levels & access stair to rear yard. Issued | Addition | Issued | 27 months | |
| Dec 2, 2021 | 2612 Ocean Av T.i. : new carpet, casework, grab bars, tile, countertops. t.i. existing bathroom mech to remain. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 7, 2020 | 1 Quartz Wy Remove (e) brick fence and retaining wall and patio. build (n) concrete patio and retaining wall with wood and steel fence Issued | Retaining wall or site work | Issued | 6 months | |
| Oct 6, 2020 | 719 Faxon Av Revision to permit # 2017-1220-6995. to move proposed rear door at den, to be removed Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 1, 2020 | 97 Amber Dr Interior remodel to convert unconditioned 1st flr to office, media room & bathroom. (n) windows & doors to replace (e) in-kind throughout. kitchen remodel, bath remodels at 2nd flr, skylights, electr & plumb, structural work for new areas. Complete | Home remodel | Complete | 2 months | |
| Sep 17, 2020 | 3071 Harrison St To comply with nov # 202030329; 80 sq ft deck at 2nd story Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Dec 4, 2019 | 29 Caselli Av Replace (e) rear stair w/ wood-framed stair, modify wdw size to accomodate stair landing. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Nov 15, 2019 | 234 Lisbon St Rev to pa:201802090957: 1/f: provide separate heating system *ductelss), revise bathroom grade - no excavation, add w/d in approved bathroom, take out job in wall. Complete | Revision or supplement | Complete | 4 months | |
| Jul 17, 2019 | 2378 36th Av Renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom. Complete | Home remodel | Complete | Within 1 month | |
| Apr 29, 2019 | 206 Lisbon St Revision to 201808248283, revised deck elevation <30" and remove fire walls on existing permit 201808278283 Complete | Revision or supplement | Complete | Within 1 month | |
| May 18, 2018 | 1175 Howard St Interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Feb 9, 2018 | 234 Lisbon St Renovation of (e) portion of garage to add accessory dwelling unit of 497 sf, including kitchen & bath per ordinance 95-17. Complete | ADU | Complete | 13 months | |
| Dec 20, 2017 | 719 Faxon Av Two-story 644 sf addition, new stair, kitchen & bath remodel. Complete | Addition | Complete | 9 months | |
| Feb 8, 2017 | 992 Valencia St Renovation of e restrooms to ada compliance, new power door operator at entry(signage) Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 22, 2015 | 2477 Lombard St Change of occupancy from r-3 to r-2. (n) ground floor 3-bedroom additional dwelling unit within (e) envelope part of soft story program ord 30-15 seismic permit 201511243532. 1342 sq ft renovation, 2-bath, 3-bedroom Complete | Commercial or tenant improvement | Complete | 9 months | |
| Mar 6, 2015 | 1970 32nd Av Horizontal addition to rear yard, 474 sf total. 1-story with deck (n) over 1st floor. adding 1 bedroom, 1 bath. Complete | Addition | Complete | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Brandon D Marshall? Request a correction.