Jaime Pasion Arafiles
Engineer · Jaime Pasion Arafiles · Union City
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-40483First issued Aug 1, 1986, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 114 permits since 2007, 114 in the last 5 years. Latest filed Nov 10, 2025.
- What kind of projects?
- Home remodel 87 · Addition 5 · Legalize or fix a violation 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 87 permits in San Francisco
Time to get a permit
Median from filing to permit, from 83 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 10,692 permits.
Where
- Tenderloin26
- Nob Hill25
- Chinatown8
- Pacific Heights6
Most recent
- 250 Ortega StInterior kitchen remodel, reconfigure hallway bathroom and rear bedroom bathroom at second floor (top second floor)Nov 10, 2025Complete
- 131 Mallorca WySecond floor remodel. remodel kitchen on 2nd floor; add one bathroom adjacent to existing kitchen. all work on 2nd floor. change one 2nd floor bedroom to office.Nov 16, 2022Complete
- 714 Niagara AvConstruct (2) bedrms, (1) bathrm, laundry/utility area, & stairs to 2nd floor @ basement area. provide (n) exterior exit door to sidewalk & street. replace existing garage door. relocate existing water heater & install (n) furnace & heating system.upgrade elect.upgrade (e)wood deck @ 2nd floor.Mar 21, 2022Filed
- 201 Folsom St #41Penthouse b: existing vacant space for an interior remodel for 4 bedroom sfd with 4.5 baths, kitchen, dining, living, bar area. all existing perimeter enclosures to remain.Jun 28, 2021Complete
- 247 Madrid StConstruction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell.Jan 2, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 18, 2026 | 177 Golden Gate Av #0 Revision to 202512172006 and 202605141263. like for like ceiling removal and leave it exposed. replace wall, floor, and ceiling finishes for offices 102 - 108. Issued | Revision or supplement | Issued | Within 1 month | |
| May 14, 2026 | 177 Golden Gate Av #0 Revision to pa# 202512172006 convert existing 2nd floor restroom into an accessible restroom, extend walls per engineering plans Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 10, 2025 | 250 Ortega St Interior kitchen remodel, reconfigure hallway bathroom and rear bedroom bathroom at second floor (top second floor) Complete | Home remodel | Complete | Within 1 month | |
| May 22, 2024 | 278 28th Av Revision to 202211297266. add site drainage at backyard. reconfigure master bath and middle bedroom at 2nd fl. replace furnace with new furnace and heat pump. add laundry room to basement Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 30, 2024 | 278 28th Av Revision to 202211297266. new footing at garage storage area. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 28, 2023 | 1181 Church St Remove e rear staircase and 2nd level deck. replace with new staircase and deck w eleastomick. deck covering over new structural framing and foundation Filed | Deck, stairs or patio cover | Filed | — | |
| Nov 28, 2023 | 1177 Church St Remove e rear staircase and 2nd level deck. replace with new staircase and deck w eleastomick. deck covering over new structural framing and foundation Filed | Deck, stairs or patio cover | Filed | — | |
| Oct 24, 2023 | 132 Cortland Av #0 Revision to bpa#202210124235, add sheer walls, rear patio door changes from 10 feet to 12 feet Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 24, 2023 | 132 Cortland Av #0 Revision to pa# 202210124235. add egress window to basement. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 29, 2023 | 2183 Mission St Interior alteration for a dining area, kitchen area, existing ada compliant restrooms to remain. walk-in ref & freezer, service sink, new plumbing, new lighting, new electrical panel, grease trap. adding 2nd story floor. increase space. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Aug 14, 2023 | 1459 Oak St Replace e brick foundation in westside for new concrete foundation (33 linear feet) Complete | Seismic retrofit or foundation | Complete | 3 months | |
| Jun 15, 2023 | 3755 Balboa St #201 Accessible business entrance program per ordinamce 51-16 alter front exterior door swing abe #202001070699 Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Feb 27, 2023 | 71 Rondel Pl As is built final plan, windows sizes, storage room floor plan, maintain original enttry dimensions. revision to pa# 202108206804. to reflect as-built changes in field. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 29, 2022 | 131 Mallorca Wy Convert (e) first floor rear area into an adu per ord 95-17. Filed | ADU | Filed | — | |
| Nov 29, 2022 | 278 28th Av Build a 3 story rear addition,kitchen interior remodel and master bathroom remodel. Complete | Addition | Complete | 15 months | |
| Nov 16, 2022 | 131 Mallorca Wy Second floor remodel. remodel kitchen on 2nd floor; add one bathroom adjacent to existing kitchen. all work on 2nd floor. change one 2nd floor bedroom to office. Complete | Home remodel | Complete | Within 1 month | |
| Nov 10, 2022 | 1618 Quesada Av One-story rear buiding addition. interior bedroom remodel. deck addition over (e) garage lightwell. Issued | Addition | Issued | 29 months | |
| Oct 12, 2022 | 132 Cortland Av #0 2 story interior remodel. kitchen and bath remodel (kitchen & 1 bathroom under pa202207188732). relocate (e) 1/f bathroom. add powder room on 1st fl. relocate 1st fl bedroom.add 1 bathroom to 2/f. amend to pa 202207188732 Complete | Revision or supplement | Complete | 6 months | |
| Jun 17, 2022 | 201 Folsom St #41 Unit #41c: revision to pa# 202112073853. stair layout alteration (interior). Complete | Revision or supplement | Complete | 2 months | |
| Mar 21, 2022 | 714 Niagara Av Construct (2) bedrms, (1) bathrm, laundry/utility area, & stairs to 2nd floor @ basement area. provide (n) exterior exit door to sidewalk & street. replace existing garage door. relocate existing water heater & install (n) furnace & heating system.upgrade elect.upgrade (e)wood deck @ 2nd floor. Filed | Home remodelType unconfirmed | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jaime Pasion Arafiles? Request a correction.