Brendan Forslund Beazley
Engineer · Jon Brody Structural Engineers · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5660First issued Jan 31, 2012, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2021, 19 in the last 5 years. Latest filed Dec 22, 2025.
- What kind of projects?
- Addition 5 · Home remodel 3 · New building 3
- How long do their permits take?
- Addition: 8 months. City typical for the same review: 7 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 11,564 permits.
Where
- Noe Valley2
- West of Twin Peaks1
- Presidio Heights1
- Potrero Hill1
Most recent
- 4331 23rd StEnclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deckDec 22, 2025Issued
- 225 Maywood DrVertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office.Oct 18, 2022Complete
- 674 29th StRebuild rear sun room in-kind. remove (e) exterior stair. remodel (e) kitchen and bath. relocate two bathrooms. add (n) interior stair. remodel part of (e) storage into a sitting room.Feb 11, 2022Complete
- 3710 Clay StConvert of (e) attic to habirable space; addition of new staircase connecting (e) 2nd fl and (e) attic; addition of (3) dormoers, skylights and window @ (e) mamsard roof; (2) new bedrooms & (1) new bathroom.Jan 4, 2022Expired
- 744 Rhode Island StAdd a 3rd fl w/ roof deck. upgrade all structure & foundation to meet/ exceed current code. complete partially excavated 1st fl basement/garage. upgrade m.e.p. to code. increase permeable area of sidewalk. increase area of solar panels & add gray water system. install sprinkler system per nfpa13r.Nov 29, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 5, 2026 | 196 Liberty St Revision to 202509054679, 202505297476, 202503252971, 202407166590. omiting 3rd floor wet bar, 3rd floor powder room to full bath & ground floor electrical work. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 3, 2026 | 4331 23rd St Revision to bpa: 202512222388 - updated master bath layout, elimination of transom window above door at west elevation, change from sliding window to sliding door at south elevation and sistering of (e) brick foundation with new concrete footing at property line shear walls an on gl5 Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 22, 2025 | 4331 23rd St Enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deck Issued | AdditionType unconfirmed | Issued | Within 1 month | |
| Sep 5, 2025 | 196 Liberty St (n) soldier pile (retaining) wall at rear yard. existing wall to remain. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Aug 14, 2025 | 540 Mission Bay Blvd North Bl Addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openings Complete | Commercial or tenant improvementType unconfirmed | Complete | 2 months | |
| Aug 12, 2025 | 346 El Camino Del Mar Voluntary strengthening of (e) crawl space cripple walls. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| May 29, 2025 | 196 Liberty St Rev pa202407166590-s1 & pa# 202503252971 for revisied structural design and details. Complete | Revision or supplement | Complete | 3 months | |
| Feb 25, 2025 | 401 Hunters Point Bl Proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc. Approved | New building | Approved | — | |
| Oct 9, 2024 | 228 Winfield St To comply with nov 202422925 adding shed dormer to 3rd fl bedroom, existing bathroom, no electrical work proposed. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jul 25, 2024 | 196 Liberty St Alter site permit. revision to pa # 202302162120: previously proposed rear deck has been removed and new wood steps and landing to rear yard is proposed in the revised set. Expired | Revision or supplement | Expired | 1 month | |
| May 29, 2024 | 3710 Clay St Revision to pa# 2022-0104-5359 structural changes at roof. reduced skylight sizes. foundation changes at line d. stair revision between 2nd floor & attic. Complete | Revision or supplement | Complete | 10 months | |
| Mar 20, 2024 | 171 Sussex St Replace rear facade windows and doors, basement level thru 3rd fl. remove and replace (e) rear yard deck at 2nd & 3rd floors, remove and replace rear facade exterior finish Complete | Other | Complete | Within 1 month | |
| Oct 25, 2023 | 401 Hunters Point Bl Proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge. Approved | Retaining wall or site work | Approved | — | |
| Oct 25, 2023 | 401 Hunters Point Bl Proj-25-0614:erect a one story public restroom. type vb. Approved | New building | Approved | — | |
| Oct 25, 2023 | 401 Hunters Point Bl Proj-25-0614:erect a one story storage and recreation building (boat house)- type vb. Approved | New building | Approved | — | |
| Aug 10, 2023 | 7070 California St Remove and replace fence and benches from chanlink to wood new concrete Complete | Deck, stairs or patio cover | Complete | 9 months | |
| Dec 6, 2022 | 225 A Maywood Dr New adu attached to the existing residence. vertical addition under pa# 202210184534. Complete | ADU | Complete | 8 months | |
| Oct 18, 2022 | 225 Maywood Dr Vertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office. Complete | Addition | Complete | 11 months | |
| May 24, 2022 | 636 Shrader St Modify existing interior window wall, including new structural moment frame. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| May 19, 2022 | 864 Florida St Residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Brendan Forslund Beazley? Request a correction.