Emily Guglielmo
Engineer · Martin / Martin, Inc. · San Rafael
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5902First issued Jun 17, 2013, expires Sep 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2014, 19 in the last 5 years. Latest filed Oct 27, 2026.
- What kind of projects?
- Commercial or tenant improvement 14 · Deck, stairs or patio cover 3 · Home remodel 2
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 14 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 12,206 permits.
Where
- Financial District/South Beach4
- Inner Sunset3
- Mission2
- Lakeshore1
Most recent
- 3251 20th AvSpace 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred.Apr 8, 2025Complete
- 3838 California StRenovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.Mar 10, 2025Complete
- 1635 Divisadero St5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd flDec 22, 2022Complete
- 5 Embarcadero CenterAddition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsMay 27, 2022Filed
- 299 02nd St #0Expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.Apr 8, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 27, 2026 | 1065 Sutter St Ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed Filed | Home remodel | Filed | — | |
| May 6, 2026 | 2 Mint Pz Revision to 202304075302. due to findings in field condition, some of fall protection has changed. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 10, 2026 | 563 Guerrero St Revision to pa# 202504083978. revised structural drawings as follows: s2.0 foundation update; s2.1-s2.2 shearwall layout and framing update; s3.0-s3.1 details update; s4.1-s4.4 details update Issued | Revision or supplement | Issued | 3 months | |
| May 5, 2025 | 563 Guerrero St Interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights. Issued | Home remodel | Issued | 6 months | |
| Apr 8, 2025 | 3251 20th Av Space 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Mar 10, 2025 | 3838 California St Renovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Aug 17, 2023 | 1525 Howard St Revision to pa#202305117612 to enlarge service writers room. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 27, 2023 | 6 Mint Pz New permanent guardrails at (e) gym roof and and elev/stair roof. relocation of permanant guardrail at main roof. new permanant ladders to access gym roof and elev/stair roof. new davit bases at main roof. specification of portable outtrigger. spec of davit arm/mast assemblies. Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Apr 7, 2023 | 2 Mint Pz Installation of new facade access fall protection system. new permanent guardrails at lowever roof. Issued | Deck, stairs or patio coverType unconfirmed | Issued | 34 months | |
| Dec 22, 2022 | 1635 Divisadero St 5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl Complete | Commercial or tenant improvementType unconfirmed | Complete | 10 months | |
| May 27, 2022 | 5 Embarcadero Center Addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows Filed | Commercial or tenant improvement | Filed | — | |
| Apr 8, 2022 | 299 02nd St #0 Expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Jan 26, 2022 | 280 South Van Ness Av Non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area. Complete | Commercial or tenant improvement | Complete | 8 months | |
| Jan 6, 2022 | 1525 Howard St Partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a. Issued | Commercial or tenant improvement | Issued | 12 months | |
| Sep 14, 2021 | 1428 Irving St Revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 20, 2021 | 1434 Irving St Ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st) Complete | Commercial or tenant improvement | Complete | 1 month | |
| Aug 20, 2021 | 1428 Irving St Ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st) Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jan 27, 2021 | 1434 Irving St Ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Dec 3, 2020 | 5 Embarcadero Center Enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path. Complete | Commercial or tenant improvementType unconfirmed | Complete | 15 months | |
| Jul 1, 2020 | 222 Sansome St #0 New livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting. Issued | Deck, stairs or patio coverType unconfirmed | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Emily Guglielmo? Request a correction.