Irving Antonio Gonzales
Architect · Gonzales Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-19332First issued Jun 14, 1988, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 40 permits since 2003, 40 in the last 5 years. Latest filed Mar 10, 2026.
- What kind of projects?
- Commercial or tenant improvement 13 · Other 9 · Home remodel 6
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Mission6
- Mission Bay2
- North Beach1
- Financial District/South Beach1
Most recent
- 474 Valencia StSte 230: interior tenant improvement to (e) office space with new finishes, lighting, & hvac modifications. replace (e) 13 windows.May 4, 2022Complete
- 1950 Mission StT.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenetteJan 12, 2021Complete
- 2800 Bryant StMinor abatement and demo of (e) ground flr commercial to receive rough-ins for future ada compliant restroom w/ shower and associated minor mechanical, plumbing, electrical work to this vacant commercial tenant space.Dec 16, 2020Complete
- 1554 Stockton StInterior alteration to extg flower shop to provide an accessible buildings entrance, minor floor demo, conventional framing, new finishes. accessible business entrance program per oridinance 51-15. maher n/a.Jul 2, 2020Complete
- 1385 04th StMinor interior alteration to provide & install a demising partition to divide an existing vacant ground floor retail space 6 & create retail space 7. all ti works under separated permit. space remain unoccupaied and qualify for ab-17 accessilbity exceptionJun 15, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 16, 2026 | 1840 Sutter St This a revision to an active permit # 202412096390 to record a field condition change as approved by filed inspector david l araiza. (1) restroom to remain as gender neutral & (1) designated as standard. Issued | Revision or supplement | Issued | 2 months | |
| Mar 10, 2026 | 5400 Geary Bl Erect new type 1a 8-stories mix-use building: 83 residental units w/ commercial. Filed | New building | Filed | — | |
| Dec 8, 2025 | 5400 Geary Bl Demo (e) 2-story type 2b theater. Triage | Other | Triage | — | |
| Dec 17, 2024 | 5400 Geary Bl Reconstruct blade sign - electric, roof, double faced wall sign. Filed | Other | Filed | — | |
| Dec 17, 2024 | 5400 Geary Bl Planning enforcement case # 2022-012075enf. includes but not limited to: interior cleaning/ removal of debris. provide protection of (e) interior features & murals. reconstruct blade sign & support tower. repair marquee & stabilize finish consition. repair vitrines. reinstall marquee soffit. Filed | Legalize or fix a violationType unconfirmed | Filed | — | |
| Aug 8, 2024 | 800 Presidio Av Resident bike storage reconfiguration to comply with enforcement case no# 2024-002998enf. to provide (25) bike spaces in accordance with 2a bulletin no. 9.new full height fence and gate, lockable Complete | Legalize or fix a violation | Complete | 4 months | |
| Feb 6, 2023 | 4646 03rd St Installing dph compliant food service mop sink and finishes for an accesory service to an existing fitness center as approved under pa# 201710191700. Complete | Revision or supplementType unconfirmed | Complete | 1 month | |
| May 4, 2022 | 474 Valencia St Ste 230: interior tenant improvement to (e) office space with new finishes, lighting, & hvac modifications. replace (e) 13 windows. Complete | Commercial or tenant improvement | Complete | 12 months | |
| Mar 16, 2022 | 3090 16th St Rooftop: provide structural block at (e) roof framing for future pv panel & (n) guardrail supports (reroofing & pv to be under sep permits by others). Complete | Home remodel | Complete | Within 1 month | |
| Feb 2, 2022 | 4801 03rd St New 1-story hcd state approved commercial modualr unit factory built kitchen. (for food service/restaurant use). scope to include site improvements work to site foundations, curbs, paving, mep, as well as scculptural corten steen rain screen enlosure & facade work to prepare for modular unit. Issued | New building | Issued | 15 months | |
| Jan 26, 2022 | 3090 16th St Repl like-for-like garage exhaust system, sump pump. upgrade gas water heater. add 4 washer/dryer units. upgrade water heater system. like for like units. Issued | Other | Issued | Within 1 month | |
| Jan 21, 2022 | 2800 Bryant St Revision of structural assemblies to suit field conditions & revise approved/issued bpa#202014161152 Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 12, 2021 | 1950 Mission St T.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenette Complete | Commercial or tenant improvementType unconfirmed | Complete | 6 months | |
| Dec 16, 2020 | 2800 Bryant St Seismic retrofit at 1st flr & basement of 3 story building. structural work. project is mandated by san francisco soft story ordinance. Complete | Seismic retrofit or foundation | Complete | 9 months | |
| Dec 16, 2020 | 2800 Bryant St Minor abatement and demo of (e) ground flr commercial to receive rough-ins for future ada compliant restroom w/ shower and associated minor mechanical, plumbing, electrical work to this vacant commercial tenant space. Complete | Commercial or tenant improvement | Complete | 9 months | |
| Jul 2, 2020 | 1554 Stockton St Interior alteration to extg flower shop to provide an accessible buildings entrance, minor floor demo, conventional framing, new finishes. accessible business entrance program per oridinance 51-15. maher n/a. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 15, 2020 | 1385 04th St Minor interior alteration to provide & install a demising partition to divide an existing vacant ground floor retail space 6 & create retail space 7. all ti works under separated permit. space remain unoccupaied and qualify for ab-17 accessilbity exception Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jan 29, 2019 | 3048 16th St Remove and replace extg sidewalk over basement at 16th street only. new structural supports and waterproofing membrane is included, along with replacement of extg gas line feed and meter per pg&e Complete | Deck, stairs or patio coverType unconfirmed | Complete | 1 month | |
| Aug 23, 2018 | 372 Sutter St Minor interior improvements to (e) tenant space for hair salon, minor plumbing (sinks) & electrical (receptacles) & decorative lighting-no structural work. (all interior work) Complete | Commercial or tenant improvement | Complete | 1 month | |
| Apr 23, 2018 | 5009 03rd St Change of use from office to restaurant. tenant improvement, kitchen remodel. new restrooms, minor framing & finish & finish, new hvac, mechan'l/electrical/plumbing. Cancelled | Commercial or tenant improvement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Irving Antonio Gonzales? Request a correction.