Dane William Bunton
Architect · Bunton Mousavi Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36022First issued Oct 10, 2016, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 47 permits since 2018, 47 in the last 5 years. Latest filed Sep 18, 2026.
- What kind of projects?
- Commercial or tenant improvement 28 · Home remodel 4 · Legalize or fix a violation 4
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 28 permits in San Francisco
Time to get a permit
Median from filing to permit, from 24 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 25,225 permits.
Where
- Mission7
- Financial District/South Beach5
- South of Market3
- Sunset/Parkside2
Most recent
- 2175 03rd St#1c: renovation of an (e) shell space into a medical and cosmetic skin outpatient treatment facility. including: (n) interior walls, (n) dropped ceilings, (n) mep infraucture & construction of (n) specialized treatment rooms including injector, laser, aesthetician, and consultation spaces,Sep 18, 2026Issued
- 1801 Haight StObtain a place or assembly permit for existing restaurant cha cha cha located at 1801 haight st. scope is limited to a change of use from a-3 to a-2 with no change in occupany load and no physical alterations to the e building.Jul 27, 2026Issued
- 420 Folsom StInterior remodel to instal a3 fitness studio(trufusion) to accomodate a new spa center for ska thermal spa. (e) juice bar on ground floor to remain, now to serve alchol cosmetic remodel for basement level including (n) millwork, wall & ceiling finishes (n) plumbing, pools in (e) basement level floorJul 9, 2026Issued
- 420 Folsom StAb17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums.Jun 5, 2026Issued
- 66 Kearny StProject consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.Nov 26, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 18, 2026 | 2175 03rd St #1c: renovation of an (e) shell space into a medical and cosmetic skin outpatient treatment facility. including: (n) interior walls, (n) dropped ceilings, (n) mep infraucture & construction of (n) specialized treatment rooms including injector, laser, aesthetician, and consultation spaces, Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 27, 2026 | 1801 Haight St Obtain a place or assembly permit for existing restaurant cha cha cha located at 1801 haight st. scope is limited to a change of use from a-3 to a-2 with no change in occupany load and no physical alterations to the e building. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Jul 9, 2026 | 420 Folsom St Interior remodel to instal a3 fitness studio(trufusion) to accomodate a new spa center for ska thermal spa. (e) juice bar on ground floor to remain, now to serve alchol cosmetic remodel for basement level including (n) millwork, wall & ceiling finishes (n) plumbing, pools in (e) basement level floor Issued | Commercial or tenant improvement | Issued | 4 months | |
| Jun 5, 2026 | 420 Folsom St Ab17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums. Issued | Commercial or tenant improvement | Issued | 3 months | |
| May 29, 2026 | 2932 21st St Interior remodel to the front apt units. Issued | Home remodel | Issued | Within 1 month | |
| Apr 15, 2026 | 1010 16th St Revision to 202510147334, revise tbar ceiling panel to include a metal/wire mesh ceiling (non-flammable) instead of burlap fabric. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 27, 2026 | 66 Kearny St Revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 6, 2026 | 66 Kearny St Revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours." Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 9, 2026 | 114 Precita Av Renewal of permit#: 201904238662 and 201909242573. Filed | Revision or supplement | Filed | — | |
| Nov 26, 2025 | 66 Kearny St Project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Oct 14, 2025 | 1010 16th St Interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Aug 20, 2025 | 3821 Noriega St Change of use and occupancy from m to b. interior remodel to existing +/- 2000 sf market to accomodate a bar and restaurant. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jun 30, 2025 | 447 Broadway #0 Change of use from nightclub to retail, change of occupancy from a2 to m. minor interior changes including adding grab bars to restroom. Issued | Commercial or tenant improvement | Issued | 10 months | |
| May 5, 2025 | 1100 El Camino Del Mar Concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plaza Issued | Retaining wall or site workType unconfirmed | Issued | 4 months | |
| Feb 28, 2025 | 1264 Folsom St Revision to pa# 202404301096, minor structural framing changes and electrical. Complete | Revision or supplement | Complete | 1 month | |
| Feb 11, 2025 | 1365 Fillmore St Minor interior improvement: equipment and customer area counter modifications add (2) hand sinks, modify restroom door, modify finishes and cove base Filed | Commercial or tenant improvement | Filed | — | |
| Nov 20, 2024 | 261 06th St Project consists of information required to change the use and occupancy of an existing warehouse space to a retail use for 415 e-bikes. construction consists entirely of door removal. Filed | Commercial or tenant improvement | Filed | — | |
| Nov 19, 2024 | 1801 Haight St Comply w/ nov #202545569: place of assembly permit to existing restaurant. change occupancy group from a-3 to a-2. construction of new , raised & uncovered outdoor dining area in the (e) parking lot. addition of (n) tactile restroom & egress signage. Filed | Legalize or fix a violation | Filed | — | |
| Oct 3, 2024 | 317 Cortland Av Rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel. Complete | Revision or supplement | Complete | 1 month | |
| Aug 16, 2024 | 657 Howard St Revision to pa# 2023-1212-2341 change in occupancy of flex & lounge spaces. assembly permit Filed | Revision or supplement | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Dane William Bunton? Request a correction.