Hans Rainer Baldauf
Architect · Bcv Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-22624First issued Sep 6, 1991, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 33 permits since 2012, 33 in the last 5 years. Latest filed Sep 23, 2026.
- What kind of projects?
- Commercial or tenant improvement 19 · Other 7 · Home remodel 2
- How long do their permits take?
- Deck, stairs or patio cover: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 19 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966; 1 still in review.
Where
- Russian Hill7
- North Beach6
- Financial District/South Beach2
- South of Market2
Most recent
- 731 Columbus Av1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config.Sep 23, 2026Filed
- 851 Beach St #0Tenant improvement for subpar expansion. work includes removal of interior partition between 2 e tenant spaces. construction of 2 single occ bathrooms. new non structural partitions.Sep 2, 2021Issued
- 890 Market StNon-structural interior demo of former tenant's buildout. retail areas on lower, main and 2nd levels only. demo of communicating stair from lower to main level; interior demo of drop and decorative ceiling; interior demo of stone and tile floors down to concrete slab; interior demo of non-loadAug 5, 2021Complete
- 250 Beach StInterior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lightingOct 17, 2019Complete
- 1705 Mariposa StTo comply with the accessible business entrance program per ordinance 51-16. regrading of sidewalkto remove single step. replacement of door hardware.Aug 30, 2019Cancelled
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 23, 2026 | 731 Columbus Av 1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config. Filed | Commercial or tenant improvement | Filed | — | |
| Feb 19, 2025 | 135 Locust St 1/fl- (n) steel trellis at rear of property Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Jun 13, 2024 | 135 Locust St Revision to pa 202110070082 (original permit) not inclusive of roof work. addition of rated skylight @ roof rev 1 ref pa 202304216262 Complete | Revision or supplement | Complete | 2 months | |
| Dec 5, 2023 | 165 Edgewood Av Revision to 202305248536: add laundry room to lower level (26 sqft). revise entry level framing and support posts and footings on lower level. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 11, 2023 | 165 Edgewood Av Addition of bay window at main/entry level Complete | Addition | Complete | 8 months | |
| Jun 8, 2023 | 165 Edgewood Av Replace exterior stair and roofing. repair roof framing Complete | Deck, stairs or patio coverType unconfirmed | Complete | 3 months | |
| Apr 21, 2023 | 135 Locust St Revision to address nov 202305978. to revise quantity of demolition & structural details not previously captured under pa#202110070082. foundation replacement, 202112094048 bp, 202206075813 & rev 202208120480 Complete | Revision or supplement | Complete | 10 months | |
| Aug 12, 2022 | 135 Locust St Revision to bpa#202112094048 & 202206075813 for minor facade/window alterations Expired | Revision or supplement | Expired | Within 1 month | |
| Jun 7, 2022 | 135 Locust St Revision to pa#202112094048. restoration and vertical extension of extg damaged flues being replaced in kind. restoration of oringinal double hung window at front facade to match existing windows. Expired | Revision or supplement | Expired | 1 month | |
| Dec 9, 2021 | 135 Locust St Renovation & structural upgrade of exiting house. convertion of attic to habitable space with dormers.removal of building mass at first & second floor levels at rear (west) facade. removal of enclosed stairs at south facade. Complete | Home remodelType unconfirmed | Complete | 3 months | |
| Oct 7, 2021 | 135 Locust St Foundation relace, relocation of stair between 1/f & basement. alt of (e) sideyard stairs. Expired | Seismic retrofit or foundation | Expired | 1 month | |
| Sep 2, 2021 | 851 Beach St #0 Tenant improvement for subpar expansion. work includes removal of interior partition between 2 e tenant spaces. construction of 2 single occ bathrooms. new non structural partitions. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 5, 2021 | 890 Market St Non-structural interior demo of former tenant's buildout. retail areas on lower, main and 2nd levels only. demo of communicating stair from lower to main level; interior demo of drop and decorative ceiling; interior demo of stone and tile floors down to concrete slab; interior demo of non-load Complete | Commercial or tenant improvement | Complete | 1 month | |
| Oct 17, 2019 | 250 Beach St Interior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lighting Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 30, 2019 | 1705 Mariposa St To comply with the accessible business entrance program per ordinance 51-16. regrading of sidewalkto remove single step. replacement of door hardware. Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Oct 31, 2018 | 900 North Point St #534 Change of use, bridal shop. installation of (n) backing for (e) partitions, new wall finishes, change of use from a-2 to m Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 12, 2018 | 4049 24th St Yoga retail sales and studio. demo interior bathroom walls, install toilets, sinks, shower. build wall for lobby and install partition operable wall. install & run lighting & supplemental infrared heaters. install floating wood floor, retail slat wall, fix drywall patches. ref n.o.v 201856911 Complete | Legalize or fix a violationType unconfirmed | Complete | 6 months | |
| Sep 12, 2018 | 303 02nd St 7th floor:roof terrace: replace the extg waterproofing at roof surfacing. add planters and build in seating. new landscape Cancelled | Other | Cancelled | Within 1 month | |
| Aug 31, 2018 | 250 Beach St Revision to app#201705176898. this permit to include interior work only.revise demising wall location. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 22, 2018 | 3150 Polk St Office in vacant space, work includes (n) partitions, (n) kitchenette, and (n) all gender restroom Issued | Commercial or tenant improvement | Issued | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Hans Rainer Baldauf? Request a correction.