Gary Clay Head
Architect · Gary Head & Le Vu · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34982First issued Mar 9, 2015, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 7 permits since 2016, 7 in the last 5 years. Latest filed Jul 18, 2026.
- What kind of projects?
- Home remodel 3 · Addition 3 · Other 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,386 permits.
Where
- Lone Mountain/USF1
- Potrero Hill1
- West of Twin Peaks1
Most recent
- 75 Barcelona AvReconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code complyJun 29, 2026Issued
- 480 Kansas StKitchen and two bath remodel, convert (e) living space to new bedroom and (e) bedroom to new living space remove (e) window and add new window aat new living room, remove two (e) skylights and add new skylight at new locationApr 13, 2023Complete
- 62 Allston WyVoluntary strengthening demo (e) interior stair add new interior stair for future chair lift add lower bthrm. relocate (e) interior utilities, add windows, replace windows, relocate garage dor. add french drain for site drainageFeb 10, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 18, 2026 | 49 Chula Ln Vert add'n and renovation.maintain/mod (e) gas hydronic heating and gas systems.mep deferred.1/f: new bathroom,enlarge laundry rm and reconfig switchback stair.2/f: relocation of (e) bath, englarge (e) bed, new bedroom & family rm. 3/f: relocate kitchen, dining and living space. Filed | Addition | Filed | — | |
| Jun 29, 2026 | 75 Barcelona Av Reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code comply Issued | Home remodel | Issued | Within 1 month | |
| Apr 13, 2023 | 480 Kansas St Kitchen and two bath remodel, convert (e) living space to new bedroom and (e) bedroom to new living space remove (e) window and add new window aat new living room, remove two (e) skylights and add new skylight at new location Complete | Home remodel | Complete | Within 1 month | |
| Apr 7, 2023 | 1714 Grant Av Revision to pa# 202207279402, corrected (e) fl elevation relative to sidewalk, corrvcted window tag ref and related window schedule, propose location of gas meter for pg&e, corrected note for existing sanitary sewage line, comply w/nov 202306138 Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 27, 2022 | 1714 Grant Av Revision to pa#201801027720 to reduce scope, includes less excavation, no bay window build out on front.eliminate proprosed facade extention at floor 2, replace with exterior balcany. demolition of rear build out currently indisrepair. remove proposed skylights. maintain extg lightwell to the south Complete | Revision or supplement | Complete | 7 months | |
| Feb 27, 2020 | 35 Temescal Tr Update facade - replace windows, new stucco, repair dryrot on front facade - non structural. note, all work is replacement in "like-kind" or equivalent. Complete | Other | Complete | Within 1 month | |
| Feb 11, 2019 | 434 Lisbon St Add conditioned space at ground level & attic (add dormer & 2 bathrooms), remodel (e) kitchen & bathroom main level. new rear deck. Complete | Addition | Complete | Within 1 month | |
| Feb 16, 2018 | 62 Allston Wy Revision to 201602109230. eliminate interior walls. rebuild scope of work. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 10, 2016 | 62 Allston Wy Voluntary strengthening demo (e) interior stair add new interior stair for future chair lift add lower bthrm. relocate (e) interior utilities, add windows, replace windows, relocate garage dor. add french drain for site drainage Complete | Home remodel | Complete | 4 months | |
| Jan 26, 2016 | 365 Day St New seismic upgrade foundation throughout. renovate kitchen & bath @ main level. expand upper level to add new master bedroom & bath plus additional bathroom. renovate garage to convert partial livable space. new communicating stair between all levels. Complete | AdditionType unconfirmed | Complete | 15 months | |
| Dec 13, 2012 | 1258 South Van Ness Av Revision to pa# 201210242748 to replace stucco facade with wood siding, visible from street. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 23, 2009 | 170 Clara St Revision to pa# 2007.12.31.1629. fur walls, level floor, reduce scope of deck wall. non structural work. Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Gary Clay Head? Request a correction.