Craig E Steely
Architect · Craig Steely Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-26737First issued Feb 5, 1997, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 26 permits since 2003, 26 in the last 5 years. Latest filed May 21, 2025.
- What kind of projects?
- Home remodel 10 · Addition 6 · New building 5
- How long do their permits take?
- New building: 18 months. City typical for the same review: 5 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966.
Where
- Castro/Upper Market4
- Noe Valley2
- Russian Hill2
- Potrero Hill1
Most recent
- 779 Duncan StRemodel (e) kitchen, 1 bathroom, add 1 powder room & skylight @ 2nd floor. enlarge/excavate entry, bath & storage area to achieve 8'-0" ceiling height, add one bathroom, wine room, add new sliding glass doors & windows, remodel laundry/storage area @ 1st floor.May 18, 2017Complete
- 1000 North Point St #807Unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural.Feb 4, 2013Complete
- 975 14th StNew upper & lower deck. parcial height wall removed. washer, dryer relocated. new door & window.Aug 26, 2011Complete
- 918 Kansas StInterior remodel, new kitchen cabinets, appliances, new conversation pit, new rear/side glass doors & windows, new guardrail @ (e) rear deck, new skylight.Dec 15, 2010Complete
- 3794 16th StRepair dry rot @ garage / basement @ rear of garage. approx 80 sq.ft. repair in kind. no doundation work.Sep 8, 2008Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 21, 2025 | 249 Mississippi St Erect a four-story, type 5, residential building with two units. Issued | New building | Issued | 8 months | |
| May 19, 2025 | 249 Mississippi St Demolish a two-story, type 5, single family building. Issued | Other | Issued | 8 months | |
| Sep 13, 2023 | 609 Moultrie St Revision to pa# 201709056831, eliminate basement from permit. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 1, 2020 | 76 Montcalm St Revision to pa# 201411141573. reduced scope of work: reduce proposed floor area (1912sf to 1709sf). eliminate approved 11.5"lx9.5"wx9.5"h horizontal addition at 3rd fl. revise window sizes & adjust floor plan. (relocate stairways & 3rd fl bathroom) to accomodate decreased area. Complete | Revision or supplement | Complete | 5 months | |
| Nov 7, 2017 | 779 Duncan St Revision to pa 2017-0518-6939 reduced structural & architectural scope - remove 1st floor bathroom and other conditioned space from original scope Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 5, 2017 | 609 Moultrie St To erect a three story type v-b single family dwelling w/ one basement. Complete | New building | Complete | 27 months | |
| Jul 12, 2017 | 779 Duncan St Add clearstory to roof. revision to pa# 2017-1107-3412. Complete | Revision or supplement | Complete | 6 months | |
| May 18, 2017 | 779 Duncan St Remodel (e) kitchen, 1 bathroom, add 1 powder room & skylight @ 2nd floor. enlarge/excavate entry, bath & storage area to achieve 8'-0" ceiling height, add one bathroom, wine room, add new sliding glass doors & windows, remodel laundry/storage area @ 1st floor. Complete | Home remodel | Complete | Within 1 month | |
| Nov 14, 2014 | 76 Montcalm St Horizontal addition, interior remodel kitchen & living room, relocate 1st & 3rd fl bathrooms, interior stairway at 1st/2nd fl & new roof deck and closet at 3rd fl. new rear yard deck & steps at 1st fl. Complete | Addition | Complete | 12 months | |
| Mar 21, 2014 | 222 Faxon Av New 2 story horizontal rear addition with new bedroom & 2 new bathrooms. new roof deck, interior stair. remodeled kitchen. Complete | Addition | Complete | 11 months | |
| Jun 27, 2013 | 174 Valencia St Change of use . interior tenant improvement, new store front assembly. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Feb 4, 2013 | 1000 North Point St #807 Unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural. Complete | Home remodel | Complete | Within 1 month | |
| May 15, 2012 | 32 Ellert St Rebuild front entry stair in kind. partiall enclose (e) front porch. new front door, windows at (e) living room. replace (e) windows in kind with wood windows at bedroom 1 & mech/sorage @ basement. replace stucco at front facade w/partial wood siding. new wood fence & pedestrian gat at front. replac Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Apr 10, 2012 | 4001 20th St Revision to premit #2009-1014-8947 revise structural framing remove glass floor @ lr and mstr br add hot tub at front yard. (n) access door to crawl to space @ stairway. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 17, 2012 | 35 Lexington St Create a 620 sq ft 3rd unit at 1st floor inclusive of a 1 story addition of 130 sq ft with roof deck for the (e) 2nd unit. repair to 50% or less of rear stair with extended stair landing on 3rd floor. Complete | AdditionType unconfirmed | Complete | 16 months | |
| Aug 26, 2011 | 975 14th St New upper & lower deck. parcial height wall removed. washer, dryer relocated. new door & window. Complete | Home remodelType unconfirmed | Complete | 5 months | |
| Jun 10, 2011 | 918 Kansas St Revision to pa# 2010.12.15.6735. new video screen at living rm, remodel (e) master bathroom, new skylight, new windows, revise struc, add sink/toilet to (e) laundry rm. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 15, 2010 | 918 Kansas St Interior remodel, new kitchen cabinets, appliances, new conversation pit, new rear/side glass doors & windows, new guardrail @ (e) rear deck, new skylight. Complete | Home remodel | Complete | Within 1 month | |
| May 11, 2010 | 706 Sanchez St Shoring for new construction next door at 4001 20th st app, ref app 200910148947 Complete | Retaining wall or site work | Complete | 6 months | |
| Oct 14, 2009 | 4001 20th St To erect 3 stories single family dwelling unit. Complete | New building | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Craig E Steely? Request a correction.