Franz Mutis
Engineer · Design Everest Consulting Eng · Houston
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-71963First issued Sep 21, 2007, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 6 permits since 2019, 6 in the last 5 years. Latest filed May 6, 2022.
- What kind of projects?
- Home remodel 2 · Addition 1 · Commercial or tenant improvement 1
- How long do their permits take?
- Addition: 19 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 2 permits in San Francisco
Time to get a permit
Median from filing to permit, from 1 issued permit filed since 1966.
Where
- Sunset/Parkside1
- Bayview Hunters Point1
Most recent
- 2242 48th Av2 bathroom remodel, kitchen remodel @ 2nd flNov 9, 2021Complete
- 1650 Quesada AvKitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same locationMar 24, 2021Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 5, 2025 | 822 Pacheco St Revision to pa #2021-0826-7155 lowered the top wall height, adding 3 stairs at the top and removing stairs from the bottom wall to the property line Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 3, 2025 | 822 Pacheco St Revision to permit 202108267155. changed the wall design from blocks to poured in place, added stairs and railing details. remove str strengthening Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 29, 2024 | 538 22nd Av Revision to 202205063720, pgs a0.0,a2.2, a2.3, a2.6, s2, 2nd fl roof slope, updated roof over bedroom to plan, updated door/window schedule, structural changes according to arch plans, added missing details Complete | Revision or supplement | Complete | Within 1 month | |
| May 6, 2022 | 538 22nd Av (n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding. Complete | Addition | Complete | 19 months | |
| Nov 9, 2021 | 2242 48th Av 2 bathroom remodel, kitchen remodel @ 2nd fl Complete | Home remodel | Complete | 3 months | |
| Aug 26, 2021 | 822 Pacheco St Voluntary foundation repair, structural strengthening and adding new backyard retaining walls. Complete | Seismic retrofit or foundation | Complete | 22 months | |
| Jul 7, 2021 | 635 Baker St #0 Reroofing Issued | Other | Issued | Within 1 month | |
| Mar 24, 2021 | 1650 Quesada Av Kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same location Withdrawn | Home remodel | Withdrawn | — | |
| Mar 18, 2021 | 8332 Geary Bl Revision to pa# 202011239555. upon further inspection, no structural work was needed for basement plan. Complete | Revision or supplement | Complete | 8 months | |
| Mar 15, 2019 | 836 Lyon St #0 Struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system. Approved | Commercial or tenant improvementType unconfirmed | Approved | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Franz Mutis? Request a correction.